Back to bathroom remodel contractors
Matrix Seismic Corp
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Aug 2011
- Last 24 months
- 0 permits filed
261 permits since 2000: 164 completed, 24 never finaled, 73 expired or cancelled.
Of the 24 never-finaled permits, 24 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 10 completed, 1 never finaled, 4 expired or cancelled. Typically 1 days from filing to permit and 170 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 19, 2011 | Completed final sign-off Oct 2011 | 2345 Larkin St | revision to 201112166866 for clarification of job scope per fire dept request. change of occupancy storage at basement to habitable space for 1 bedroom, 1 study, with 2 baths for unit 1. sprinkler under separate permit. enclose door and wall at stairs to one hour. relocate closet.Details
revision to 201112166866 for clarification of job scope per fire dept request. change of occupancy storage at basement to habitable space for 1 bedroom, 1 study, with 2 baths for unit 1. sprinkler under separate permit. enclose door and wall at stairs to one hour. relocate closet. | |
| Dec 16, 2010 | Completed final sign-off Oct 2011 | 2345 Larkin St | remodel unit# 1. new stair opening to floor below. convert master bedroom & 2nd bedroom with 2 new bathrooms. no exterior changes.Details
remodel unit# 1. new stair opening to floor below. convert master bedroom & 2nd bedroom with 2 new bathrooms. no exterior changes. | $25,000 |
| Jun 22, 2010 | Completed final sign-off Oct 2010 | 734 Bush St | fire damage building repair-demo & replace plaster in 1 room (unit #52), clean up walls, paint. repair windows, repair floorings. no adding new walls (front room facing bush st & small hallway & bathroom).Details
fire damage building repair-demo & replace plaster in 1 room (unit #52), clean up walls, paint. repair windows, repair floorings. no adding new walls (front room facing bush st & small hallway & bathroom). | $15,000 |
| Oct 29, 2009 | Expired or cancelled expired Dec 2010 | 995 Monterey Bl | remodel (e) two full bathrooms on main floor above garage. incl. remove, replace tiles, tubs, faucets and toiletsDetails
remodel (e) two full bathrooms on main floor above garage. incl. remove, replace tiles, tubs, faucets and toilets | $18,000 |
| Nov 4, 2008 | Completed final sign-off Nov 2008 | 211 Ofarrell St | to comply with nov# 200874293 for bathroom remodel in basement. by removing entire bathroom.Details
to comply with nov# 200874293 for bathroom remodel in basement. by removing entire bathroom. | $1,500 |
| Mar 1, 2006 | Completed final sign-off Jul 2006 | 1123 Sutter St | first floor bathroom re-configuration & front entrance level landing. as a revision to plan app no. 20010215221 umb bldngDetails
first floor bathroom re-configuration & front entrance level landing. as a revision to plan app no. 20010215221 umb bldng | $2,000 |
| Dec 2, 2005 | Completed final sign-off Dec 2006 | 640 Clay St | renovation of (e) bathrooms in 2/f,3/f & 4/fDetails
renovation of (e) bathrooms in 2/f,3/f & 4/f | $30,000 |
| Sep 15, 2005 | Expired or cancelled expired Feb 2006 | 980 Market St | "umb"general procedure.rev.appl#200312031523 for front steel frame,alt.to secondary posts & ada bathDetails
"umb"general procedure.rev.appl#200312031523 for front steel frame,alt.to secondary posts & ada bath | |
| Aug 3, 2005 | Completed final sign-off Mar 2006 | 445 Sutter St | voluntary upgrading the second floor bathrooms for title 24Details
voluntary upgrading the second floor bathrooms for title 24 | $20,000 |
| Jul 28, 2004 | Completed final sign-off Apr 2005 | 819 Ellis St | rev.appl#200109245663 "umb" to revise bathroom in 1/fDetails
rev.appl#200109245663 "umb" to revise bathroom in 1/f | |
| Apr 5, 2004 | Never finaled issued Apr 2004, no final | 536 Pacific Av | ada bathroom detail and new automatic door opener for the bathroom part of "umb" permit applnDetails
ada bathroom detail and new automatic door opener for the bathroom part of "umb" permit appln | |
| Sep 29, 2003 | Completed final sign-off Mar 2004 | 3425 Cesar Chavez St | t.i.work, part of seismic retrofitting plan appl#200306207246 including ramp/entrance/ada bathrooms,Details
t.i.work, part of seismic retrofitting plan appl#200306207246 including ramp/entrance/ada bathrooms, | $25,000 |
| Sep 24, 2003 | Completed final sign-off Apr 2005 | 819 Ellis St | "umb", extend ramp to basement and ada bathroomsDetails
"umb", extend ramp to basement and ada bathrooms | $90,000 |
| Mar 11, 2003 | Expired or cancelled expired Mar 2004 | 981 Mission St | changing the two regular bath room lay out of plan app#200302217984 & applying for the hardship forDetails
changing the two regular bath room lay out of plan app#200302217984 & applying for the hardship for | |
| Feb 20, 2002 | Expired or cancelled expired Aug 2002 | 1011 Market St | rev. appl#200011186115, 2 bathroom instead of 1, fully h/c. demo interior non-struc partition @2/flDetails
rev. appl#200011186115, 2 bathroom instead of 1, fully h/c. demo interior non-struc partition @2/fl | $16,000 |