Back to kitchen remodel contractors
Man Hao Chen
- Based in
- San Francisco
- On San Francisco permits
- Nov 2023 to Sep 2026
- Last 24 months
- 20 permits filed
23 permits since 2000: 14 completed, 8 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 5 completed, 2 in progress. Typically 0 days from filing to permit and 123 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 17, 2026 | In progress issued Aug 2026 | 573 Arkansas St | 2/f remodel kitchen in kind. ground level remodel bathroom in kind.Details
2/f remodel kitchen in kind. ground level remodel bathroom in kind. | $30,000 |
| Jul 29, 2026 | In progress issued Jul 2026 | 1487 37th Av | remodel a kitchen. all in kind.Details
remodel a kitchen. all in kind. | $25,000 |
| Jun 30, 2026 | Completed final sign-off Sep 2026 | 2684 Green St | remove (e) door between dining room and kitchen and enlarge the opening. create a second opening between dining room and kitchen, rmeove and relocate (e) cabinets, relocate (e) electrical subpanel.Details
remove (e) door between dining room and kitchen and enlarge the opening. create a second opening between dining room and kitchen, rmeove and relocate (e) cabinets, relocate (e) electrical subpanel. | $28,000 |
| Dec 4, 2025 | Completed final sign-off Mar 2026 | 1862 40th Av | remodel kitchen and bathroom, upgrade electrical wiring, replace cabinets, replace tub to tub, toilet, sink, all like for like. no removal of wallsDetails
remodel kitchen and bathroom, upgrade electrical wiring, replace cabinets, replace tub to tub, toilet, sink, all like for like. no removal of walls | $30,000 |
| Oct 21, 2025 | Completed final sign-off Aug 2026 | 320 Wawona St | remodel kitchen upgrade electric wires, replace cabinets. no removal of wallsDetails
remodel kitchen upgrade electric wires, replace cabinets. no removal of walls | $20,000 |
| Jun 16, 2025 | Completed final sign-off Oct 2025 | 1587 40th Av | remodel a kitchen and a bathroom.Details
remodel a kitchen and a bathroom. | $20,000 |
| Apr 18, 2024 | Completed final sign-off Sep 2024 | 1483 37th Av | remodel kitchen to replace cabinets, appliances and lighting. no change to residence sq ft, exterior walls, exterior door, exteriro windows or roof.Details
remodel kitchen to replace cabinets, appliances and lighting. no change to residence sq ft, exterior walls, exterior door, exteriro windows or roof. | $10,000 |