Lt Construction Inc
- Based in
- Daly City
- On San Francisco permits
- Apr 2012 to Jul 2026
- Last 24 months
- 1 permit filed
69 permits since 2000: 58 completed, 2 in progress, 8 never finaled, 1 expired or cancelled.
Of the 8 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
6 stairs permits: 5 completed, 1 never finaled. Typically 2 days from filing to permit and 100 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 26, 2024 | Completed final sign-off Sep 2024 | 1507 31st Av | rebuild existing entrance stairs in kind to match with existing.Details
rebuild existing entrance stairs in kind to match with existing. | $18,000 |
| Jan 27, 2023 | Completed final sign-off May 2023 | 1427 Taraval St | rebuild in-kind existing damaged 2nd exit stairs in lightwell area. relocate furnaces and water heaters in garage area.Details
rebuild in-kind existing damaged 2nd exit stairs in lightwell area. relocate furnaces and water heaters in garage area. | $25,000 |
| Feb 28, 2020 | Never finaled issued Mar 2020, no final | 2530 40th Av | propose a deck and stair at rear yardDetails
propose a deck and stair at rear yard | $8,000 |
| Oct 10, 2018 | Completed final sign-off Jul 2020 | 1650 25th Av | remodel 2 full bath relocate interior stair, install a new skylight on the 2nd flr. add a family room 2 bedrooms and a full bathroom on the 1st flrDetails
remodel 2 full bath relocate interior stair, install a new skylight on the 2nd flr. add a family room 2 bedrooms and a full bathroom on the 1st flr | $120,000 |
| Jan 9, 2017 | Completed final sign-off Jan 2017 | 1478 California St | to comply with the complaint # 201650851. repair the rear exit stairs, and repair deteriorated drainage pipe at exterior. repair to be less than 50%.Details
to comply with the complaint # 201650851. repair the rear exit stairs, and repair deteriorated drainage pipe at exterior. repair to be less than 50%. | $4,000 |
| Jan 19, 2016 | Completed final sign-off Jun 2016 | 1442 46th Av | inkind repair of several fropnt terrazo stair treads (leaks) and adjacent stucco; maintain existing stair treads and match existing stucco finishDetails
inkind repair of several fropnt terrazo stair treads (leaks) and adjacent stucco; maintain existing stair treads and match existing stucco finish | $4,000 |