Block 1142, lot 011
2830 Golden Gate Ave
- City’s use
- Single Family Residential
- Built
- 1931
- Stories
- 1
- Units
- 1
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 2,260 sq ft
- Lot
- 3,438 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 16, 2023 | Completed final sign-off Dec 2023 | 2830 Golden Gate Av | Lopez Quality Construction | bathroom remodel: like for like: new toilet same location, new vanity same location, new shoer vlave, new tile, not electrical work, just light fixtures replaceDetails
bathroom remodel: like for like: new toilet same location, new vanity same location, new shoer vlave, new tile, not electrical work, just light fixtures replace | $20,000 |
| Sep 16, 2021 | Completed final sign-off Apr 2022 | 2830 Golden Gate Av | Lopez Quality Construction | bathroom replace the tile walls and floor and paint.in kindDetails
bathroom replace the tile walls and floor and paint.in kind | $8,000 |
| Aug 14, 2017 | Never finaled issued Aug 2017, no final | 2830 Golden Gate Av | street spaceDetails
street space | ||
| Jul 19, 2013 | Expired or cancelled cancelled Jan 2026 | 2830 Golden Gate Av | addition within lower building level of 1 bedroom, remodel of (e) laundry room into kitchen. legalize (e) bathroomDetails
addition within lower building level of 1 bedroom, remodel of (e) laundry room into kitchen. legalize (e) bathroom | $25,000 | |
| May 5, 2009 | Completed final sign-off Jul 2009 | 2830 Golden Gate Av | Farallon General Contractors Inc. | addition of bathroom shower main floor of house. scope: removal of partition wall dividing toilet room and closet. add shower, vanity sink, rough/finish plumbing gfi recep. removal of window, frame in, add siding, verify walls are non bearing, add 1 (n) exhaust fanDetails
addition of bathroom shower main floor of house. scope: removal of partition wall dividing toilet room and closet. add shower, vanity sink, rough/finish plumbing gfi recep. removal of window, frame in, add siding, verify walls are non bearing, add 1 (n) exhaust fan | $14,800 |
| Dec 19, 2002 | Completed final sign-off Apr 2003 | 2830 Golden Gate Av | remodel exist kitchen, cabinet, countertop/flooring. rmdl exist bath 2nd fl single family dwellingDetails
remodel exist kitchen, cabinet, countertop/flooring. rmdl exist bath 2nd fl single family dwelling | $8,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Lopez Quality Construction (2), Farallon General Contractors Inc.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.