Back to kitchen remodel contractors
M M I A Inc Dba Keith Fontana Constructi
- Based in
- San Rafael
- On San Francisco permits
- Jun 2001 to Sep 2024
- Last 24 months
- 0 permits filed
18 permits since 2000: 16 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 77 days from filing to permit and 490 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 11, 2019 | Completed final sign-off Jun 2020 | 715 Duboce Av | kitchen and powder room remodel. replacement in kind of (e) window and door at rear yard. non structural demo and framing.Details
kitchen and powder room remodel. replacement in kind of (e) window and door at rear yard. non structural demo and framing. | $50,000 |
| Feb 23, 2018 | Completed final sign-off Jul 2019 | 704 Wisconsin St | revision to pa #201502037358, which included (renovate e residence, add a floor & horiz addit @ rear. rebuild e front entry stair & bay. renovate e kitchen & bathrms. remeove & replace substandard 2nd floor framing @ kitchen area.) new scope to reframe substandard floor framing per inspector requestDetails
revision to pa #201502037358, which included (renovate e residence, add a floor & horiz addit @ rear. rebuild e front entry stair & bay. renovate e kitchen & bathrms. remeove & replace substandard 2nd floor framing @ kitchen area.) new scope to reframe substandard floor framing per inspector request | $12,000 |
| Jun 5, 2017 | Completed final sign-off May 2019 | 229 Oak St | remodel of (e) 2nd floor kitchen, bathrooms (2) & bedrooms (2). add 12 s.f. to master bath into portion of (e) west lightwell. replace windows @ 2nd floor of west lightwell.Details
remodel of (e) 2nd floor kitchen, bathrooms (2) & bedrooms (2). add 12 s.f. to master bath into portion of (e) west lightwell. replace windows @ 2nd floor of west lightwell. | $100,000 |
| Apr 30, 2015 | Completed final sign-off Jul 2015 | 996 Union St | kitchen renovation- replace cabinets, plumbing, fixtures, counters, flooring, appliances. remove 10' lf non structural interior wall. bathroom renovation - new shower, flooring, fixtures, doors, non structral wall frame & pocket door.Details
kitchen renovation- replace cabinets, plumbing, fixtures, counters, flooring, appliances. remove 10' lf non structural interior wall. bathroom renovation - new shower, flooring, fixtures, doors, non structral wall frame & pocket door. | $50,000 |
| Feb 3, 2015 | Completed final sign-off Jul 2019 | 704 Wisconsin St | renovate (e) residence, add a floor & horizontal addition @ rear. rebuild (e) front entry stair & bay, renovate existing kitchen and bathrooms.Details
renovate (e) residence, add a floor & horizontal addition @ rear. rebuild (e) front entry stair & bay, renovate existing kitchen and bathrooms. | $320,000 |