Back to kitchen remodel contractors
M&T Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2014 to Sep 2026
- Last 24 months
- 2 permits filed
26 permits since 2000: 25 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 12 completed. Typically 0 days from filing to permit and 143 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 20, 2025 | Completed final sign-off Oct 2025 | 470 Hill St | 1) kitchen modeling. install plumbing electrical cabinets. countertop tile. 2) bathroom remodeling. install plumbing, electrical, vanity, tub, tile. 3) install sub panel; in kind. no removal of wallsDetails
1) kitchen modeling. install plumbing electrical cabinets. countertop tile. 2) bathroom remodeling. install plumbing, electrical, vanity, tub, tile. 3) install sub panel; in kind. no removal of walls | $31,800 |
| Sep 9, 2024 | Completed final sign-off May 2025 | 5239 California St | 1) kitchen - replace countertop, sink, hood. install flooring. install electrical. gas pipe. no cabinet replacement. 2) install electrical 50amp subpanel. upgrade electrical.Details
1) kitchen - replace countertop, sink, hood. install flooring. install electrical. gas pipe. no cabinet replacement. 2) install electrical 50amp subpanel. upgrade electrical. | $28,000 |
| Aug 7, 2024 | Completed final sign-off Jan 2025 | 566 21st Av | apt #1: (one)kitchen remodel, install cabinets, countertop, tile, hood, (one)bathroom remodel, install tub, vanity, tile, toilet, install 50 amp panel. upgrade electrical.Details
apt #1: (one)kitchen remodel, install cabinets, countertop, tile, hood, (one)bathroom remodel, install tub, vanity, tile, toilet, install 50 amp panel. upgrade electrical. | $36,000 |
| Aug 1, 2023 | Completed final sign-off Jul 2024 | 123 22nd Av | unit 123: remodel baths/kitchen, replace finishes/plubmingn fixtures, add new nonstructural wall @ bedrm #1 to create new dedroom #4; unit 125: remodel bathrooms, replace finishes/plumbing fixtures, skylights; update & replace (e) recessed light fixtures w/led; plumbing fixt in-kindDetails
unit 123: remodel baths/kitchen, replace finishes/plubmingn fixtures, add new nonstructural wall @ bedrm #1 to create new dedroom #4; unit 125: remodel bathrooms, replace finishes/plumbing fixtures, skylights; update & replace (e) recessed light fixtures w/led; plumbing fixt in-kind | $150,000 |
| Jul 3, 2023 | Completed final sign-off Sep 2023 | 1347 10th Av | kitchen remodel-install cabinet, countertops, flooring, plumbing and electrical. remodel in-kindDetails
kitchen remodel-install cabinet, countertops, flooring, plumbing and electrical. remodel in-kind | $15,000 |
| Aug 25, 2021 | Completed final sign-off Jan 2022 | 17 Sutro Heights Av | kitchen remodel install cabinet, floor tile, countertop, sink, hood, painting. h.e. lightingDetails
kitchen remodel install cabinet, floor tile, countertop, sink, hood, painting. h.e. lighting | $14,500 |
| May 24, 2019 | Completed final sign-off Oct 2021 | 647 35th Av | legalize 1st flr area as additional unit #3 per ord# 43-14, including kitchen, living, bathroom & 2 bedrooms. add water heater, furnace & washer/dryer.Details
legalize 1st flr area as additional unit #3 per ord# 43-14, including kitchen, living, bathroom & 2 bedrooms. add water heater, furnace & washer/dryer. | $50,000 |
| Nov 19, 2018 | Completed final sign-off Mar 2019 | 639 21st Av | kitchen remodel, install cabinets, tile, plumbing, electrical, insulation & vinyl wall.Details
kitchen remodel, install cabinets, tile, plumbing, electrical, insulation & vinyl wall. | $15,000 |
| Nov 10, 2017 | Completed final sign-off Apr 2018 | 15 Clayton St | kitchen remodel - floor, cabinets, sink, lights, countertop. no change to wall locations.Details
kitchen remodel - floor, cabinets, sink, lights, countertop. no change to wall locations. | $1,700 |
| Jan 4, 2016 | Completed final sign-off Aug 2016 | 566 21st Av | apt #2. kitchen remodel - floor tile, cabinets, sink, lights, counter top. no walls moved, removed, added or infilled. all existing layouts to remain. bathroom remodel - floor tile, sink, lights, shower. no walls moved, removed, or infilled. all existing layout to remain unchanged.Details
apt #2. kitchen remodel - floor tile, cabinets, sink, lights, counter top. no walls moved, removed, added or infilled. all existing layouts to remain. bathroom remodel - floor tile, sink, lights, shower. no walls moved, removed, or infilled. all existing layout to remain unchanged. | $25,000 |
| May 7, 2014 | Completed final sign-off Aug 2014 | 1366 47th Av | #a: kitchen & bathroom remodel, floor tiles, cabinets, sink, lights, countertop, toilet, bathtub, 3 interior doors in kind. whole unit- dry wall, painting, lights, outlets, no structural work, 3 windows in kind.Details
#a: kitchen & bathroom remodel, floor tiles, cabinets, sink, lights, countertop, toilet, bathtub, 3 interior doors in kind. whole unit- dry wall, painting, lights, outlets, no structural work, 3 windows in kind. | $60,000 |
| Jan 15, 2014 | Completed final sign-off May 2014 | 1894 11th Av | kitchen remodel - floor tiles, cabinets, sink, lights, countertop. ligting shall comply with t-24Details
kitchen remodel - floor tiles, cabinets, sink, lights, countertop. ligting shall comply with t-24 | $15,000 |