Lynch Construction Inc
- Based in
- South San Francisco
- On San Francisco permits
- May 2011 to Jul 2026
- Last 24 months
- 3 permits filed
31 permits since 2000: 26 completed, 1 in progress, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 4 completed. Typically 24 days from filing to permit and 213 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 9, 2023 | Completed final sign-off Apr 2023 | 340 Urbano Dr | replace extg brick front stairs and 5 steps in kind. extg handrails to remainDetails
replace extg brick front stairs and 5 steps in kind. extg handrails to remain | $20,000 |
| Mar 31, 2021 | Completed final sign-off Jun 2022 | 119 Skyview Wy | g/f: reduce (e) garage into 1 car space, create new master bedrm suite w/ master bathrm and w.i.c. convert (e) bedrm 1 into a new family rm. remodel (e) bathroom, convert (e) front office/den into bedrm 1. replace (e) and build new interior stairs to 2nd flr.Details
g/f: reduce (e) garage into 1 car space, create new master bedrm suite w/ master bathrm and w.i.c. convert (e) bedrm 1 into a new family rm. remodel (e) bathroom, convert (e) front office/den into bedrm 1. replace (e) and build new interior stairs to 2nd flr. | $180,000 |
| Sep 9, 2019 | Completed final sign-off Aug 2020 | 1050 Monterey Bl | replace existing main exterior stairs in kind due to significant deterioration. widen e garage door to 9ftDetails
replace existing main exterior stairs in kind due to significant deterioration. widen e garage door to 9ft | $35,000 |
| Mar 22, 2017 | Completed final sign-off Jul 2017 | 835 Foerster St | enlarge and remodel (e) 3rd floor bathroom and bedroom and bedroom closet; construct new guardrail at interior stairs to 3rd floor; replace window at rear-facing stairway. no new work visible from streetDetails
enlarge and remodel (e) 3rd floor bathroom and bedroom and bedroom closet; construct new guardrail at interior stairs to 3rd floor; replace window at rear-facing stairway. no new work visible from street | $25,000 |