Martin Heagney
- Based in
- San Francisco
- On San Francisco permits
- Jul 2018 to Nov 2025
- Last 24 months
- 5 permits filed
21 permits since 2000: 15 completed, 4 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 2 days from filing to permit and 440 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 13, 2021 | Completed final sign-off Mar 2023 | 787 Clayton St | unit 4: remodel kitchen and bathroom, entry closet. replace rear facing windows with energy efficient windows. no change to (e) openings.Details
unit 4: remodel kitchen and bathroom, entry closet. replace rear facing windows with energy efficient windows. no change to (e) openings. | $24,000 |
| Jul 16, 2019 | Completed final sign-off Sep 2019 | 915 Hamilton St | remove damaged by roof leak in hallway kitchen & bedroom. reinstall insulation & sheetrock. check for electrical damage. repair in kind.Details
remove damaged by roof leak in hallway kitchen & bedroom. reinstall insulation & sheetrock. check for electrical damage. repair in kind. | $4,000 |
| May 21, 2019 | Completed final sign-off Aug 2020 | 1520 Taylor St | unit # 603: remove, new walls extend kitchen into hallway, build wall between kitchen and office, extend bath walls in bedroomDetails
unit # 603: remove, new walls extend kitchen into hallway, build wall between kitchen and office, extend bath walls in bedroom | $25,000 |
| May 20, 2019 | Completed final sign-off Aug 2020 | 1520 Taylor St | (2) bathroom remodel: replace tile in shower, rpelace lights, replace toilet & sink. kitchen: replace all cabinets, rpelace appliances, replace 1/2 bath toilet, sink & faucet, upgrade electrical panel. tile floor.Details
(2) bathroom remodel: replace tile in shower, rpelace lights, replace toilet & sink. kitchen: replace all cabinets, rpelace appliances, replace 1/2 bath toilet, sink & faucet, upgrade electrical panel. tile floor. | $80,000 |