Marchetti Construction Inc.
- Based in
- S San Francisco
- On San Francisco permits
- May 2000 to Apr 2015
- Last 24 months
- 0 permits filed
116 permits since 2000: 85 completed, 16 never finaled, 15 expired or cancelled.
Of the 16 never-finaled permits, 16 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 56 days from filing to permit and 464 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 16, 2004 | Completed final sign-off May 2006 | 335 Powell St | remodel (e) restaurant/bar & commercial kitchen, associated work new stone floor in adj, lobby, openDetails
remodel (e) restaurant/bar & commercial kitchen, associated work new stone floor in adj, lobby, open | $1,700,000 |
| Aug 15, 2001 | Completed final sign-off Feb 2003 | 625 Polk St | remodel (e) lecture rm into teaching kitchen demonstration lecture rm remodel corridor in basement,Details
remodel (e) lecture rm into teaching kitchen demonstration lecture rm remodel corridor in basement, | $300,000 |
| Jul 7, 2000 | Completed final sign-off Jul 2001 | 335 Powell St | remove existing walk-in cooler boxes (6) in main kitchen & structure floor slab belowDetails
remove existing walk-in cooler boxes (6) in main kitchen & structure floor slab below | $15,000 |
| May 17, 2000 | Completed final sign-off Jul 2001 | 335 Powell St | phase 3-main kitchen floor slab reconstruction project,new walk-in cooler boxes to be installedDetails
phase 3-main kitchen floor slab reconstruction project,new walk-in cooler boxes to be installed | $200,000 |