Logan Design & Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Apr 2013
- Last 24 months
- 0 permits filed
72 permits since 2000: 46 completed, 9 never finaled, 17 expired or cancelled.
Of the 9 never-finaled permits, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
5 deck permits: 3 completed, 1 never finaled, 1 expired or cancelled. Typically 268 days from filing to permit and 565 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 31, 2011 | Completed final sign-off Apr 2011 | 30 Stanford Heights Av | dry rot repair, replace one deck joist, several deck boards, studs, sheating, shingles, 20 sf. all work in kindDetails
dry rot repair, replace one deck joist, several deck boards, studs, sheating, shingles, 20 sf. all work in kind | $2,000 |
| Dec 8, 2010 | Completed final sign-off Mar 2013 | 56 Richland Av | remodel & rear addition on ground floor. to include new rooms & bath & laundry on ground floor. remodel kitchen on 1st floor with relocated bath & new deck. new stair. garage & parking to remain as configured.Details
remodel & rear addition on ground floor. to include new rooms & bath & laundry on ground floor. remodel kitchen on 1st floor with relocated bath & new deck. new stair. garage & parking to remain as configured. | $50,000 |
| Nov 24, 2010 | Expired or cancelled expired Apr 2022 | 3367 21st St | repair & legalize (e) deck. fill-in room under (e) 1st dining room. small window addition in front - lower service entrance. in kind repair of stairs leading to lower service entrance. rear facade alterations.Details
repair & legalize (e) deck. fill-in room under (e) 1st dining room. small window addition in front - lower service entrance. in kind repair of stairs leading to lower service entrance. rear facade alterations. | $5,000 |
| Sep 8, 2010 | Never finaled issued Sep 2012, no final | 3657 Folsom St | remove existing winder stairs @ rear of house & replace with new deck & stairs. replace low concrete retain wall. replace 1st level porch wall. paint.Details
remove existing winder stairs @ rear of house & replace with new deck & stairs. replace low concrete retain wall. replace 1st level porch wall. paint. | $20,000 |
| Mar 25, 2005 | Completed final sign-off May 2007 | 19 Miramar Av | addition to (e)structure including new relocated kitchen,master bedroom,bath,new deck.Details
addition to (e)structure including new relocated kitchen,master bedroom,bath,new deck. | $150,000 |