Back to kitchen remodel contractors
Marquez Builders
- Based in
- San Francisco
- On San Francisco permits
- Aug 2022 to Aug 2026
- Last 24 months
- 10 permits filed
28 permits since 2000: 19 completed, 9 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 4 completed, 2 in progress. Typically 50 days from filing to permit and 199 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 7, 2025 | In progress issued Aug 2025 | 831 27th St | reconfigure the ground floor layout to add a (n) bedroom & closets. excavate 23 cu.yrd to add a (n) storage/laundry room. remove (e) skylights, remodel kitchen in place. increase 238 sf habitable area.Details
reconfigure the ground floor layout to add a (n) bedroom & closets. excavate 23 cu.yrd to add a (n) storage/laundry room. remove (e) skylights, remodel kitchen in place. increase 238 sf habitable area. | $65,000 |
| May 21, 2025 | In progress issued May 2026 | 683 San Jose Av | proposed ground level adu (unit 2) interior addition & upper (unit 1) kitchen remodel. new foundation & lowered concrete floor slab. removed chimney for kitchen expansion. new ground level rear openings & lower yard. project seeks state adu program.Details
proposed ground level adu (unit 2) interior addition & upper (unit 1) kitchen remodel. new foundation & lowered concrete floor slab. removed chimney for kitchen expansion. new ground level rear openings & lower yard. project seeks state adu program. | $310,000 |
| Feb 8, 2024 | Completed final sign-off May 2024 | 358 Missouri St | ti to upper level unit to include addition of partition wall in living room to add w&d hookups and (n) addition of half bathroom at 3rd level. remodel (e) full bathroom with new finishes and fixtures and remodel kitchen in kind with new fixtures and finishes. new paint throughout unit, as needDetails
ti to upper level unit to include addition of partition wall in living room to add w&d hookups and (n) addition of half bathroom at 3rd level. remodel (e) full bathroom with new finishes and fixtures and remodel kitchen in kind with new fixtures and finishes. new paint throughout unit, as need | $75,000 |
| Dec 19, 2023 | Completed final sign-off Jan 2025 | 569 Hill St | level 1: no work. level 2: new wall, infill extg wall at family room, remove interior partitions and reconfigure kitchen. level 3: new laudry, reconfigure bedrooms and bath 2. new primary bath. roof: new skylight.Details
level 1: no work. level 2: new wall, infill extg wall at family room, remove interior partitions and reconfigure kitchen. level 3: new laudry, reconfigure bedrooms and bath 2. new primary bath. roof: new skylight. | $125,000 |
| Sep 20, 2023 | Completed final sign-off Nov 2023 | 520 Chestnut St | #101: install kitchen cabinets counter tops, patch drywall 1 ft through out living area, match paint and new drywall.repair due to water damageDetails
#101: install kitchen cabinets counter tops, patch drywall 1 ft through out living area, match paint and new drywall.repair due to water damage | $15,000 |
| Aug 15, 2022 | Completed final sign-off Jan 2025 | 779 18th Av | 2-story addition, attached to (e) 3-story single-family residence. new study & library connected to (e) ground level laundry room & 2nd level kitchen. new bathroom, sleeping area, & provisions for a future kitchen on ground level, connected to above with new interior stair & elevator.Details
2-story addition, attached to (e) 3-story single-family residence. new study & library connected to (e) ground level laundry room & 2nd level kitchen. new bathroom, sleeping area, & provisions for a future kitchen on ground level, connected to above with new interior stair & elevator. | $500,000 |