M A Gunst Design Build Llc Dba Betelgeu
- Based in
- Emeryville
- On San Francisco permits
- Jan 2025 to Jul 2025
- Last 24 months
- 6 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 10 days from filing to permit and 366 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 25, 2025 | Completed final sign-off Mar 2026 | 140 Cole St | revision to pa# 202501238873: remove and replace one window in kitchen. install new tankless gas dhw at roof. remove (e) gas tank dhw.Details
revision to pa# 202501238873: remove and replace one window in kitchen. install new tankless gas dhw at roof. remove (e) gas tank dhw. | $10,000 |
| Jan 23, 2025 | Completed final sign-off Mar 2026 | 140 Cole St | remdel (e) kitchen, remodel (e) bathroom, new half bathroom, new heat pump heating/cooling system, replace all (e) electrical wiring, new attic insulation (r-30). windows on different pa#202502110121Details
remdel (e) kitchen, remodel (e) bathroom, new half bathroom, new heat pump heating/cooling system, replace all (e) electrical wiring, new attic insulation (r-30). windows on different pa#202502110121 | $250,000 |