Back to kitchen remodel contractors
Maddocks Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2017 to Jan 2026
- Last 24 months
- 4 permits filed
14 permits since 2000: 12 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 0 days from filing to permit and 165 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 7, 2024 | Completed final sign-off Jun 2025 | 2307 Sacramento St | strip lath & plaster. redo electrical, new insulation, new sheetrock, new cabinets. paint & flooring, all work in kind, work in kitchen onlyDetails
strip lath & plaster. redo electrical, new insulation, new sheetrock, new cabinets. paint & flooring, all work in kind, work in kitchen only | $60,000 |
| Jan 20, 2021 | Completed final sign-off Mar 2021 | 2838 Taraval St | #3. new kitchen cabinets, new shower & enclosure with vanity and new tile in bathroom. remove and replace 3 windows in lightwell, 1 bathroom, 1 lv room, new flooring and paint. possible dryrot.Details
#3. new kitchen cabinets, new shower & enclosure with vanity and new tile in bathroom. remove and replace 3 windows in lightwell, 1 bathroom, 1 lv room, new flooring and paint. possible dryrot. | $20,000 |
| Aug 28, 2019 | Completed final sign-off Jan 2020 | 94 Sussex St | seal concrete foundation 8 pcs drywall, 5/8" type x, mud, paint redo kitchen floor with vinal. comply with complaint #201979253Details
seal concrete foundation 8 pcs drywall, 5/8" type x, mud, paint redo kitchen floor with vinal. comply with complaint #201979253 | $7,000 |
| Dec 5, 2017 | Completed final sign-off Jun 2018 | 1707 Hayes St | kitchen remodelDetails
kitchen remodel | $21,500 |