Back to bathroom remodel contractors
M&T Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2014 to Sep 2026
- Last 24 months
- 2 permits filed
26 permits since 2000: 25 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 10 completed, 1 in progress. Typically 0 days from filing to permit and 187 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 3, 2026 | In progress issued Sep 2026 | 378 Victoria St | bathroom remodel in kind. tub to shower conversion. replace (e) bathroom tile and vanity in kind. no curbless shower. no change to floor layout. no change to wall layout. no structural work.Details
bathroom remodel in kind. tub to shower conversion. replace (e) bathroom tile and vanity in kind. no curbless shower. no change to floor layout. no change to wall layout. no structural work. | $13,000 |
| May 20, 2025 | Completed final sign-off Oct 2025 | 470 Hill St | 1) kitchen modeling. install plumbing electrical cabinets. countertop tile. 2) bathroom remodeling. install plumbing, electrical, vanity, tub, tile. 3) install sub panel; in kind. no removal of wallsDetails
1) kitchen modeling. install plumbing electrical cabinets. countertop tile. 2) bathroom remodeling. install plumbing, electrical, vanity, tub, tile. 3) install sub panel; in kind. no removal of walls | $31,800 |
| Aug 7, 2024 | Completed final sign-off Jan 2025 | 566 21st Av | apt #1: (one)kitchen remodel, install cabinets, countertop, tile, hood, (one)bathroom remodel, install tub, vanity, tile, toilet, install 50 amp panel. upgrade electrical.Details
apt #1: (one)kitchen remodel, install cabinets, countertop, tile, hood, (one)bathroom remodel, install tub, vanity, tile, toilet, install 50 amp panel. upgrade electrical. | $36,000 |
| Aug 1, 2023 | Completed final sign-off Jul 2024 | 123 22nd Av | unit 123: remodel baths/kitchen, replace finishes/plubmingn fixtures, add new nonstructural wall @ bedrm #1 to create new dedroom #4; unit 125: remodel bathrooms, replace finishes/plumbing fixtures, skylights; update & replace (e) recessed light fixtures w/led; plumbing fixt in-kindDetails
unit 123: remodel baths/kitchen, replace finishes/plubmingn fixtures, add new nonstructural wall @ bedrm #1 to create new dedroom #4; unit 125: remodel bathrooms, replace finishes/plumbing fixtures, skylights; update & replace (e) recessed light fixtures w/led; plumbing fixt in-kind | $150,000 |
| May 24, 2019 | Completed final sign-off Oct 2021 | 647 35th Av | legalize 1st flr area as additional unit #3 per ord# 43-14, including kitchen, living, bathroom & 2 bedrooms. add water heater, furnace & washer/dryer.Details
legalize 1st flr area as additional unit #3 per ord# 43-14, including kitchen, living, bathroom & 2 bedrooms. add water heater, furnace & washer/dryer. | $50,000 |
| Jan 17, 2019 | Completed final sign-off Jun 2019 | 1723 08th Av | remodling of existing bathroom and upgrade electrical service to 200 amp. install 30 recessed lights, replace/install 35 electrical outlets, no wall moved, removed, added or infilled. all existing layouts to remain unchanged.Details
remodling of existing bathroom and upgrade electrical service to 200 amp. install 30 recessed lights, replace/install 35 electrical outlets, no wall moved, removed, added or infilled. all existing layouts to remain unchanged. | $22,000 |
| Mar 20, 2018 | Completed final sign-off Sep 2018 | 27 Digby St | revision to 201802201683 rearrange (e) bathroom and closet at 3rd floorDetails
revision to 201802201683 rearrange (e) bathroom and closet at 3rd floor | $5,000 |
| Feb 20, 2018 | Completed final sign-off Sep 2018 | 27 Digby St | three bathroom remodel - tile, vanity, light, toilet, fan. approx 40 sf each, no wall alteration or change for (e) layout.Details
three bathroom remodel - tile, vanity, light, toilet, fan. approx 40 sf each, no wall alteration or change for (e) layout. | $36,000 |
| Oct 27, 2016 | Completed final sign-off May 2017 | 675 22nd Av | bathroom remodel: floor tile, vanity, lights, toilet. no structural work.Details
bathroom remodel: floor tile, vanity, lights, toilet. no structural work. | $7,500 |
| Jan 4, 2016 | Completed final sign-off Aug 2016 | 566 21st Av | apt #2. kitchen remodel - floor tile, cabinets, sink, lights, counter top. no walls moved, removed, added or infilled. all existing layouts to remain. bathroom remodel - floor tile, sink, lights, shower. no walls moved, removed, or infilled. all existing layout to remain unchanged.Details
apt #2. kitchen remodel - floor tile, cabinets, sink, lights, counter top. no walls moved, removed, added or infilled. all existing layouts to remain. bathroom remodel - floor tile, sink, lights, shower. no walls moved, removed, or infilled. all existing layout to remain unchanged. | $25,000 |
| May 7, 2014 | Completed final sign-off Aug 2014 | 1366 47th Av | #a: kitchen & bathroom remodel, floor tiles, cabinets, sink, lights, countertop, toilet, bathtub, 3 interior doors in kind. whole unit- dry wall, painting, lights, outlets, no structural work, 3 windows in kind.Details
#a: kitchen & bathroom remodel, floor tiles, cabinets, sink, lights, countertop, toilet, bathtub, 3 interior doors in kind. whole unit- dry wall, painting, lights, outlets, no structural work, 3 windows in kind. | $60,000 |