Back to bathroom remodel contractors
Marquez Builders
- Based in
- San Francisco
- On San Francisco permits
- Aug 2022 to Aug 2026
- Last 24 months
- 10 permits filed
28 permits since 2000: 19 completed, 9 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 5 completed, 2 in progress. Typically 101 days from filing to permit and 309 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 1, 2025 | In progress issued May 2026 | 460 Fair Oaks St | expand unit on level 1 (#462a) to add a bathroom and relocate bedrooms. interior remodel/reconfigure level 2 (#460) & level 3 (#462). add new 297 sqft roof deck.Details
expand unit on level 1 (#462a) to add a bathroom and relocate bedrooms. interior remodel/reconfigure level 2 (#460) & level 3 (#462). add new 297 sqft roof deck. | $429,000 |
| Apr 25, 2025 | In progress issued Aug 2025 | 831 27th St | 2nd/fl- primary suite reconfigure bath and closet spaces, add rear facing window in bath. second bathroom replace tub with shower, replace fixtures and finishes. relocate skylight to be min 5 ft from property line. no work visible from street.Details
2nd/fl- primary suite reconfigure bath and closet spaces, add rear facing window in bath. second bathroom replace tub with shower, replace fixtures and finishes. relocate skylight to be min 5 ft from property line. no work visible from street. | $27,000 |
| Feb 8, 2024 | Completed final sign-off May 2024 | 358 Missouri St | ti to upper level unit to include addition of partition wall in living room to add w&d hookups and (n) addition of half bathroom at 3rd level. remodel (e) full bathroom with new finishes and fixtures and remodel kitchen in kind with new fixtures and finishes. new paint throughout unit, as needDetails
ti to upper level unit to include addition of partition wall in living room to add w&d hookups and (n) addition of half bathroom at 3rd level. remodel (e) full bathroom with new finishes and fixtures and remodel kitchen in kind with new fixtures and finishes. new paint throughout unit, as need | $75,000 |
| Dec 19, 2023 | Completed final sign-off Jan 2025 | 569 Hill St | level 1: no work. level 2: new wall, infill extg wall at family room, remove interior partitions and reconfigure kitchen. level 3: new laudry, reconfigure bedrooms and bath 2. new primary bath. roof: new skylight.Details
level 1: no work. level 2: new wall, infill extg wall at family room, remove interior partitions and reconfigure kitchen. level 3: new laudry, reconfigure bedrooms and bath 2. new primary bath. roof: new skylight. | $125,000 |
| Oct 20, 2023 | Completed final sign-off Jan 2024 | 2288 Filbert St | remodel (e)bathroom to upgrade plumbing fixtures, electrical fixtures, (n)drywall for gypsum replacement only, (n)door to replace (e)door at same location of bathroom and paint. replace (e)window in-kind at bathroom not visible from street. no new wall and no (e)wall relocation. light cec 150.0(k)5.Details
remodel (e)bathroom to upgrade plumbing fixtures, electrical fixtures, (n)drywall for gypsum replacement only, (n)door to replace (e)door at same location of bathroom and paint. replace (e)window in-kind at bathroom not visible from street. no new wall and no (e)wall relocation. light cec 150.0(k)5. | $15,000 |
| Jul 14, 2023 | Completed final sign-off Nov 2024 | 3801 Balboa St | repair water damage to teacher's lounge bathroom: bath fixtures and finishes. repair wood decay due to water damage(non structural). all current electrical: gfi, led lighting, etc.Details
repair water damage to teacher's lounge bathroom: bath fixtures and finishes. repair wood decay due to water damage(non structural). all current electrical: gfi, led lighting, etc. | $5,000 |
| Aug 15, 2022 | Completed final sign-off Jan 2025 | 779 18th Av | 2-story addition, attached to (e) 3-story single-family residence. new study & library connected to (e) ground level laundry room & 2nd level kitchen. new bathroom, sleeping area, & provisions for a future kitchen on ground level, connected to above with new interior stair & elevator.Details
2-story addition, attached to (e) 3-story single-family residence. new study & library connected to (e) ground level laundry room & 2nd level kitchen. new bathroom, sleeping area, & provisions for a future kitchen on ground level, connected to above with new interior stair & elevator. | $500,000 |