Back to bathroom remodel contractors
M M I A Inc Dba Keith Fontana Constructi
- Based in
- San Rafael
- On San Francisco permits
- Jun 2001 to Sep 2024
- Last 24 months
- 0 permits filed
18 permits since 2000: 16 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 7 completed. Typically 1 days from filing to permit and 518 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 27, 2022 | Completed final sign-off Nov 2023 | 1901 California St | 2 bathrooms remodel in kind, no walls to be removed.Details
2 bathrooms remodel in kind, no walls to be removed. | $13,725 |
| Jun 5, 2017 | Completed final sign-off May 2019 | 229 Oak St | remodel of (e) 2nd floor kitchen, bathrooms (2) & bedrooms (2). add 12 s.f. to master bath into portion of (e) west lightwell. replace windows @ 2nd floor of west lightwell.Details
remodel of (e) 2nd floor kitchen, bathrooms (2) & bedrooms (2). add 12 s.f. to master bath into portion of (e) west lightwell. replace windows @ 2nd floor of west lightwell. | $100,000 |
| Aug 31, 2015 | Completed final sign-off Sep 2017 | 229 Oak St | remodel lower level family room, bath, bedroom, office. replace windows & door on south facade @ 1/f & 2/f. replace siding on east facade, add new bay window in master bedroom, replace (e) roof, replace (e) heating system with (n) hydranic system. voluntary seismic upgrade to 1/fDetails
remodel lower level family room, bath, bedroom, office. replace windows & door on south facade @ 1/f & 2/f. replace siding on east facade, add new bay window in master bedroom, replace (e) roof, replace (e) heating system with (n) hydranic system. voluntary seismic upgrade to 1/f | $175,000 |
| Apr 30, 2015 | Completed final sign-off Jul 2015 | 996 Union St | kitchen renovation- replace cabinets, plumbing, fixtures, counters, flooring, appliances. remove 10' lf non structural interior wall. bathroom renovation - new shower, flooring, fixtures, doors, non structral wall frame & pocket door.Details
kitchen renovation- replace cabinets, plumbing, fixtures, counters, flooring, appliances. remove 10' lf non structural interior wall. bathroom renovation - new shower, flooring, fixtures, doors, non structral wall frame & pocket door. | $50,000 |
| Feb 3, 2015 | Completed final sign-off Jul 2019 | 704 Wisconsin St | renovate (e) residence, add a floor & horizontal addition @ rear. rebuild (e) front entry stair & bay, renovate existing kitchen and bathrooms.Details
renovate (e) residence, add a floor & horizontal addition @ rear. rebuild (e) front entry stair & bay, renovate existing kitchen and bathrooms. | $320,000 |
| Dec 17, 2010 | Completed final sign-off Mar 2011 | 4732 17th St | remodel (e) bathroom, change configuration from seperate shower too a tub slower combo. new double vanity, cabinets, electrical & plumbing. non structuralDetails
remodel (e) bathroom, change configuration from seperate shower too a tub slower combo. new double vanity, cabinets, electrical & plumbing. non structural | $10,000 |
| Jun 1, 2001 | Completed final sign-off Aug 2001 | 2559 Green St | master bath remodel,remove all finishes & replace remove & replace existing fixtures no exterior altDetails
master bath remodel,remove all finishes & replace remove & replace existing fixtures no exterior alt | $30,000 |