Permit GraphShortlistSan Francisco building permits since 2000

Martin Heagney

Contractor license
557986
State license record
Based in
San Francisco
On San Francisco permits
Jul 2018 to Nov 2025
Last 24 months
5 permits filed

21 permits since 2000: 15 completed, 4 in progress, 1 never finaled, 1 expired or cancelled.

Of the 1 never-finaled permit, 1 is 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Kitchen remodel permits

AllKitchen remodel 4Bathroom remodel 6

4 kitchen remodel permits: 4 completed. Typically 2 days from filing to permit and 440 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Aug 13, 2021Completed
final sign-off Mar 2023
787 Clayton Stunit 4: remodel kitchen and bathroom, entry closet. replace rear facing windows with energy efficient windows. no change to (e) openings.
Details
Permit
202108136442
Status
complete
Filed
Aug 13, 2021
Permit issued
Aug 16, 2021
Final sign-off
Mar 29, 2023
Declared cost
$24,000
Address
787 Clayton St

unit 4: remodel kitchen and bathroom, entry closet. replace rear facing windows with energy efficient windows. no change to (e) openings.

Open the permit page

$24,000
Jul 16, 2019Completed
final sign-off Sep 2019
915 Hamilton Stremove damaged by roof leak in hallway kitchen & bedroom. reinstall insulation & sheetrock. check for electrical damage. repair in kind.
Details
Permit
201907166070
Status
complete
Filed
Jul 16, 2019
Permit issued
Jul 16, 2019
Final sign-off
Sep 6, 2019
Declared cost
$4,000
Address
915 Hamilton St

remove damaged by roof leak in hallway kitchen & bedroom. reinstall insulation & sheetrock. check for electrical damage. repair in kind.

Open the permit page

$4,000
May 21, 2019Completed
final sign-off Aug 2020
1520 Taylor Stunit # 603: remove, new walls extend kitchen into hallway, build wall between kitchen and office, extend bath walls in bedroom
Details
Permit
201905211277
Status
complete
Filed
May 21, 2019
Permit issued
Jun 4, 2019
Final sign-off
Aug 5, 2020
Declared cost
$25,000
Address
1520 Taylor St

unit # 603: remove, new walls extend kitchen into hallway, build wall between kitchen and office, extend bath walls in bedroom

Open the permit page

$25,000
May 20, 2019Completed
final sign-off Aug 2020
1520 Taylor St(2) bathroom remodel: replace tile in shower, rpelace lights, replace toilet & sink. kitchen: replace all cabinets, rpelace appliances, replace 1/2 bath toilet, sink & faucet, upgrade electrical panel. tile floor.
Details
Permit
201905201132
Status
complete
Filed
May 20, 2019
Permit issued
May 20, 2019
Final sign-off
Aug 13, 2020
Declared cost
$80,000
Address
1520 Taylor St

(2) bathroom remodel: replace tile in shower, rpelace lights, replace toilet & sink. kitchen: replace all cabinets, rpelace appliances, replace 1/2 bath toilet, sink & faucet, upgrade electrical panel. tile floor.

Open the permit page

$80,000