Back to bathroom remodel contractors
Lynch Construction Inc
- Based in
- South San Francisco
- On San Francisco permits
- May 2011 to Jul 2026
- Last 24 months
- 3 permits filed
31 permits since 2000: 26 completed, 1 in progress, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 12 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 4 days from filing to permit and 150 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 13, 2026 | In progress issued Jul 2026 | 2454 24th Av | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $10,561 |
| Mar 10, 2026 | Completed final sign-off May 2026 | 635 Victoria St | remodel bathroom in kind, new tile, plumbing, electrical fixtures, repair of dry rot around windows of bathroomDetails
remodel bathroom in kind, new tile, plumbing, electrical fixtures, repair of dry rot around windows of bathroom | $20,000 |
| Apr 6, 2022 | Completed final sign-off Oct 2022 | 1200 33rd Av | remodel existing kitchen and bathroom. add one full bathroom on 3/f.Details
remodel existing kitchen and bathroom. add one full bathroom on 3/f. | $45,000 |
| Mar 4, 2022 | Completed final sign-off May 2022 | 2519 Pacheco St | remodel and englarge the (e) master bathroom. replace all fixtures and floor & wall finishes. add new door to 2nd bedroom; add new light switch. no work on g/f.Details
remodel and englarge the (e) master bathroom. replace all fixtures and floor & wall finishes. add new door to 2nd bedroom; add new light switch. no work on g/f. | $18,000 |
| Apr 21, 2021 | Completed final sign-off Jan 2022 | 191 Judson Av | remodel extg kitchen and bathroom. remove load bearing wall. replace extg chimney with gas fireplace.Details
remodel extg kitchen and bathroom. remove load bearing wall. replace extg chimney with gas fireplace. | $40,000 |
| Mar 31, 2021 | Completed final sign-off Jun 2022 | 119 Skyview Wy | g/f: reduce (e) garage into 1 car space, create new master bedrm suite w/ master bathrm and w.i.c. convert (e) bedrm 1 into a new family rm. remodel (e) bathroom, convert (e) front office/den into bedrm 1. replace (e) and build new interior stairs to 2nd flr.Details
g/f: reduce (e) garage into 1 car space, create new master bedrm suite w/ master bathrm and w.i.c. convert (e) bedrm 1 into a new family rm. remodel (e) bathroom, convert (e) front office/den into bedrm 1. replace (e) and build new interior stairs to 2nd flr. | $180,000 |
| Mar 15, 2021 | Expired or cancelled expired Jan 2025 | 84 Hernandez Av | new rear deck off of 1st fl. repair/replace (e) clay tile roofing & flat roof. (n) skylight; 1st fl (n) windows on south wall. remodel (e) bath. remodel (e) laundry room into a steam room; 2nd fl replace (e) door at rear with (n) french door. replace 2 rear windows; 3rd fl (n) laundry closet.Details
new rear deck off of 1st fl. repair/replace (e) clay tile roofing & flat roof. (n) skylight; 1st fl (n) windows on south wall. remodel (e) bath. remodel (e) laundry room into a steam room; 2nd fl replace (e) door at rear with (n) french door. replace 2 rear windows; 3rd fl (n) laundry closet. | $45,000 |
| Jan 22, 2021 | Completed final sign-off Apr 2022 | 712 Wisconsin St | the proposed remodel is an interior remodel, with no changes to exterior walls or windows. remodel work will include the following - kitchen remodel, with new simpson strongwall shear element; addition of powder room, bathroom & laundry room remodelDetails
the proposed remodel is an interior remodel, with no changes to exterior walls or windows. remodel work will include the following - kitchen remodel, with new simpson strongwall shear element; addition of powder room, bathroom & laundry room remodel | $60,000 |
| Jan 8, 2020 | Completed final sign-off May 2023 | 996 Burnett Av | add new full bathroom at the upper unit, replace (e) furnace with centralized heating at lower unit, add new exterior door, add hot tub and bbq at back yard.add new rear yard access door and redo front yard per 201802201717 r4Details
add new full bathroom at the upper unit, replace (e) furnace with centralized heating at lower unit, add new exterior door, add hot tub and bbq at back yard.add new rear yard access door and redo front yard per 201802201717 r4 | $30,000 |
| Mar 22, 2017 | Completed final sign-off Jul 2017 | 835 Foerster St | enlarge and remodel (e) 3rd floor bathroom and bedroom and bedroom closet; construct new guardrail at interior stairs to 3rd floor; replace window at rear-facing stairway. no new work visible from streetDetails
enlarge and remodel (e) 3rd floor bathroom and bedroom and bedroom closet; construct new guardrail at interior stairs to 3rd floor; replace window at rear-facing stairway. no new work visible from street | $25,000 |
| Jul 6, 2016 | Completed final sign-off Oct 2016 | 1241 Stanyan St | remodel two (e) bathrooms, replace (e) gas gravity furnace with new forced air furnace. reuse (e) furnace flue termination at roof to be no less than 4' from prop. line. all bathroom lighting to be high-efficacy, vent fan terminations to be not less than 3' from prop. line.Details
remodel two (e) bathrooms, replace (e) gas gravity furnace with new forced air furnace. reuse (e) furnace flue termination at roof to be no less than 4' from prop. line. all bathroom lighting to be high-efficacy, vent fan terminations to be not less than 3' from prop. line. | $25,000 |
| Aug 31, 2015 | Completed final sign-off Dec 2015 | 901 Castro St | change of occupancy from m occupancy to b ocupancy. remodel of existing commercial space to incorporate 5 rooms. no work to existing bathroom or kitchen area. electrical work: adding receptacles, lighting, new doors, trim, baseboards.Details
change of occupancy from m occupancy to b ocupancy. remodel of existing commercial space to incorporate 5 rooms. no work to existing bathroom or kitchen area. electrical work: adding receptacles, lighting, new doors, trim, baseboards. | $21,000 |
| Aug 15, 2014 | Completed final sign-off Mar 2015 | 1638 08th Av | interior remodel on 1st floor @ family room, study and bathroomDetails
interior remodel on 1st floor @ family room, study and bathroom | $15,000 |
| Feb 12, 2013 | Completed final sign-off May 2013 | 1638 08th Av | to comply w/complaint #200452811 dated 8/18/04. remove existing ktichen cabinets, replace with new, new counters, addition of two pendent lights. remove non load bearing wall, add header. remove tub in hall bath, replace with tiled shower. remove 3 windows, replace with new in same openings.Details
to comply w/complaint #200452811 dated 8/18/04. remove existing ktichen cabinets, replace with new, new counters, addition of two pendent lights. remove non load bearing wall, add header. remove tub in hall bath, replace with tiled shower. remove 3 windows, replace with new in same openings. | $45,000 |
| May 16, 2011 | Never finaled issued May 2011, no final | 87 Homestead St | replace two vanities, replace 2 vanity tops, replace 250 sq. ft. of tile. (tub surround and floor). change tub & shower at 2 bathrooms. lighting to comply with cec 150 (k).Details
replace two vanities, replace 2 vanity tops, replace 250 sq. ft. of tile. (tub surround and floor). change tub & shower at 2 bathrooms. lighting to comply with cec 150 (k). | $6,000 |