Back to bathroom remodel contractors
M A Gunst Design Build Llc Dba Betelgeu
- Based in
- Emeryville
- On San Francisco permits
- Jan 2025 to Jul 2025
- Last 24 months
- 6 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 166 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 11, 2025 | Completed final sign-off Dec 2025 | 1260 Mason St | unit b 2nd floor: bathroom remodel. no structual changes like for like 33 sq ft shower.Details
unit b 2nd floor: bathroom remodel. no structual changes like for like 33 sq ft shower. | $15,000 |
| Jun 17, 2025 | Completed final sign-off Aug 2025 | 1668 Grove St | remodel 1 existing bathroom.Details
remodel 1 existing bathroom. | $40,000 |
| Jan 23, 2025 | Completed final sign-off Mar 2026 | 140 Cole St | remdel (e) kitchen, remodel (e) bathroom, new half bathroom, new heat pump heating/cooling system, replace all (e) electrical wiring, new attic insulation (r-30). windows on different pa#202502110121Details
remdel (e) kitchen, remodel (e) bathroom, new half bathroom, new heat pump heating/cooling system, replace all (e) electrical wiring, new attic insulation (r-30). windows on different pa#202502110121 | $250,000 |