Magnolia Electric ** Check Notes**
- Based in
- San Francisco
- On San Francisco permits
- Dec 2009 to Feb 2022
- Last 24 months
- 0 permits filed
11 permits since 2000: 11 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 248 days from filing to permit and 221 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 15, 2022 | Completed final sign-off May 2022 | 532 08th Av | removing tiles from deck, cutting stucco 1' over the floor, water proof the deck, stanless steel flashing restucco, re-tile floor.Details
removing tiles from deck, cutting stucco 1' over the floor, water proof the deck, stanless steel flashing restucco, re-tile floor. | $26,000 |
| May 20, 2015 | Completed final sign-off Sep 2017 | 839 14th St | installation of fence/wall at the front of the building, sliding glass doors unit #839; remove canopy at rear. new deck & stair in rear.Details
installation of fence/wall at the front of the building, sliding glass doors unit #839; remove canopy at rear. new deck & stair in rear. | $75,000 |