Back to kitchen remodel contractors
Loi Electric Company
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to May 2026
- Last 24 months
- 3 permits filed
48 permits since 2000: 37 completed, 1 in progress, 6 never finaled, 4 expired or cancelled.
Of the 6 never-finaled permits, 3 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
16 kitchen remodel permits: 14 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 186 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 20, 2026 | Expired or cancelled suspend Sep 2026 | 1310 Gilman Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $58,000 |
| Oct 7, 2024 | Completed final sign-off Oct 2025 | 309 Molimo Dr | remove and replace kitchen cabinet, countertop & backsplash. remodel bathroom - new tile, bath fan, light fixtures. remove old carpet, sand stain at existing floor. replace furnace.Details
remove and replace kitchen cabinet, countertop & backsplash. remodel bathroom - new tile, bath fan, light fixtures. remove old carpet, sand stain at existing floor. replace furnace. | $35,000 |
| Dec 28, 2023 | Completed final sign-off Jul 2025 | 4005 Folsom St | remodel bathroom and kitchen, replace new cabinet, new sink, new floor, new shower, sink, lights and faucet. install new lights in the living room and outlets in the kitchen / bath non structuralDetails
remodel bathroom and kitchen, replace new cabinet, new sink, new floor, new shower, sink, lights and faucet. install new lights in the living room and outlets in the kitchen / bath non structural | $28,000 |
| Sep 5, 2023 | Completed final sign-off Dec 2024 | 65 Dorado Tr | remodel master bath, remodle kitchen, replace cabinet. relocate electrical subpanel, new shower pan & plumbing. fixture for master bath. replace carpet with hardwood, paint interior, replace existing can lights for led. no walls moved or removed. keep same layout.Details
remodel master bath, remodle kitchen, replace cabinet. relocate electrical subpanel, new shower pan & plumbing. fixture for master bath. replace carpet with hardwood, paint interior, replace existing can lights for led. no walls moved or removed. keep same layout. | $40,000 |
| Feb 27, 2023 | Completed final sign-off Aug 2023 | 110 Scotia Av | remodel (e) kitchen, bathroom, & construct 1 full bath. all work on 2/f.Details
remodel (e) kitchen, bathroom, & construct 1 full bath. all work on 2/f. | $58,000 |
| Dec 29, 2022 | Completed final sign-off Feb 2023 | 625 Visitacion Av | comply w/ complaint # 202200826 & 202299744: legalize family room, bedroom, storage room, full bathroom, & install kitchenette at g/f.convert (e) dining room into bedroom & remove 1 shower stall at 2/f.Details
comply w/ complaint # 202200826 & 202299744: legalize family room, bedroom, storage room, full bathroom, & install kitchenette at g/f.convert (e) dining room into bedroom & remove 1 shower stall at 2/f. | $82,000 |
| Sep 10, 2021 | Completed final sign-off Aug 2022 | 1414 40th Av | proposed to remodel kitchen & bathroom, add 1 mster bathroom and replace 4 rear windows as shown on proposed planDetails
proposed to remodel kitchen & bathroom, add 1 mster bathroom and replace 4 rear windows as shown on proposed plan | $65,000 |
| Mar 3, 2021 | Completed final sign-off Jun 2021 | 1445 Sloat Bl | remodel previously install kitchen & 2 bathroom. to comply with complaint 202173792. 13 lights for kitchen & bathroom.Details
remodel previously install kitchen & 2 bathroom. to comply with complaint 202173792. 13 lights for kitchen & bathroom. | $38,000 |
| Apr 1, 2019 | Completed final sign-off Jul 2019 | 81 Broad St | install lnew kitchen cabinets & new countertop only. install new outlet on counter topDetails
install lnew kitchen cabinets & new countertop only. install new outlet on counter top | $7,000 |
| Jul 24, 2018 | Completed final sign-off Jan 2019 | 541 Wildwood Wy | construct 1 bedroom, 1 full bath, upgrade family rm at gr fl. remove wall between kitchen/liv rm and upgrade partial celing joists at 2nd flDetails
construct 1 bedroom, 1 full bath, upgrade family rm at gr fl. remove wall between kitchen/liv rm and upgrade partial celing joists at 2nd fl | $45,000 |
| Jun 13, 2016 | Completed final sign-off Dec 2016 | 1510 34th Av | relocate kitchen, convert (e) kitchen into study room. remodel (e) bathroom. remove central patio & re-wire electrical in dining room & upgrade partial ceiling framing all work at 2nd floor.Details
relocate kitchen, convert (e) kitchen into study room. remodel (e) bathroom. remove central patio & re-wire electrical in dining room & upgrade partial ceiling framing all work at 2nd floor. | $38,000 |
| Apr 25, 2016 | Completed final sign-off Nov 2016 | 835 Clement St | remodel ext kitchen and bath room. construct one new full bath room. rewire electrical and lightings at 3rd floor.Details
remodel ext kitchen and bath room. construct one new full bath room. rewire electrical and lightings at 3rd floor. | $42,000 |
| Sep 8, 2015 | Completed final sign-off May 2016 | 130 Borica St | comply w/complaint#201557631. unit legalization ord 43-14. legalization of dwelling unit installed without permit. legalize (e) kitchen. all work at ground floor. per ordinance 146.15Details
comply w/complaint#201557631. unit legalization ord 43-14. legalization of dwelling unit installed without permit. legalize (e) kitchen. all work at ground floor. per ordinance 146.15 | $12,000 |
| Mar 3, 2014 | Completed final sign-off May 2014 | 51 Belle Av | convert closet to bathroom. remodel kitchen and bath. relocate door to rear yard. dryrot repair at porch decking.Details
convert closet to bathroom. remodel kitchen and bath. relocate door to rear yard. dryrot repair at porch decking. | $38,000 |
| Oct 7, 2010 | Expired or cancelled expired Apr 2013 | 612 Cabrillo St | relocate, remodel kitchen replace new cabinet, new sink, new electrical outlet, no structural work, new lighting comply with cec 150(k); and bathroom remodel, new sink, shower, toilet, relocateDetails
relocate, remodel kitchen replace new cabinet, new sink, new electrical outlet, no structural work, new lighting comply with cec 150(k); and bathroom remodel, new sink, shower, toilet, relocate | $13,000 |
| Jun 15, 2006 | Completed final sign-off Jan 2007 | 4186 17th St | remodel 4 kitchens. replace cabinets, sink, and 3 baths. new electrical wiring. nec.Details
remodel 4 kitchens. replace cabinets, sink, and 3 baths. new electrical wiring. nec. | $28,000 |