Block 1208, lot 001
461 Central Ave
- City’s use
- Multi-Family Residential
- Built
- 1908
- Stories
- 3
- Units
- 6
- Rooms
- 12 bedrooms, 12 bathrooms
- Building
- 6,750 sq ft
- Lot
- 2,325 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 20, 2025 | Completed final sign-off Feb 2026 | 461 Central Av | Roofworx Inc. | re-roofing with fire works.Details
re-roofing with fire works. | $29,718 |
| Oct 21, 2020 | Completed final sign-off Sep 2021 | 463 Central Av | M Bay Area Construction Inc | in kind bathroom remodel. in kind kitchen remodelDetails
in kind bathroom remodel. in kind kitchen remodel | $30,000 |
| Oct 16, 2020 | Completed final sign-off Oct 2020 | 463 Central Av | Window Station Inc | replace 11 marvin windows aluminum wood clad visible form st. 1 vinyl not visible from st.same size and locationDetails
replace 11 marvin windows aluminum wood clad visible form st. 1 vinyl not visible from st.same size and location | $24,000 |
| May 21, 2019 | Never finaled issued May 2019, no final | 1707 Hayes St | Sf Gonzalez Concrete Inc. | street spaceDetails
street space | |
| Nov 19, 2018 | Completed final sign-off Feb 2019 | 465 Central Av | Window Station Inc | replacement of six visible windows visible from the st. w/marvin alum-wood clad with ogee lugs smae size style & locationDetails
replacement of six visible windows visible from the st. w/marvin alum-wood clad with ogee lugs smae size style & location | $12,000 |
| Feb 22, 2018 | Never finaled issued Feb 2018, no final | 461 Central Av | street spaceDetails
street space | ||
| Jan 2, 2018 | Never finaled issued Jan 2018, no final | 461 Central Av | street spaceDetails
street space | ||
| Dec 11, 2017 | Completed final sign-off May 2018 | 1707 Hayes St | The Window Specialist (Tws Wholesale | rear facing window replacement, same size with ufactor equal to or less than .32. bedroom 2 wood d.h. kind & type. milgard essence series fg clad window with og clad lugs. 4 dh & 1 awning.Details
rear facing window replacement, same size with ufactor equal to or less than .32. bedroom 2 wood d.h. kind & type. milgard essence series fg clad window with og clad lugs. 4 dh & 1 awning. | $4,500 |
| Dec 5, 2017 | Completed final sign-off Jun 2018 | 1707 Hayes St | Maddocks Construction | kitchen remodelDetails
kitchen remodel | $21,500 |
| Dec 4, 2017 | Completed final sign-off May 2018 | 1707 Hayes St | The Window Specialist (Tws Wholesale | replace seven windows on third floor hayes street facade with double hung wood clad windows with ogee lugs in existing frame. same size same location. max u-factor 0.32Details
replace seven windows on third floor hayes street facade with double hung wood clad windows with ogee lugs in existing frame. same size same location. max u-factor 0.32 | $7,000 |
| Jul 6, 2017 | Completed final sign-off Jun 2018 | 461 Central Av | Seismic Retrofitters Inc. | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appnedix a4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appnedix a4 | $70,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.