Back to bathroom remodel contractors
Lt Construction Inc
- Based in
- Daly City
- On San Francisco permits
- Apr 2012 to Jul 2026
- Last 24 months
- 1 permit filed
69 permits since 2000: 58 completed, 2 in progress, 8 never finaled, 1 expired or cancelled.
Of the 8 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
32 bathroom remodel permits: 30 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 162 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 14, 2024 | Completed final sign-off Jan 2025 | 1442 46th Av | downstairs bathroom remodel. replace tub to shower pan, replace tiles and faucet.Details
downstairs bathroom remodel. replace tub to shower pan, replace tiles and faucet. | $9,000 |
| Nov 27, 2023 | In progress issued Nov 2023 | 470 Chenery St | remodel bathroom in kind. replace tub, sink, faucet, toilet, tileDetails
remodel bathroom in kind. replace tub, sink, faucet, toilet, tile | $13,000 |
| Mar 10, 2023 | Completed final sign-off Jan 2024 | 1634 Grant Av | remodeling bath & kitchen, replace sink, tub, faucet, cabinets & toiletDetails
remodeling bath & kitchen, replace sink, tub, faucet, cabinets & toilet | $40,000 |
| Aug 4, 2022 | Completed final sign-off Jul 2023 | 44 Rice St | remodeling upstairs bathroom and upgrade electric. replace (5) front windows. (casement wood window)Details
remodeling upstairs bathroom and upgrade electric. replace (5) front windows. (casement wood window) | $25,000 |
| Oct 12, 2021 | Never finaled issued Oct 2021, no final | 2770 19th Av | apt #31: remodeling one hollway, bathroom, replace tub, tile, sink faucet, and toilet. non structural.Details
apt #31: remodeling one hollway, bathroom, replace tub, tile, sink faucet, and toilet. non structural. | $13,000 |
| Oct 9, 2020 | Completed final sign-off Jul 2022 | 1911 30th Av | interior remodel of kitchen & bath, (n) paint, electrical, lighting. replace appliances & plumbing in kind. replace cabinets, counters, tile & floor. (n) heated floor in bathroom, replace (e) bathroom window in kind. no change to (e) layout, building footprint, or garage.Details
interior remodel of kitchen & bath, (n) paint, electrical, lighting. replace appliances & plumbing in kind. replace cabinets, counters, tile & floor. (n) heated floor in bathroom, replace (e) bathroom window in kind. no change to (e) layout, building footprint, or garage. | $50,000 |
| Nov 8, 2019 | Completed final sign-off Feb 2020 | 1318 15th Av | one bath and one kitchen remodel. replace cabinets, sink, faucet, toilet.Details
one bath and one kitchen remodel. replace cabinets, sink, faucet, toilet. | $25,000 |
| Jun 18, 2019 | Completed final sign-off Sep 2019 | 470 Chenery St | 2nd flr - add (n) bathroomDetails
2nd flr - add (n) bathroom | $12,000 |
| Jun 18, 2019 | Completed final sign-off Feb 2020 | 2183 39th Av | construct new bedroom, new bathroom, new family room on 1st floor.Details
construct new bedroom, new bathroom, new family room on 1st floor. | $60,000 |
| Feb 4, 2019 | Completed final sign-off Jan 2020 | 2530 40th Av | remodeling kitchen, bathroom, add new bathroom, upgrade new wire, replace window on 2/f. add new 2 bedroom, family room on 1/f. replace front left window need to casement wood window. right window picture window to wood casement & no horizontal.Details
remodeling kitchen, bathroom, add new bathroom, upgrade new wire, replace window on 2/f. add new 2 bedroom, family room on 1/f. replace front left window need to casement wood window. right window picture window to wood casement & no horizontal. | $80,000 |
| Oct 10, 2018 | Completed final sign-off Jul 2020 | 1650 25th Av | remodel 2 full bath relocate interior stair, install a new skylight on the 2nd flr. add a family room 2 bedrooms and a full bathroom on the 1st flrDetails
remodel 2 full bath relocate interior stair, install a new skylight on the 2nd flr. add a family room 2 bedrooms and a full bathroom on the 1st flr | $120,000 |
| Oct 2, 2018 | Completed final sign-off Jan 2019 | 430 Gennessee St | remodeling (1) upstair bathroom replace tub. sink and tile. (no toilet)Details
remodeling (1) upstair bathroom replace tub. sink and tile. (no toilet) | $7,000 |
| May 4, 2018 | Completed final sign-off Dec 2018 | 650 Junipero Serra Bl | residential interior renovation of e kitchen. e master bath and e laundry room. no addition or exterior changesDetails
residential interior renovation of e kitchen. e master bath and e laundry room. no addition or exterior changes | $30,000 |
| Dec 19, 2016 | Completed final sign-off Oct 2019 | 226 Brazil Av | add new unit on 1st floor. new kitchen, 2 bathrooms and 2 bedroomsDetails
add new unit on 1st floor. new kitchen, 2 bathrooms and 2 bedrooms | $40,000 |
| Dec 5, 2016 | Completed final sign-off Jun 2017 | 1539 Mason St | kitchen and bath remodel with similar fixtures. replace lights with high efficiency lights(flourescent or led). no removal of bearing wall.Details
kitchen and bath remodel with similar fixtures. replace lights with high efficiency lights(flourescent or led). no removal of bearing wall. | $10,000 |
| Jul 5, 2016 | Completed final sign-off Dec 2016 | 67 Maddux Av | add 2 bedrooms, bathroom, living room in basementDetails
add 2 bedrooms, bathroom, living room in basement | $2,500 |
| Jun 9, 2016 | Completed final sign-off Sep 2016 | 464 Chenery St | remodeling bathroom in-kind. replace sink,f aucet, tub,toilet.Details
remodeling bathroom in-kind. replace sink,f aucet, tub,toilet. | $10,000 |
| Feb 18, 2016 | Completed final sign-off Jun 2016 | 1863 Church St | remodel master bath & hallway bath. no structural work. replace in-kind.Details
remodel master bath & hallway bath. no structural work. replace in-kind. | $25,000 |
| Feb 4, 2016 | Completed final sign-off May 2016 | 355 24th Av | apt 203 & 205: each unit: kitchen remodel: replace sink, cabinets, hood. bathroom remodeling: replace tiolet, tub, sink. like for like. no changes to wall locations or fixtures locations. led lights, replace bathroom exhause fan.Details
apt 203 & 205: each unit: kitchen remodel: replace sink, cabinets, hood. bathroom remodeling: replace tiolet, tub, sink. like for like. no changes to wall locations or fixtures locations. led lights, replace bathroom exhause fan. | $24,000 |
| Oct 13, 2015 | Completed final sign-off Feb 2016 | 601 Van Ness Av | remodel kitchen & bathroom. n/a for maher.Details
remodel kitchen & bathroom. n/a for maher. | $23,000 |
| Aug 3, 2015 | Completed final sign-off Aug 2015 | 139 Parker Av | #2 - per correction notice, revision to 3201505267076: remodel kitchen & full bath, exhaust connect to (e) duct & new led lighting. complete for valuation under #201505267076.Details
#2 - per correction notice, revision to 3201505267076: remodel kitchen & full bath, exhaust connect to (e) duct & new led lighting. complete for valuation under #201505267076. | $20,000 |
| Jun 1, 2015 | Completed final sign-off Mar 2016 | 2346 39th Av | remodel kitchen and bath, upgrade new 100 amp service, p grade new ufer line. new led lights for living roomDetails
remodel kitchen and bath, upgrade new 100 amp service, p grade new ufer line. new led lights for living room | $20,000 |
| Mar 30, 2015 | Completed final sign-off Apr 2016 | 68 Seminole Av | add two bedrooms, a hallway and two full bathrooms to 1st flrDetails
add two bedrooms, a hallway and two full bathrooms to 1st flr | $50,000 |
| Dec 30, 2014 | Completed final sign-off Dec 2015 | 2670 21st Av | legalization of dwelling unit per ordinance 43-14. reconfigure kitchen & baths layout on 1st floor, new meters for new unit; electrical gas & water.Details
legalization of dwelling unit per ordinance 43-14. reconfigure kitchen & baths layout on 1st floor, new meters for new unit; electrical gas & water. | $50,000 |
| Dec 4, 2014 | Completed final sign-off Jan 2015 | 139 Parker Av | unit 3 kitchen & bathroom remodel . replace toilet, tub, faucet, cabinet. window for kitchen and 1 bedroom, u factor .32. new lighting to be high efficacy; replace fanDetails
unit 3 kitchen & bathroom remodel . replace toilet, tub, faucet, cabinet. window for kitchen and 1 bedroom, u factor .32. new lighting to be high efficacy; replace fan | $25,000 |
| Dec 4, 2014 | Completed final sign-off Jan 2015 | 311 Valley St | replace tile and shower faucet for dowstairs bath onlyDetails
replace tile and shower faucet for dowstairs bath only | $1,500 |
| Oct 28, 2014 | Completed final sign-off Dec 2014 | 663 Castro St | bathroom remodeling. replace damaged sheetrock due to water damage. replace shower tub repair floor. no walls removed or added. all fixture layouts to rmain unchanged. to comply with items #9,10,12,14,,15Details
bathroom remodeling. replace damaged sheetrock due to water damage. replace shower tub repair floor. no walls removed or added. all fixture layouts to rmain unchanged. to comply with items #9,10,12,14,,15 | $12,500 |
| May 20, 2014 | Completed final sign-off Jul 2014 | 83 Sylvan Dr | kitchen and bathroom remodeling: replace sink, cabinet, faucet, bathtub, shower pan, fan, toilet. windows inside bathroom. replace window inside kitchen.Details
kitchen and bathroom remodeling: replace sink, cabinet, faucet, bathtub, shower pan, fan, toilet. windows inside bathroom. replace window inside kitchen. | $18,000 |
| May 12, 2014 | Completed final sign-off Feb 2015 | 2770 19th Av | #45: remodel bathroom (40 qs. ft.) kitchen (120 sq.ft) master bathroom (40 sq.ft). replace cabinet, sink, faucets, toilet, bathrtub. cec 150(k) no changes to doors and windows. work for this unit # 45 under this permit.Details
#45: remodel bathroom (40 qs. ft.) kitchen (120 sq.ft) master bathroom (40 sq.ft). replace cabinet, sink, faucets, toilet, bathrtub. cec 150(k) no changes to doors and windows. work for this unit # 45 under this permit. | $19,000 |
| Aug 7, 2013 | Completed final sign-off Nov 2013 | 2671 42nd Av | bath remodeling - replace bath tub, sink, tile, fan; new light all flourescent; (n) exh fan @ bathroom - vent to outside, 3' from plDetails
bath remodeling - replace bath tub, sink, tile, fan; new light all flourescent; (n) exh fan @ bathroom - vent to outside, 3' from pl | $5,000 |
| Oct 11, 2012 | Completed final sign-off May 2013 | 1481 Cayuga Av | construct fire rated walls to separate the proposed 2 bedrooms, 1- full bathroom, laundry area on the ground floor behind garage. relocate (e) washer. dryer, laundry tray & furnace(w/h) on the ground floor.Details
construct fire rated walls to separate the proposed 2 bedrooms, 1- full bathroom, laundry area on the ground floor behind garage. relocate (e) washer. dryer, laundry tray & furnace(w/h) on the ground floor. | $18,000 |
| Apr 10, 2012 | Completed final sign-off Jun 2012 | 2722 42nd Av | kitchen remodel: replace cabinets, coutertop, sink, electric, plumbing hood, dishwasher and lights. bathroom remodel: replace tub, sink, tiles. lighting to comply with cec 150(k)Details
kitchen remodel: replace cabinets, coutertop, sink, electric, plumbing hood, dishwasher and lights. bathroom remodel: replace tub, sink, tiles. lighting to comply with cec 150(k) | $10,000 |