Back to bathroom remodel contractors
Loi Electric Company
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to May 2026
- Last 24 months
- 3 permits filed
48 permits since 2000: 37 completed, 1 in progress, 6 never finaled, 4 expired or cancelled.
Of the 6 never-finaled permits, 3 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
25 bathroom remodel permits: 22 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 98 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 20, 2026 | Expired or cancelled suspend Sep 2026 | 1310 Gilman Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $58,000 |
| Oct 7, 2024 | Completed final sign-off Oct 2025 | 309 Molimo Dr | remove and replace kitchen cabinet, countertop & backsplash. remodel bathroom - new tile, bath fan, light fixtures. remove old carpet, sand stain at existing floor. replace furnace.Details
remove and replace kitchen cabinet, countertop & backsplash. remodel bathroom - new tile, bath fan, light fixtures. remove old carpet, sand stain at existing floor. replace furnace. | $35,000 |
| Dec 28, 2023 | Completed final sign-off Jul 2025 | 4005 Folsom St | remodel bathroom and kitchen, replace new cabinet, new sink, new floor, new shower, sink, lights and faucet. install new lights in the living room and outlets in the kitchen / bath non structuralDetails
remodel bathroom and kitchen, replace new cabinet, new sink, new floor, new shower, sink, lights and faucet. install new lights in the living room and outlets in the kitchen / bath non structural | $28,000 |
| Oct 12, 2023 | Completed final sign-off Dec 2023 | 4005 Folsom St | remodel ground floor bathroom. replace toilet, sink, bathtub faucet, vanity, exhaust fan, switch and outlet and tile on the ground floor. like for likeDetails
remodel ground floor bathroom. replace toilet, sink, bathtub faucet, vanity, exhaust fan, switch and outlet and tile on the ground floor. like for like | $7,000 |
| Oct 2, 2023 | Completed final sign-off Dec 2024 | 65 Dorado Tr | revision to pa# 202309055864, retile guest or hallway bathroom shown & bathroom flooring, replace vanity, sink, toilet & bathroom fan.Details
revision to pa# 202309055864, retile guest or hallway bathroom shown & bathroom flooring, replace vanity, sink, toilet & bathroom fan. | $5,000 |
| Sep 5, 2023 | Completed final sign-off Dec 2024 | 65 Dorado Tr | remodel master bath, remodle kitchen, replace cabinet. relocate electrical subpanel, new shower pan & plumbing. fixture for master bath. replace carpet with hardwood, paint interior, replace existing can lights for led. no walls moved or removed. keep same layout.Details
remodel master bath, remodle kitchen, replace cabinet. relocate electrical subpanel, new shower pan & plumbing. fixture for master bath. replace carpet with hardwood, paint interior, replace existing can lights for led. no walls moved or removed. keep same layout. | $40,000 |
| Jun 15, 2023 | Completed final sign-off Aug 2023 | 424 45th Av | comply with nov202309355. 1 bath remodel (hallway). replace tub/shower pan. replace plumbing fixtures. replace toilet. replace single vanity with double sink. install new exhaust fans, new outlets, and new lighting fixtures. tile for shower.Details
comply with nov202309355. 1 bath remodel (hallway). replace tub/shower pan. replace plumbing fixtures. replace toilet. replace single vanity with double sink. install new exhaust fans, new outlets, and new lighting fixtures. tile for shower. | $9,000 |
| Apr 11, 2023 | Completed final sign-off May 2023 | 294 Sadowa St | comply w/ complaint #202305714: construct 1 storage room & 1 full bath. all work on g/f.Details
comply w/ complaint #202305714: construct 1 storage room & 1 full bath. all work on g/f. | $50,800 |
| Feb 27, 2023 | Completed final sign-off Aug 2023 | 110 Scotia Av | remodel (e) kitchen, bathroom, & construct 1 full bath. all work on 2/f.Details
remodel (e) kitchen, bathroom, & construct 1 full bath. all work on 2/f. | $58,000 |
| Dec 29, 2022 | Completed final sign-off Feb 2023 | 625 Visitacion Av | comply w/ complaint # 202200826 & 202299744: legalize family room, bedroom, storage room, full bathroom, & install kitchenette at g/f.convert (e) dining room into bedroom & remove 1 shower stall at 2/f.Details
comply w/ complaint # 202200826 & 202299744: legalize family room, bedroom, storage room, full bathroom, & install kitchenette at g/f.convert (e) dining room into bedroom & remove 1 shower stall at 2/f. | $82,000 |
| Jan 10, 2022 | Completed final sign-off Mar 2022 | 243 Moraga St | bathroom remodel in-kind. remove & replace sink, toilet, & bathtub. replace 1 outlet's electrical fixture. remove & replace new tile & backsplash.Details
bathroom remodel in-kind. remove & replace sink, toilet, & bathtub. replace 1 outlet's electrical fixture. remove & replace new tile & backsplash. | $12,000 |
| Sep 10, 2021 | Completed final sign-off Aug 2022 | 1414 40th Av | proposed to remodel kitchen & bathroom, add 1 mster bathroom and replace 4 rear windows as shown on proposed planDetails
proposed to remodel kitchen & bathroom, add 1 mster bathroom and replace 4 rear windows as shown on proposed plan | $65,000 |
| Mar 3, 2021 | Completed final sign-off Jun 2021 | 1445 Sloat Bl | remodel previously install kitchen & 2 bathroom. to comply with complaint 202173792. 13 lights for kitchen & bathroom.Details
remodel previously install kitchen & 2 bathroom. to comply with complaint 202173792. 13 lights for kitchen & bathroom. | $38,000 |
| Jan 26, 2021 | Completed final sign-off Jun 2021 | 2355 38th Av | to comply with nov # 202018061. to legalize 1 bedroom, 1 family room & full bath on ground level.Details
to comply with nov # 202018061. to legalize 1 bedroom, 1 family room & full bath on ground level. | $40,000 |
| Jun 3, 2019 | Completed final sign-off Jun 2019 | 1363 14th Av | remodel existing permitted bathroom on ground floor. replace sink & shower. install new outlet gfci & replace light fixtureDetails
remodel existing permitted bathroom on ground floor. replace sink & shower. install new outlet gfci & replace light fixture | $9,500 |
| Jul 24, 2018 | Completed final sign-off Jan 2019 | 541 Wildwood Wy | construct 1 bedroom, 1 full bath, upgrade family rm at gr fl. remove wall between kitchen/liv rm and upgrade partial celing joists at 2nd flDetails
construct 1 bedroom, 1 full bath, upgrade family rm at gr fl. remove wall between kitchen/liv rm and upgrade partial celing joists at 2nd fl | $45,000 |
| Jul 5, 2018 | Completed final sign-off Dec 2018 | 626 Colby St | 1)construct one bed room, family room, one full bathroom, & storage room at ground floor. 2)construct one new full bathroom at 2nd floorDetails
1)construct one bed room, family room, one full bathroom, & storage room at ground floor. 2)construct one new full bathroom at 2nd floor | $52,000 |
| Mar 5, 2018 | Never finaled issued Apr 2018, no final | 1789 Mission St | change of use to mercantile use/occupancy. new lighting showroom and add new bathroom in existing storage warehouse on ground floor. (e) office on 2nd floor, relocating stair and adding new on 2nd floor. remodel accessory office and bath. mep sep permitDetails
change of use to mercantile use/occupancy. new lighting showroom and add new bathroom in existing storage warehouse on ground floor. (e) office on 2nd floor, relocating stair and adding new on 2nd floor. remodel accessory office and bath. mep sep permit | $100,000 |
| Mar 5, 2018 | Completed final sign-off May 2018 | 2669 Ocean Av | convert vacant space to nail salon: remodel bathroom to convert to handicap bathroom. 2 new waxing rooms. mep under separate permit.Details
convert vacant space to nail salon: remodel bathroom to convert to handicap bathroom. 2 new waxing rooms. mep under separate permit. | $15,000 |
| Jun 13, 2016 | Completed final sign-off Dec 2016 | 1510 34th Av | relocate kitchen, convert (e) kitchen into study room. remodel (e) bathroom. remove central patio & re-wire electrical in dining room & upgrade partial ceiling framing all work at 2nd floor.Details
relocate kitchen, convert (e) kitchen into study room. remodel (e) bathroom. remove central patio & re-wire electrical in dining room & upgrade partial ceiling framing all work at 2nd floor. | $38,000 |
| Apr 25, 2016 | Completed final sign-off Nov 2016 | 835 Clement St | remodel ext kitchen and bath room. construct one new full bath room. rewire electrical and lightings at 3rd floor.Details
remodel ext kitchen and bath room. construct one new full bath room. rewire electrical and lightings at 3rd floor. | $42,000 |
| Jun 4, 2015 | Completed final sign-off Aug 2015 | 2378 27th Av | comply w/nov #201545631 - legalize two bedrooms, one full bathroom & laundry area at ground floor.Details
comply w/nov #201545631 - legalize two bedrooms, one full bathroom & laundry area at ground floor. | $32,000 |
| Mar 3, 2014 | Completed final sign-off May 2014 | 51 Belle Av | convert closet to bathroom. remodel kitchen and bath. relocate door to rear yard. dryrot repair at porch decking.Details
convert closet to bathroom. remodel kitchen and bath. relocate door to rear yard. dryrot repair at porch decking. | $38,000 |
| Oct 7, 2010 | Expired or cancelled expired Apr 2013 | 612 Cabrillo St | relocate, remodel kitchen replace new cabinet, new sink, new electrical outlet, no structural work, new lighting comply with cec 150(k); and bathroom remodel, new sink, shower, toilet, relocateDetails
relocate, remodel kitchen replace new cabinet, new sink, new electrical outlet, no structural work, new lighting comply with cec 150(k); and bathroom remodel, new sink, shower, toilet, relocate | $13,000 |
| Jun 15, 2006 | Completed final sign-off Jan 2007 | 4186 17th St | remodel 4 kitchens. replace cabinets, sink, and 3 baths. new electrical wiring. nec.Details
remodel 4 kitchens. replace cabinets, sink, and 3 baths. new electrical wiring. nec. | $28,000 |