Back to kitchen remodel contractors
Magnolia Electric ** Check Notes**
- Based in
- San Francisco
- On San Francisco permits
- Dec 2009 to Feb 2022
- Last 24 months
- 0 permits filed
11 permits since 2000: 11 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 60 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 17, 2018 | Completed final sign-off Apr 2019 | 39 Chicago Wy | replacing kitchen cabinets - electrical plumbing. no walls moved, removed, added ifilled all existing layouts to remain unchanged.Details
replacing kitchen cabinets - electrical plumbing. no walls moved, removed, added ifilled all existing layouts to remain unchanged. | $21,000 |
| Dec 17, 2018 | Completed final sign-off Mar 2019 | 39 Chicago Wy | replacing living room, 2 bedrrom, 2 kitchen windows.Details
replacing living room, 2 bedrrom, 2 kitchen windows. | $3,500 |
| Dec 30, 2016 | Completed final sign-off Feb 2017 | 263 South Van Ness Av | replace kitchen cabinets, bath, vanity cabinets, medicine cabinets, tile bath floor, remove existing pocket door and replace by drywallDetails
replace kitchen cabinets, bath, vanity cabinets, medicine cabinets, tile bath floor, remove existing pocket door and replace by drywall | $7,500 |
| Sep 12, 2011 | Completed final sign-off Oct 2011 | 466 Linden St | replace (1) kitchen cabinets, counter tops.Details
replace (1) kitchen cabinets, counter tops. | $8,000 |
| Mar 10, 2011 | Completed final sign-off May 2011 | 464 Linden St | kitchen and bathroom upgrade, 100% fluorescent lighting, no structural work, no door, windows, walls change.Details
kitchen and bathroom upgrade, 100% fluorescent lighting, no structural work, no door, windows, walls change. | $12,000 |