Back to kitchen remodel contractors
Mani Builders
- Based in
- South Gate
- On San Francisco permits
- Nov 2016 to Nov 2016
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 never finaled. Typically 61 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 17, 2016 | Never finaled issued Jan 2017, no final | 121 Spear St | b-09 change of use from vacant retail to restaurant. glass partitions, stainless steel partitions, elect & plumbing, low voltage work, exterior glass doors, duct work (all exposed ceiling) kitchen equipment/counter/led lighting, concrete flr sealer/base cave 3/8" ridious throughout dining & kitchen.Details
b-09 change of use from vacant retail to restaurant. glass partitions, stainless steel partitions, elect & plumbing, low voltage work, exterior glass doors, duct work (all exposed ceiling) kitchen equipment/counter/led lighting, concrete flr sealer/base cave 3/8" ridious throughout dining & kitchen. | $100,000 |