Back to kitchen remodel contractors
Luke Gilligan Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Apr 2025
- Last 24 months
- 3 permits filed
82 permits since 2000: 63 completed, 2 in progress, 14 never finaled, 3 expired or cancelled.
Of the 14 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
26 kitchen remodel permits: 20 completed, 6 never finaled. Typically 2 days from filing to permit and 334 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 27, 2024 | Completed final sign-off Jun 2026 | 1250 Chestnut St | ground floor: add a proposed 1-bed replacement dwelling unit. 2nd flr: merge and remodel 2 existing 1-bed dwelling units into one proposed 3-bedroom dwelling unit. 3rd floor: remodel the existing 3rd fl. unit kitchen and bath; add one full bath. uprade/replace -in - kind exiting windows throughoutDetails
ground floor: add a proposed 1-bed replacement dwelling unit. 2nd flr: merge and remodel 2 existing 1-bed dwelling units into one proposed 3-bedroom dwelling unit. 3rd floor: remodel the existing 3rd fl. unit kitchen and bath; add one full bath. uprade/replace -in - kind exiting windows throughout | $628,776 |
| Jul 11, 2024 | Completed final sign-off Jan 2025 | 543 Marina Bl | kitchen upgrade - new cabinets, new countertops, same location. for hood and stove. new plumbing fixtures. remodel (e) bathroom: tile and vanity upgrade. new plumbing fixtures.Details
kitchen upgrade - new cabinets, new countertops, same location. for hood and stove. new plumbing fixtures. remodel (e) bathroom: tile and vanity upgrade. new plumbing fixtures. | $55,000 |
| Jul 7, 2023 | Never finaled issued Jul 2023, no final | 1241 04th Av | retile bathroom wall and floor repaint: tile kitchen floor- replace countertops all electrical and plumbing remains in same locationsDetails
retile bathroom wall and floor repaint: tile kitchen floor- replace countertops all electrical and plumbing remains in same locations | $8,500 |
| Jun 1, 2021 | Completed final sign-off Feb 2023 | 2101 Vallejo St | remodel 2 kitchens and 3 bathrooms. repair dry rot. repair walls and floors at these rooms. no change to layout or walls and openings.Details
remodel 2 kitchens and 3 bathrooms. repair dry rot. repair walls and floors at these rooms. no change to layout or walls and openings. | $20,000 |
| Oct 9, 2019 | Never finaled issued Oct 2019, no final | 4203 23rd St | remodel of existing (1) kitchen & 1 (e) bathroom, in-kind. new lighting ledDetails
remodel of existing (1) kitchen & 1 (e) bathroom, in-kind. new lighting led | $25,000 |
| Jun 7, 2019 | Never finaled issued Jun 2019, no final | 111 Hoffman Av | remodel kitchen and (3) bathroomsDetails
remodel kitchen and (3) bathrooms | $105,000 |
| Jan 9, 2019 | Never finaled issued Oct 2019, no final | 1819 Baker St | rear addition & 3rd flr addition to (e) residence. create (n) living bedroom & bathroom spaces on 1st flr. reconfigure kitchen, dining, bathroom & bedroom spaces on 2nd flr. (n) 3 bedrooms, 2 bath & laudry on 3rd flr. (n) internal staircase. renovate facade. (n) deck access stair to rear yardDetails
rear addition & 3rd flr addition to (e) residence. create (n) living bedroom & bathroom spaces on 1st flr. reconfigure kitchen, dining, bathroom & bedroom spaces on 2nd flr. (n) 3 bedrooms, 2 bath & laudry on 3rd flr. (n) internal staircase. renovate facade. (n) deck access stair to rear yard | $340,000 |
| Jan 29, 2018 | Completed final sign-off Oct 2019 | 123 Ashbury St | ordinance #162-16. conversion of a portion of an (e) attached garage into an adu which includes a new kitchen, bathroom, doors, finishes & fixtures throughout. mep to be under seperate permit as required.Details
ordinance #162-16. conversion of a portion of an (e) attached garage into an adu which includes a new kitchen, bathroom, doors, finishes & fixtures throughout. mep to be under seperate permit as required. | $75,000 |
| Dec 5, 2017 | Completed final sign-off Oct 2019 | 125 Ashbury St | remodel 2 kitchen, 4 bathrooms, upgrade electrical, plumbing, heating, comply with nov. #201602822 - #1, #2, #3, #4, #5. comply with nov #201603091 item #1 & #2, comply with nov. #201603111 item #1 thru 14. repair back stairs 50%, repair dry & siding, repair and replace windows on the rear of buildiDetails
remodel 2 kitchen, 4 bathrooms, upgrade electrical, plumbing, heating, comply with nov. #201602822 - #1, #2, #3, #4, #5. comply with nov #201603091 item #1 & #2, comply with nov. #201603111 item #1 thru 14. repair back stairs 50%, repair dry & siding, repair and replace windows on the rear of buildi | $41,250 |
| Sep 18, 2017 | Completed final sign-off Feb 2018 | 75 San Lorenzo Wy | replace (e) windows and doors at rear of bldg. revision to permit # 201706058378. remodel utility room, insulate utility room and kitchen area. repair existing skylights, install beams over (e) doors. marvin doors and custom wood windows installedDetails
replace (e) windows and doors at rear of bldg. revision to permit # 201706058378. remodel utility room, insulate utility room and kitchen area. repair existing skylights, install beams over (e) doors. marvin doors and custom wood windows installed | $18,000 |
| Jun 5, 2017 | Completed final sign-off Feb 2018 | 75 San Lorenzo Wy | remodel kitchen plus 3 bathrooms. no structural work. upgrade plumbing & electrical in remodel area. painting, p0lus some hardwood floor repair. all work is interior of building.Details
remodel kitchen plus 3 bathrooms. no structural work. upgrade plumbing & electrical in remodel area. painting, p0lus some hardwood floor repair. all work is interior of building. | $50,000 |
| Apr 1, 2016 | Never finaled issued Apr 2016, no final | 1607 Dolores St | repair approx 200 sq ft on rear of property. remodel kitchen & 2 bathrooms cabinets plus tile. new flooring, painting. no change in wall & opening layout. min 50% kitchen light wattage high efficacy, high efficacy bathroom lighting or controlled by manual on sensor with high efficacy main light.Details
repair approx 200 sq ft on rear of property. remodel kitchen & 2 bathrooms cabinets plus tile. new flooring, painting. no change in wall & opening layout. min 50% kitchen light wattage high efficacy, high efficacy bathroom lighting or controlled by manual on sensor with high efficacy main light. | $25,000 |
| Mar 30, 2016 | Completed final sign-off May 2017 | 2455 Vallejo St | 1st floor - relocate stairs to 2nd flr, relocate bathroom; 2nd floor - remodel kitchen & dining areas; 3rd floor - add bathroom & laundry room, remodel master suite, install (3) skylights; 4th floor - add door @ top of stairs, change window & doors to sliding door @ 2nd floor.Details
1st floor - relocate stairs to 2nd flr, relocate bathroom; 2nd floor - remodel kitchen & dining areas; 3rd floor - add bathroom & laundry room, remodel master suite, install (3) skylights; 4th floor - add door @ top of stairs, change window & doors to sliding door @ 2nd floor. | $145,000 |
| Feb 9, 2016 | Completed final sign-off Jan 2019 | 1424 Sanchez St | (n) horizontal add on the 1st flr to include (n) study & laundry rm with renovation of bathroom. 2nd flr renovation of living room, kitchen & horizontal add for family room. (n) vertical & horizontal add to the 3rd flr for (n) bathroom & bedroom with renovation to existing bathroom & bedroomDetails
(n) horizontal add on the 1st flr to include (n) study & laundry rm with renovation of bathroom. 2nd flr renovation of living room, kitchen & horizontal add for family room. (n) vertical & horizontal add to the 3rd flr for (n) bathroom & bedroom with renovation to existing bathroom & bedroom | $700,000 |
| Sep 8, 2015 | Never finaled issued Sep 2015, no final | 1605 Dolores St | remodel 2 kitchens and 4 bathrooms upgrade electrical & plumbing. new painting, new flooring, new tile work. repair dry rotDetails
remodel 2 kitchens and 4 bathrooms upgrade electrical & plumbing. new painting, new flooring, new tile work. repair dry rot | $30,000 |
| Jun 6, 2014 | Completed final sign-off Jun 2015 | 471 Hoffman Av | minor changes to 201304053894. interior remodel of existing single family dwelling. minorchange to rear yard layout, lwr fl revision to home office. 2nd fl kitchen removal of non load bearing interior walls, 4th fl removal of entertainment rm closet/addition of window over main stair, roof planDetails
minor changes to 201304053894. interior remodel of existing single family dwelling. minorchange to rear yard layout, lwr fl revision to home office. 2nd fl kitchen removal of non load bearing interior walls, 4th fl removal of entertainment rm closet/addition of window over main stair, roof plan | |
| May 13, 2014 | Completed final sign-off Sep 2014 | 2316 Leavenworth St | steel beam and post at kitchen remodel. ref app#201404072582Details
steel beam and post at kitchen remodel. ref app#201404072582 | $7,500 |
| Apr 7, 2014 | Completed final sign-off Sep 2014 | 2316 Leavenworth St | remodel of kitchen, 2nd bathroom at bedroom level, refinish floors upgrade, electrical & plumbing, painting, new trim, room size 15' x 15' bathroom 5 x 12.Details
remodel of kitchen, 2nd bathroom at bedroom level, refinish floors upgrade, electrical & plumbing, painting, new trim, room size 15' x 15' bathroom 5 x 12. | $30,000 |
| Mar 13, 2014 | Completed final sign-off Mar 2015 | 577 Alvarado St | interior remodel. kitchen & 4 bathrooms. upgrade plumbing & electrical, install rear windows and skylights. new interior doors, insulation, sheetrock, upgrade bedrooms, tile, new floors, dryrot repair on rear wall.Details
interior remodel. kitchen & 4 bathrooms. upgrade plumbing & electrical, install rear windows and skylights. new interior doors, insulation, sheetrock, upgrade bedrooms, tile, new floors, dryrot repair on rear wall. | $125,000 |
| Feb 11, 2014 | Completed final sign-off Jul 2017 | 175 Downey St | rear addition for new bedrooms family room, kitchen and master bedroom suite. interior remodel with new elevator.Details
rear addition for new bedrooms family room, kitchen and master bedroom suite. interior remodel with new elevator. | $430,000 |
| Nov 19, 2013 | Completed final sign-off Mar 2014 | 1108 Dolores St | remodel kitchen and bathroom - electrical upgrade in kitchen and bathroom also plumbing upgrade. lighting to comply with cec 150 (k)Details
remodel kitchen and bathroom - electrical upgrade in kitchen and bathroom also plumbing upgrade. lighting to comply with cec 150 (k) | $26,500 |
| Apr 5, 2013 | Completed final sign-off Jun 2015 | 471 Hoffman Av | improve (e) lower level, addition to rear of house, add (n) upper story with 15 foot setback from front property line. rear addition on lower 2 levels includes a 12 foot pop out into yard. remodel kitchen, add 2 1/2 bathrooms.Details
improve (e) lower level, addition to rear of house, add (n) upper story with 15 foot setback from front property line. rear addition on lower 2 levels includes a 12 foot pop out into yard. remodel kitchen, add 2 1/2 bathrooms. | $321,000 |
| Dec 22, 2009 | Completed final sign-off Sep 2010 | 689 Douglass St | remove (e) beam & post, replace with flush beam, remodel kitchen into kitchen & dining room. plumbing, lighting for kitchen & dining roomDetails
remove (e) beam & post, replace with flush beam, remodel kitchen into kitchen & dining room. plumbing, lighting for kitchen & dining room | $15,000 |
| Jun 26, 2008 | Completed final sign-off Mar 2013 | 1730 Sanchez St | raise roof at (e) attic, add dormers. rear yard addition. modify facade. new kitchen, 1/2 bath and family at 2nd level. new habitable space at garage level. new bathrooms at attic level. seismic upgrade, rear roof deckDetails
raise roof at (e) attic, add dormers. rear yard addition. modify facade. new kitchen, 1/2 bath and family at 2nd level. new habitable space at garage level. new bathrooms at attic level. seismic upgrade, rear roof deck | $270,000 |
| Oct 5, 2005 | Completed final sign-off Apr 2006 | 274 Andover St | install new kitchen cabinets, lighting.Details
install new kitchen cabinets, lighting. | $8,000 |
| Feb 24, 2005 | Completed final sign-off Mar 2006 | 21 Homestead St | kitchens and bathrm remodel new finished attic new parking lift facade remodel (n) dormers clad woodDetails
kitchens and bathrm remodel new finished attic new parking lift facade remodel (n) dormers clad wood | $150,000 |