Back to bathroom remodel contractors
Maginn Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2004 to Nov 2022
- Last 24 months
- 0 permits filed
42 permits since 2000: 39 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 13 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 205 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 10, 2022 | Completed final sign-off Feb 2024 | 175 Valley St | addition of (1/2) bath, renovation of (e) kitchen & bath, upgrade electrical throughout, new gyp board/insulation, new windows. no addition to bldg envelope, no front facade alterationDetails
addition of (1/2) bath, renovation of (e) kitchen & bath, upgrade electrical throughout, new gyp board/insulation, new windows. no addition to bldg envelope, no front facade alteration | $390,000 |
| Oct 9, 2019 | Completed final sign-off Jun 2021 | 1152 De Haro St | enclose entry. removation to int including kitchen and bathrooms and replacement to int staircase. replacement windows, doors and siding at front and rear facade. struct beam and footing addedDetails
enclose entry. removation to int including kitchen and bathrooms and replacement to int staircase. replacement windows, doors and siding at front and rear facade. struct beam and footing added | $225,000 |
| Nov 15, 2018 | Completed final sign-off Nov 2019 | 1539 18th Av | renovation of interior at upper level, remodel kitchen in place, remodel 1 bathroom & closets into 1.5 bathrooms & closetsDetails
renovation of interior at upper level, remodel kitchen in place, remodel 1 bathroom & closets into 1.5 bathrooms & closets | $70,000 |
| Sep 26, 2017 | Expired or cancelled cancelled Feb 2018 | 119 Vicksburg St | gut bathroom and replace in kind. shower vanity, toilet, medicine cabinetDetails
gut bathroom and replace in kind. shower vanity, toilet, medicine cabinet | $49,000 |
| Dec 16, 2016 | Completed final sign-off Nov 2018 | 132 Vicksburg St | remodel (e) living room, dining room, kitchen and bathroom at 2nd flr. new sliding glass doors to rear deck, lower floor framing at (e) family room, new gas fireplace at living room.Details
remodel (e) living room, dining room, kitchen and bathroom at 2nd flr. new sliding glass doors to rear deck, lower floor framing at (e) family room, new gas fireplace at living room. | $142,000 |
| Jun 7, 2016 | Completed final sign-off Jan 2017 | 213 04th Av | existing 2 bathroom remodel at 3rd fl.Details
existing 2 bathroom remodel at 3rd fl. | $40,000 |
| Feb 14, 2014 | Never finaled issued Feb 2014, no final | 4426 24th St | revsion to app# 201212115971 to remodel existing bathroom at 3rd floor and master closet, no structural work.Details
revsion to app# 201212115971 to remodel existing bathroom at 3rd floor and master closet, no structural work. | $21,500 |
| Aug 8, 2013 | Completed final sign-off Apr 2014 | 132 Vicksburg St | remodel two bathrooms at 3rd floor - no strucutral work. new plumbing fixtures, cabinets, tile work, new hardwood flooring at 3rd floor. replace in kind bathrooms.Details
remodel two bathrooms at 3rd floor - no strucutral work. new plumbing fixtures, cabinets, tile work, new hardwood flooring at 3rd floor. replace in kind bathrooms. | $62,500 |
| Sep 24, 2012 | Completed final sign-off Dec 2013 | 1967 28th Av | remodel existing bathroom and dressing room with new window. no structural. remove exisitng brick fire place at master bedroom. new direct vent fireplace. new windows and sliding glass door at mater bedroom at same openingDetails
remodel existing bathroom and dressing room with new window. no structural. remove exisitng brick fire place at master bedroom. new direct vent fireplace. new windows and sliding glass door at mater bedroom at same opening | $31,500 |
| Jan 19, 2012 | Completed final sign-off Apr 2012 | 2594 Great Hy | remodel existing bathroom, no structural work, new plumbing fixtures. all (n) lighting must comply with cec 150(k)10.Details
remodel existing bathroom, no structural work, new plumbing fixtures. all (n) lighting must comply with cec 150(k)10. | $18,000 |
| Aug 31, 2011 | Completed final sign-off Nov 2011 | 1422 14th Av | bathroom upgrade, new tile, new fixtures. new lighting must comply with cec 150(k)10Details
bathroom upgrade, new tile, new fixtures. new lighting must comply with cec 150(k)10 | $9,000 |
| Aug 31, 2011 | Completed final sign-off Nov 2011 | 6 Godeus St | bathroom upgrade, retile shower stall, floor, new fixtures. all new lighting must comply with cec 150(k)10Details
bathroom upgrade, retile shower stall, floor, new fixtures. all new lighting must comply with cec 150(k)10 | $8,000 |
| Jun 7, 2010 | Completed final sign-off Jul 2010 | 677 Sanchez St | new powder room/half bathroom on 2nd floorDetails
new powder room/half bathroom on 2nd floor | $12,500 |
| Sep 23, 2008 | Completed final sign-off Apr 2009 | 1471 Mcallister St | remove kitchen cabinest and install new cabinets, plumbing fixtures, wood floring, storage area to be 2nd bath room, install lighting fixtures at kitchen & 2nd bath.Details
remove kitchen cabinest and install new cabinets, plumbing fixtures, wood floring, storage area to be 2nd bath room, install lighting fixtures at kitchen & 2nd bath. | $75,000 |
| Aug 31, 2007 | Completed final sign-off Dec 2007 | 381 Noe St | 1st floor-interior kitchen /bath remodel at rear of house, add bathtub,remove two walls, new fixtures,partition walls cabinetsDetails
1st floor-interior kitchen /bath remodel at rear of house, add bathtub,remove two walls, new fixtures,partition walls cabinets | $60,000 |