Back to bathroom remodel contractors
Martin Heagney
- Based in
- San Francisco
- On San Francisco permits
- Jul 2018 to Nov 2025
- Last 24 months
- 5 permits filed
21 permits since 2000: 15 completed, 4 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 8 days from filing to permit and 361 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 20, 2022 | Completed final sign-off Mar 2023 | 221 Lake St | demo existing bathroom. install new bath as per existing layout with plumbing and electric to code. new shower vanity and tile work, sheetrock, tape, paintDetails
demo existing bathroom. install new bath as per existing layout with plumbing and electric to code. new shower vanity and tile work, sheetrock, tape, paint | $20,000 |
| Sep 9, 2021 | Completed final sign-off Jan 2023 | 1844 Union St | 2nd fl t.i. including renovation of (e) bathroom & break area. reeplace finishes including capret, paint & tile. new led lighy fixtures. replace existing windows in existing openings. front windows to be double hung wood, rear and side windows to be double hung aluminum clad wood.Details
2nd fl t.i. including renovation of (e) bathroom & break area. reeplace finishes including capret, paint & tile. new led lighy fixtures. replace existing windows in existing openings. front windows to be double hung wood, rear and side windows to be double hung aluminum clad wood. | $45,000 |
| Aug 13, 2021 | Completed final sign-off Mar 2023 | 787 Clayton St | unit 4: remodel kitchen and bathroom, entry closet. replace rear facing windows with energy efficient windows. no change to (e) openings.Details
unit 4: remodel kitchen and bathroom, entry closet. replace rear facing windows with energy efficient windows. no change to (e) openings. | $24,000 |
| Aug 26, 2019 | Completed final sign-off Jan 2020 | 303 Magellan Av | remove stucco in bathroom & bedroom livingroom in alley way, remove dryrot reframe & stucco to match existing. approx 150 sq ft area.Details
remove stucco in bathroom & bedroom livingroom in alley way, remove dryrot reframe & stucco to match existing. approx 150 sq ft area. | $5,000 |
| May 21, 2019 | Completed final sign-off Aug 2020 | 1520 Taylor St | unit # 603: remove, new walls extend kitchen into hallway, build wall between kitchen and office, extend bath walls in bedroomDetails
unit # 603: remove, new walls extend kitchen into hallway, build wall between kitchen and office, extend bath walls in bedroom | $25,000 |
| May 20, 2019 | Completed final sign-off Aug 2020 | 1520 Taylor St | (2) bathroom remodel: replace tile in shower, rpelace lights, replace toilet & sink. kitchen: replace all cabinets, rpelace appliances, replace 1/2 bath toilet, sink & faucet, upgrade electrical panel. tile floor.Details
(2) bathroom remodel: replace tile in shower, rpelace lights, replace toilet & sink. kitchen: replace all cabinets, rpelace appliances, replace 1/2 bath toilet, sink & faucet, upgrade electrical panel. tile floor. | $80,000 |