Back to bathroom remodel contractors
Lopez Quality Construction
- Based in
- Daly City
- On San Francisco permits
- Aug 2017 to Dec 2025
- Last 24 months
- 4 permits filed
28 permits since 2000: 26 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 11 completed. Typically 0 days from filing to permit and 115 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 29, 2024 | Completed final sign-off Jun 2025 | 3622 Broderick St | kitchen and 2 full bathrooms remodel like for like. no moving walls. fixtures to remain in the same location. kitchen approx. 180 sq ft. each bathroom approx. 40 sq ft.no moving wall fixtures to remain in same locatioin.Details
kitchen and 2 full bathrooms remodel like for like. no moving walls. fixtures to remain in the same location. kitchen approx. 180 sq ft. each bathroom approx. 40 sq ft.no moving wall fixtures to remain in same locatioin. | $80,000 |
| Jan 3, 2024 | Completed final sign-off Mar 2024 | 1600 York St | 2 bathrooms remodels, like for like, plumbing upgrade as needed, electical upgrade as neededDetails
2 bathrooms remodels, like for like, plumbing upgrade as needed, electical upgrade as needed | $40,000 |
| Oct 16, 2023 | Completed final sign-off Dec 2023 | 2830 Golden Gate Av | bathroom remodel: like for like: new toilet same location, new vanity same location, new shoer vlave, new tile, not electrical work, just light fixtures replaceDetails
bathroom remodel: like for like: new toilet same location, new vanity same location, new shoer vlave, new tile, not electrical work, just light fixtures replace | $20,000 |
| Sep 15, 2023 | Completed final sign-off Oct 2023 | 151 Moffitt St | bath remodel bathtub area only change showr valve shower head, tile, tub same layout. no electrical work. no wall changes. (e) toilet and vanity to remain.Details
bath remodel bathtub area only change showr valve shower head, tile, tub same layout. no electrical work. no wall changes. (e) toilet and vanity to remain. | $15,000 |
| Mar 30, 2023 | Completed final sign-off Sep 2023 | 306 Church St | 2/f unit# 306: remodel kitchen entirely w/new fixtures & finishes, convert existing full bathroom into 2 full bathrooms, install new heating unit.Details
2/f unit# 306: remodel kitchen entirely w/new fixtures & finishes, convert existing full bathroom into 2 full bathrooms, install new heating unit. | $80,000 |
| Jan 25, 2022 | Completed final sign-off Feb 2023 | 827 33rd Av | convert extg powder room to a bathroom at ground floor with a new window. at rear elevation, replace 3 extg windows with a french door unit.Details
convert extg powder room to a bathroom at ground floor with a new window. at rear elevation, replace 3 extg windows with a french door unit. | $25,000 |
| Sep 16, 2021 | Completed final sign-off Apr 2022 | 2830 Golden Gate Av | bathroom replace the tile walls and floor and paint.in kindDetails
bathroom replace the tile walls and floor and paint.in kind | $8,000 |
| Oct 1, 2020 | Completed final sign-off Nov 2020 | 2 Sharon St | kitchen, bathroom and laundry, remodel in kind. new cabinets, dry wall, insulation, replace shower valve sinks. upgrade electrical everything in kind, same layout. replace 44 wood windows around the house in kind same size sam eopenings, wood windows.Details
kitchen, bathroom and laundry, remodel in kind. new cabinets, dry wall, insulation, replace shower valve sinks. upgrade electrical everything in kind, same layout. replace 44 wood windows around the house in kind same size sam eopenings, wood windows. | $93,000 |
| May 28, 2020 | Completed final sign-off Sep 2020 | 2719 Pine St | bathroom remodel in kind. replace toilet, sink and vanity in same location. new waste and drain. keep the shower same , install new drywall around toilets and sinks and install new tile in the floor. all work in kind.Details
bathroom remodel in kind. replace toilet, sink and vanity in same location. new waste and drain. keep the shower same , install new drywall around toilets and sinks and install new tile in the floor. all work in kind. | $10,000 |
| Mar 16, 2020 | Completed final sign-off Jun 2020 | 151 Moffitt St | bathroom remodel in kind.Details
bathroom remodel in kind. | $20,575 |
| Nov 16, 2017 | Completed final sign-off Mar 2018 | 132 Moffitt St | remove vinyl siding from front second level facade and replace with smooth finish stucco siding; retain existing wood fascia; bathroom remodel, new plumbing/fixtures, new electrical, new drywall, new insulationDetails
remove vinyl siding from front second level facade and replace with smooth finish stucco siding; retain existing wood fascia; bathroom remodel, new plumbing/fixtures, new electrical, new drywall, new insulation | $28,000 |