Back to bathroom remodel contractors
Man Hao Chen
- Based in
- San Francisco
- On San Francisco permits
- Nov 2023 to Sep 2026
- Last 24 months
- 20 permits filed
23 permits since 2000: 14 completed, 8 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
8 bathroom remodel permits: 4 completed, 3 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 114 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 28, 2026 | In progress issued Aug 2026 | 573 Arkansas St | 2nd floor: convert bedroom 3 (located at front of building) into a junior ensuite with bathroom and closet; remodel (e) bathroom, build a new powder room and coat closet, build a laundry closet with a stackable washer/ dryer.Details
2nd floor: convert bedroom 3 (located at front of building) into a junior ensuite with bathroom and closet; remodel (e) bathroom, build a new powder room and coat closet, build a laundry closet with a stackable washer/ dryer. | $38,000 |
| Aug 17, 2026 | In progress issued Aug 2026 | 573 Arkansas St | 2/f remodel kitchen in kind. ground level remodel bathroom in kind.Details
2/f remodel kitchen in kind. ground level remodel bathroom in kind. | $30,000 |
| May 11, 2026 | Completed final sign-off Aug 2026 | 1475 37th Av | remodel (1) bathroom.Details
remodel (1) bathroom. | $8,000 |
| Apr 1, 2026 | Expired or cancelled cancelled Aug 2026 | 122 12th Av | remodel a bathroom on 2nd floor in kindDetails
remodel a bathroom on 2nd floor in kind | $4,500 |
| Dec 18, 2025 | Completed final sign-off Aug 2026 | 320 Wawona St | remodel existing ground floor habitable space. convert rear bedroom into master bedroom ensuite. remove existing bathroom & build new master bath 2. replace patio door & side blocks w/ new 8 foot wide sliding glass door.add new header. replace(e) hvac unit w/ new hvac unitDetails
remodel existing ground floor habitable space. convert rear bedroom into master bedroom ensuite. remove existing bathroom & build new master bath 2. replace patio door & side blocks w/ new 8 foot wide sliding glass door.add new header. replace(e) hvac unit w/ new hvac unit | $50,000 |
| Dec 4, 2025 | Completed final sign-off Mar 2026 | 1862 40th Av | remodel kitchen and bathroom, upgrade electrical wiring, replace cabinets, replace tub to tub, toilet, sink, all like for like. no removal of wallsDetails
remodel kitchen and bathroom, upgrade electrical wiring, replace cabinets, replace tub to tub, toilet, sink, all like for like. no removal of walls | $30,000 |
| Jun 16, 2025 | Completed final sign-off Oct 2025 | 1587 40th Av | remodel a kitchen and a bathroom.Details
remodel a kitchen and a bathroom. | $20,000 |
| Nov 3, 2023 | In progress issued Aug 2024 | 1782 39th Av | convert ground floor garage / storage into acessory dwelling unit (a.d.u.)build a two-bedroom, two-bathroom.build an exit passageway from the rear yard to the front yard.install new tankless water heater & mini package units.no new work on the second and third floors. (2 units + adu)Details
convert ground floor garage / storage into acessory dwelling unit (a.d.u.)build a two-bedroom, two-bathroom.build an exit passageway from the rear yard to the front yard.install new tankless water heater & mini package units.no new work on the second and third floors. (2 units + adu) | $285,000 |