Lopez Quality Construction
- Based in
- Daly City
- On San Francisco permits
- Aug 2017 to Dec 2025
- Last 24 months
- 4 permits filed
28 permits since 2000: 26 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 1 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 57 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 1, 2025 | In progress filed Dec 2025, not yet issued | 495 Corbett Av | add decks and stairs to rear of house, relocate(e) window with glass door/sidelight on first floor.Details
add decks and stairs to rear of house, relocate(e) window with glass door/sidelight on first floor. | $100,000 |
| Aug 13, 2020 | Never finaled issued Aug 2020, no final | 100 Ulloa St | install new 14 windows & 2 doors in kind in front & left side of house (n) insulation,(n) sheating,(n) stucco,repair dryot in front stair case, (n) tile in front stairs.approx 2800 sq.ft. no change to building's architectual elements - windows at front to be wood or wood interior with aluinum cladDetails
install new 14 windows & 2 doors in kind in front & left side of house (n) insulation,(n) sheating,(n) stucco,repair dryot in front stair case, (n) tile in front stairs.approx 2800 sq.ft. no change to building's architectual elements - windows at front to be wood or wood interior with aluinum clad | $80,000 |
| Jun 11, 2018 | Completed final sign-off Aug 2018 | 366 Arlington St | dry rot repair in the front of the house stairs, new wood siding in kind paint, guardrails repair wood cedar siding.Details
dry rot repair in the front of the house stairs, new wood siding in kind paint, guardrails repair wood cedar siding. | $8,000 |