Back to bathroom remodel contractors
Logan Design & Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Apr 2013
- Last 24 months
- 0 permits filed
72 permits since 2000: 46 completed, 9 never finaled, 17 expired or cancelled.
Of the 9 never-finaled permits, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
22 bathroom remodel permits: 17 completed, 2 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 244 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 19, 2013 | Never finaled issued Apr 2013, no final | 1254 26th Av | replace existing bath fixtures and tile in existing 3/f bathroom, not adding or removing any walls.Details
replace existing bath fixtures and tile in existing 3/f bathroom, not adding or removing any walls. | $10,000 |
| Oct 19, 2012 | Completed final sign-off Nov 2012 | 240 Richland Av | remodel bathroom replace in kindDetails
remodel bathroom replace in kind | $4,000 |
| Jun 17, 2011 | Completed final sign-off Sep 2011 | 1866 41st Av | in-kind kitchen and bath replacement. no structural work or wall movement. new cabinets, counters, floors and appliance. enclose extg entry way hall.remove inerior non-bearing wall.Details
in-kind kitchen and bath replacement. no structural work or wall movement. new cabinets, counters, floors and appliance. enclose extg entry way hall.remove inerior non-bearing wall. | $30,000 |
| Mar 31, 2011 | Completed final sign-off Jul 2011 | 1827 Vallejo St | bathroom remodel to include shower in current closet space new fixtures, cabinetry, flooring, lighting. 3rd floor.Details
bathroom remodel to include shower in current closet space new fixtures, cabinetry, flooring, lighting. 3rd floor. | $15,000 |
| Dec 16, 2010 | Completed final sign-off Mar 2013 | 3367 21st St | to comply with nov #201056869. removing extg walls. remove kitchen. reconfigure layout at ground floor adding 2 bathrooms,office. stair work and landing as per plan.Details
to comply with nov #201056869. removing extg walls. remove kitchen. reconfigure layout at ground floor adding 2 bathrooms,office. stair work and landing as per plan. | $140,000 |
| Dec 8, 2010 | Completed final sign-off Mar 2013 | 56 Richland Av | remodel & rear addition on ground floor. to include new rooms & bath & laundry on ground floor. remodel kitchen on 1st floor with relocated bath & new deck. new stair. garage & parking to remain as configured.Details
remodel & rear addition on ground floor. to include new rooms & bath & laundry on ground floor. remodel kitchen on 1st floor with relocated bath & new deck. new stair. garage & parking to remain as configured. | $50,000 |
| Nov 15, 2010 | Completed final sign-off Feb 2011 | 237 Lexington St | unit #237a-remodel bathroom on 1st floor condoDetails
unit #237a-remodel bathroom on 1st floor condo | $18,000 |
| Apr 27, 2010 | Completed final sign-off Oct 2010 | 230 Hermann St | remodeling work in 3rd. floor flat @ 232 hermann st. including; remodeled bath & kitchen, relocate laundry, remove 2-walls & replace w/ new beams.Details
remodeling work in 3rd. floor flat @ 232 hermann st. including; remodeled bath & kitchen, relocate laundry, remove 2-walls & replace w/ new beams. | $40,000 |
| Dec 22, 2009 | Expired or cancelled expired Dec 2012 | 155 Evelyn Wy | remodel first floor including new bathroom, laundry and new partitiion wall within interior space.Details
remodel first floor including new bathroom, laundry and new partitiion wall within interior space. | $30,000 |
| Jul 29, 2008 | Completed final sign-off Feb 2009 | 160 Broadmoor Dr | in kind replacement of master bathroom. all fixtures & windows in same location. 2 windows in bathroom. not visible from street.Details
in kind replacement of master bathroom. all fixtures & windows in same location. 2 windows in bathroom. not visible from street. | $15,715 |
| Jul 6, 2007 | Completed final sign-off Feb 2009 | 160 Broadmoor Dr | additon to the rear of building to extend garage 14' beyond its existing location. garage level will be remodeled to include new full and 1/2 baths and new laundry area.Details
additon to the rear of building to extend garage 14' beyond its existing location. garage level will be remodeled to include new full and 1/2 baths and new laundry area. | $60,000 |
| Jan 19, 2007 | Completed final sign-off Oct 2007 | 1262 Church St | remodel kichen, bathroom, and offic . all kwork to be contained in extg bldg envelope. work occurs at lower. 2 story onlyDetails
remodel kichen, bathroom, and offic . all kwork to be contained in extg bldg envelope. work occurs at lower. 2 story only | $40,000 |
| Mar 7, 2006 | Completed final sign-off Mar 2007 | 123 Clearfield Dr | remodel existing kitchen, remodel existing lounge & add full bath on lower level. new stair to conect main level and lower leve.Details
remodel existing kitchen, remodel existing lounge & add full bath on lower level. new stair to conect main level and lower leve. | $40,000 |
| Dec 1, 2005 | Completed final sign-off Jun 2006 | 31 Camp St | remodel kitchen & bathroom to 6 apartments.new kitchen cabinets in all 6 units.new laundry room/closet in all 6 units.6 electricl washer/dryer in all 6 units.demo/build partitions & add doors to create access to front bedroom (n) & closet.Details
remodel kitchen & bathroom to 6 apartments.new kitchen cabinets in all 6 units.new laundry room/closet in all 6 units.6 electricl washer/dryer in all 6 units.demo/build partitions & add doors to create access to front bedroom (n) & closet. | $78,000 |
| Jun 22, 2005 | Expired or cancelled expired Sep 2013 | 1541 Filbert St | remodel kitchen & bathroom, plumbing & electrical work.Details
remodel kitchen & bathroom, plumbing & electrical work. | $60,000 |
| Mar 25, 2005 | Completed final sign-off May 2007 | 19 Miramar Av | addition to (e)structure including new relocated kitchen,master bedroom,bath,new deck.Details
addition to (e)structure including new relocated kitchen,master bedroom,bath,new deck. | $150,000 |
| Jan 26, 2005 | Never finaled issued Jan 2005, no final | 186 Granville Wy | remodel 2nd fl kitchen (0 & downstairs den (e) bath & laundry, (e) area. replace wdbeam (e) w/ newDetails
remodel 2nd fl kitchen (0 & downstairs den (e) bath & laundry, (e) area. replace wdbeam (e) w/ new | $100,000 |
| Nov 17, 2004 | Completed final sign-off May 2005 | 1245 16th Av | remodel kitchen & add bathroom where (e) closet is.Details
remodel kitchen & add bathroom where (e) closet is. | $35,000 |
| Nov 13, 2003 | Completed final sign-off Oct 2004 | 67 Marne Av | add new master bath & bed on 1st floor/1 additional room and interior stairDetails
add new master bath & bed on 1st floor/1 additional room and interior stair | $30,000 |
| Apr 16, 2003 | Completed final sign-off Dec 2003 | 261 Dalewood Wy | remodel 1 bath, add 1 bath within existing structure on 2nd floor of building.Details
remodel 1 bath, add 1 bath within existing structure on 2nd floor of building. | $20,000 |
| Oct 28, 2002 | Completed final sign-off Aug 2003 | 298 Juanita Wy | minor interior remodel with (e)bldg. envelope, legalize basement, add bathroom in same area,Details
minor interior remodel with (e)bldg. envelope, legalize basement, add bathroom in same area, | $100,000 |
| May 15, 2002 | Expired or cancelled expired Jun 2004 | 297 Juanita Wy | kitchen remodel, master bath remodel. add interior stair, laundry room, & lounge remodel gusep bathDetails
kitchen remodel, master bath remodel. add interior stair, laundry room, & lounge remodel gusep bath | $200,000 |