Back to kitchen remodel contractors
Maginn Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2004 to Nov 2022
- Last 24 months
- 0 permits filed
42 permits since 2000: 39 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 11 completed. Typically 7 days from filing to permit and 357 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 10, 2022 | Completed final sign-off Feb 2024 | 175 Valley St | addition of (1/2) bath, renovation of (e) kitchen & bath, upgrade electrical throughout, new gyp board/insulation, new windows. no addition to bldg envelope, no front facade alterationDetails
addition of (1/2) bath, renovation of (e) kitchen & bath, upgrade electrical throughout, new gyp board/insulation, new windows. no addition to bldg envelope, no front facade alteration | $390,000 |
| Oct 9, 2019 | Completed final sign-off Jun 2021 | 1152 De Haro St | enclose entry. removation to int including kitchen and bathrooms and replacement to int staircase. replacement windows, doors and siding at front and rear facade. struct beam and footing addedDetails
enclose entry. removation to int including kitchen and bathrooms and replacement to int staircase. replacement windows, doors and siding at front and rear facade. struct beam and footing added | $225,000 |
| Nov 15, 2018 | Completed final sign-off Nov 2019 | 1539 18th Av | renovation of interior at upper level, remodel kitchen in place, remodel 1 bathroom & closets into 1.5 bathrooms & closetsDetails
renovation of interior at upper level, remodel kitchen in place, remodel 1 bathroom & closets into 1.5 bathrooms & closets | $70,000 |
| Dec 16, 2016 | Completed final sign-off Nov 2018 | 132 Vicksburg St | remodel (e) living room, dining room, kitchen and bathroom at 2nd flr. new sliding glass doors to rear deck, lower floor framing at (e) family room, new gas fireplace at living room.Details
remodel (e) living room, dining room, kitchen and bathroom at 2nd flr. new sliding glass doors to rear deck, lower floor framing at (e) family room, new gas fireplace at living room. | $142,000 |
| Apr 22, 2014 | Completed final sign-off Oct 2015 | 432 Ivy St | alteration to interior layouts, install new windows at kitchen and dining room. new framing as needed at back. windows not visible from street.Details
alteration to interior layouts, install new windows at kitchen and dining room. new framing as needed at back. windows not visible from street. | $50,000 |
| Apr 19, 2013 | Completed final sign-off Oct 2013 | 2619 Laguna St | remodel (e) kitchen, breakfast area and powder room. no structural work. replace and or repair cabinets. new countertops, hardwood floors. install fire sprinklers at kitchen.Details
remodel (e) kitchen, breakfast area and powder room. no structural work. replace and or repair cabinets. new countertops, hardwood floors. install fire sprinklers at kitchen. | $32,000 |
| Jul 10, 2012 | Completed final sign-off Dec 2012 | 2314 48th Av | remove existing front facade-shingles, balcony, install new bay window and window at kitchen, new stucco and veneer stone at front facadeDetails
remove existing front facade-shingles, balcony, install new bay window and window at kitchen, new stucco and veneer stone at front facade | $31,500 |
| Mar 9, 2011 | Completed final sign-off Sep 2011 | 2581 21st Av | installation of new kitchen cabinets, light to comply with cec 105(k). no change to window, walls & doorsDetails
installation of new kitchen cabinets, light to comply with cec 105(k). no change to window, walls & doors | $17,000 |
| Dec 3, 2009 | Completed final sign-off Aug 2011 | 4345 25th St | horizontal addition - new deck @ garden level, 1st & 2nd floor addition, new dormer, kitchen remodel, powder room addiiton, add basement door at street level, upgrade basement structural support.Details
horizontal addition - new deck @ garden level, 1st & 2nd floor addition, new dormer, kitchen remodel, powder room addiiton, add basement door at street level, upgrade basement structural support. | $170,000 |
| Sep 23, 2008 | Completed final sign-off Apr 2009 | 1471 Mcallister St | remove kitchen cabinest and install new cabinets, plumbing fixtures, wood floring, storage area to be 2nd bath room, install lighting fixtures at kitchen & 2nd bath.Details
remove kitchen cabinest and install new cabinets, plumbing fixtures, wood floring, storage area to be 2nd bath room, install lighting fixtures at kitchen & 2nd bath. | $75,000 |
| Aug 31, 2007 | Completed final sign-off Dec 2007 | 381 Noe St | 1st floor-interior kitchen /bath remodel at rear of house, add bathtub,remove two walls, new fixtures,partition walls cabinetsDetails
1st floor-interior kitchen /bath remodel at rear of house, add bathtub,remove two walls, new fixtures,partition walls cabinets | $60,000 |