Back to bathroom remodel contractors
Marina Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2019 to Dec 2025
- Last 24 months
- 1 permit filed
13 permits since 2000: 12 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 in progress. Typically 1 days from filing to permit and 124 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 15, 2025 | In progress issued Dec 2025 | 401 Orizaba Av | re-configure (e) bathroom to 2 bathrooms; convert existing garage to bedroom; 3rd fl - add new full bathDetails
re-configure (e) bathroom to 2 bathrooms; convert existing garage to bedroom; 3rd fl - add new full bath | $60,000 |
| Jan 19, 2023 | Completed final sign-off May 2023 | 875 La Playa | unit 474: remodel hallway and master bathrooms: replace ceiling, vanity wall, lights, ventilation fans, bathtub, shower pan, toilets, wall and floor tiles. (two bathrooms total). in kind remodelDetails
unit 474: remodel hallway and master bathrooms: replace ceiling, vanity wall, lights, ventilation fans, bathtub, shower pan, toilets, wall and floor tiles. (two bathrooms total). in kind remodel | $30,000 |
| Nov 23, 2021 | Completed final sign-off Dec 2021 | 1242 Taylor St | unit 4 and 6: replace 2 bathroom vinyl windows in existing lightwell. non visible from street. non hazardous locations. u-factor<0.58Details
unit 4 and 6: replace 2 bathroom vinyl windows in existing lightwell. non visible from street. non hazardous locations. u-factor<0.58 | $2,000 |
| Jul 23, 2021 | Completed final sign-off Dec 2021 | 1242 Taylor St | unit #6: remodel bathroom and repair dryrot, no alteration wall, windows and door.Details
unit #6: remodel bathroom and repair dryrot, no alteration wall, windows and door. | $25,000 |
| Jul 23, 2021 | Completed final sign-off Dec 2021 | 1242 Taylor St | unit #4: remodel bathroom and repair dryrot. no alteration of wall, window & door.Details
unit #4: remodel bathroom and repair dryrot. no alteration of wall, window & door. | $20,000 |
| Apr 18, 2019 | Completed final sign-off Jan 2021 | 518 21st Av | remodel kitchen and 2 bathrooms, install recessed lighting in all rooms, install insulation, no change to (e) floor planDetails
remodel kitchen and 2 bathrooms, install recessed lighting in all rooms, install insulation, no change to (e) floor plan | $38,000 |