Back to kitchen remodel contractors
Makita Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Apr 2013 to May 2025
- Last 24 months
- 1 permit filed
24 permits since 2000: 19 completed, 1 in progress, 4 never finaled.
Of the 4 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 5 completed, 1 never finaled. Typically 16 days from filing to permit and 154 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 13, 2022 | Completed final sign-off Jul 2022 | 671 05th Av | revision to permit 202203180319. reduction of scope of work. kitchen remodel reduced to countertop and sink only (replace in kind). remove all work from 2/f kitchen. no alterations to 2f kitchen - existing 2f kitchen to remain as is other than noted above.Details
revision to permit 202203180319. reduction of scope of work. kitchen remodel reduced to countertop and sink only (replace in kind). remove all work from 2/f kitchen. no alterations to 2f kitchen - existing 2f kitchen to remain as is other than noted above. | |
| Mar 18, 2022 | Completed final sign-off Jul 2022 | 671 05th Av | comply with complaint: 202183521 legalize rooms down at grnd lvel with out permit. kitchen sink and full bath. kitchen remodel 2nd fl: cabinets, sink, countertopDetails
comply with complaint: 202183521 legalize rooms down at grnd lvel with out permit. kitchen sink and full bath. kitchen remodel 2nd fl: cabinets, sink, countertop | $5,000 |
| Nov 6, 2018 | Completed final sign-off Jun 2019 | 680 Clay St | interior t.i. bathroom upgrade to ada. new kitchen hood and outlet. non bearing wall.Details
interior t.i. bathroom upgrade to ada. new kitchen hood and outlet. non bearing wall. | $95,000 |
| Apr 3, 2018 | Never finaled issued Apr 2021, no final | 20 Inverness Dr | relocate (e) kitchen from 2nd fl to 1st fl; remove (e) staircase @ front in living space; add 3rd fl w/ (n) great rm & deck (vertical addition).Details
relocate (e) kitchen from 2nd fl to 1st fl; remove (e) staircase @ front in living space; add 3rd fl w/ (n) great rm & deck (vertical addition). | $400,000 |
| Mar 26, 2015 | Completed final sign-off Sep 2015 | 806 35th Av | residential remodel, enlcose e lightwell at 2 fl, convert powder room to full bath, remodel 2 existing bathrooms, floor relacement, kitchen cabinets, englarge garage doorDetails
residential remodel, enlcose e lightwell at 2 fl, convert powder room to full bath, remodel 2 existing bathrooms, floor relacement, kitchen cabinets, englarge garage door | $95,000 |
| Sep 26, 2013 | Completed final sign-off May 2014 | 211 Clement St | renovate existing restaurant dining & kitchen area. renovate (e) store front with new and restroom with new and install automatic door opener to meet ada standard. replace exterior dryrotted wood platform (+/- 2' above grade) with new @ rear of building.Details
renovate existing restaurant dining & kitchen area. renovate (e) store front with new and restroom with new and install automatic door opener to meet ada standard. replace exterior dryrotted wood platform (+/- 2' above grade) with new @ rear of building. | $80,000 |