Back to kitchen remodel contractors
Marina Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2019 to Dec 2025
- Last 24 months
- 1 permit filed
13 permits since 2000: 12 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 0 days from filing to permit and 84 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 5, 2023 | Completed final sign-off Sep 2023 | 901 Powell St | kitchen: replace cabinets, countertop, kitchen plumbing fixtures in kind, add hood exhuast vent, reconfigure patio doors. add refrigerator circuit, 240v oven circuit, refrigerator ice maker line. paint. no structural demo. terminate 3' from pl & openings into the bldg, not discharge public walkway.Details
kitchen: replace cabinets, countertop, kitchen plumbing fixtures in kind, add hood exhuast vent, reconfigure patio doors. add refrigerator circuit, 240v oven circuit, refrigerator ice maker line. paint. no structural demo. terminate 3' from pl & openings into the bldg, not discharge public walkway. | $30,000 |
| Mar 9, 2023 | Completed final sign-off May 2023 | 875 La Playa | revision to permit# 202301190373: replace kitchen cabinets; kitchen sink; kitchen faucet; countertop. electrical: move subpanel from hallway closet to hallway wall. revision to permit 202301190373.Details
revision to permit# 202301190373: replace kitchen cabinets; kitchen sink; kitchen faucet; countertop. electrical: move subpanel from hallway closet to hallway wall. revision to permit 202301190373. | $36,000 |
| Apr 18, 2019 | Completed final sign-off Jan 2021 | 518 21st Av | remodel kitchen and 2 bathrooms, install recessed lighting in all rooms, install insulation, no change to (e) floor planDetails
remodel kitchen and 2 bathrooms, install recessed lighting in all rooms, install insulation, no change to (e) floor plan | $38,000 |