Back to kitchen remodel contractors
Lisheng Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- May 2009 to Aug 2024
- Last 24 months
- 0 permits filed
14 permits since 2000: 14 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 7 days from filing to permit and 117 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 27, 2024 | Completed final sign-off Jun 2025 | 1743 37th Av | 2nd fl convert e 1/2 bath to full bath. in kind to remodel existing kitchen and 1 full bath. remove e fireplace . in kind replace 3 windows at rear, e bedrooms and 1 window in kitchen. move laundry room from 1st fl to 2nd fl. interior stair modification. add kitchenette at 1st flDetails
2nd fl convert e 1/2 bath to full bath. in kind to remodel existing kitchen and 1 full bath. remove e fireplace . in kind replace 3 windows at rear, e bedrooms and 1 window in kitchen. move laundry room from 1st fl to 2nd fl. interior stair modification. add kitchenette at 1st fl | $40,000 |
| May 17, 2019 | Completed final sign-off Sep 2019 | 4081 Mission St | recofigure extg kitchen layout per planDetails
recofigure extg kitchen layout per plan | $15,000 |
| Dec 7, 2018 | Completed final sign-off Aug 2019 | 1447 25th Av | 1st fl: add 1 bedroom, 1 full bath & 1 family rm. 2nd fl: remodel kitchen & bathroom. 3rd fl: remodel bath & add 1 full bath.Details
1st fl: add 1 bedroom, 1 full bath & 1 family rm. 2nd fl: remodel kitchen & bathroom. 3rd fl: remodel bath & add 1 full bath. | $100,000 |
| Mar 2, 2018 | Completed final sign-off Aug 2018 | 159 Granada Av | construct 1 family rm & 1 full bath at grnd flr. remodel (e) kitchen, 2 bathrm & convert (e) dining rm into bedroom at 2ndDetails
construct 1 family rm & 1 full bath at grnd flr. remodel (e) kitchen, 2 bathrm & convert (e) dining rm into bedroom at 2nd | $52,000 |
| Apr 5, 2010 | Completed final sign-off Jun 2010 | 1022 Silliman St | kitchen & bathroom remodel, countertops, install 5 outlets and 2 switches, lights. repair sink.Details
kitchen & bathroom remodel, countertops, install 5 outlets and 2 switches, lights. repair sink. | $25,000 |
| Sep 14, 2009 | Completed final sign-off Dec 2009 | 1558 Stockton St | remodel kitchen, patching dry wall for upgrade electrical.Details
remodel kitchen, patching dry wall for upgrade electrical. | $15,000 |
| May 1, 2009 | Completed final sign-off Jul 2009 | 4050 Folsom St | remodel kitchen, including cabinets, electrical outlet and sinks.Details
remodel kitchen, including cabinets, electrical outlet and sinks. | $30,000 |