Lisheng Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- May 2009 to Aug 2024
- Last 24 months
- 0 permits filed
14 permits since 2000: 14 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 27, 2024 | Completed final sign-off Jun 2025 | 1743 37th Av | 2nd fl convert e 1/2 bath to full bath. in kind to remodel existing kitchen and 1 full bath. remove e fireplace . in kind replace 3 windows at rear, e bedrooms and 1 window in kitchen. move laundry room from 1st fl to 2nd fl. interior stair modification. add kitchenette at 1st flDetails
2nd fl convert e 1/2 bath to full bath. in kind to remodel existing kitchen and 1 full bath. remove e fireplace . in kind replace 3 windows at rear, e bedrooms and 1 window in kitchen. move laundry room from 1st fl to 2nd fl. interior stair modification. add kitchenette at 1st fl | $40,000 |
| Dec 23, 2021 | Completed final sign-off Sep 2022 | 3508 Geary Bl | in-kind: rebuild/remake rear yard wooden stairs.Details
in-kind: rebuild/remake rear yard wooden stairs. | $10,000 |
| Dec 10, 2021 | Completed final sign-off Mar 2022 | 226 El Camino Del Mar | one bathroom remodel. non structural.Details
one bathroom remodel. non structural. | $9,000 |
| Aug 29, 2019 | Completed final sign-off Mar 2020 | 283 Mangels Av | gr fl remodel, 1 bedroom, 1 full bath, and family room. new patio at rearDetails
gr fl remodel, 1 bedroom, 1 full bath, and family room. new patio at rear | $50,000 |
| May 17, 2019 | Completed final sign-off Sep 2019 | 4081 Mission St | recofigure extg kitchen layout per planDetails
recofigure extg kitchen layout per plan | $15,000 |
| May 2, 2019 | Completed final sign-off Aug 2019 | 1447 25th Av | rev to ba 201812077810; reconfigure bathroom layouts enlarge deck at rearDetails
rev to ba 201812077810; reconfigure bathroom layouts enlarge deck at rear | $1,000 |
| Dec 7, 2018 | Completed final sign-off Aug 2019 | 1447 25th Av | 1st fl: add 1 bedroom, 1 full bath & 1 family rm. 2nd fl: remodel kitchen & bathroom. 3rd fl: remodel bath & add 1 full bath.Details
1st fl: add 1 bedroom, 1 full bath & 1 family rm. 2nd fl: remodel kitchen & bathroom. 3rd fl: remodel bath & add 1 full bath. | $100,000 |
| Mar 2, 2018 | Completed final sign-off Aug 2018 | 159 Granada Av | construct 1 family rm & 1 full bath at grnd flr. remodel (e) kitchen, 2 bathrm & convert (e) dining rm into bedroom at 2ndDetails
construct 1 family rm & 1 full bath at grnd flr. remodel (e) kitchen, 2 bathrm & convert (e) dining rm into bedroom at 2nd | $52,000 |
| Feb 9, 2018 | Completed final sign-off Aug 2018 | 680 Brunswick St | add two bedrooms, two full bath, relocate washer & dryer at first floor per plan.Details
add two bedrooms, two full bath, relocate washer & dryer at first floor per plan. | $35,000 |
| Sep 18, 2015 | Completed final sign-off Oct 2015 | 244 Guerrero St | unit #244: comply with nov complaints 201563721 & 201564381 dtd 8-14-15 ,use 5/8 type "x" sheet rock.Details
unit #244: comply with nov complaints 201563721 & 201564381 dtd 8-14-15 ,use 5/8 type "x" sheet rock. | $5,000 |
| May 14, 2012 | Completed final sign-off Aug 2012 | 69 Majestic Av | convert 2 closets into one bathroom. replace 2nd floor wall sheet high efficacy lighting.Details
convert 2 closets into one bathroom. replace 2nd floor wall sheet high efficacy lighting. | $3,000 |
| Apr 5, 2010 | Completed final sign-off Jun 2010 | 1022 Silliman St | kitchen & bathroom remodel, countertops, install 5 outlets and 2 switches, lights. repair sink.Details
kitchen & bathroom remodel, countertops, install 5 outlets and 2 switches, lights. repair sink. | $25,000 |
| Sep 14, 2009 | Completed final sign-off Dec 2009 | 1558 Stockton St | remodel kitchen, patching dry wall for upgrade electrical.Details
remodel kitchen, patching dry wall for upgrade electrical. | $15,000 |
| May 1, 2009 | Completed final sign-off Jul 2009 | 4050 Folsom St | remodel kitchen, including cabinets, electrical outlet and sinks.Details
remodel kitchen, including cabinets, electrical outlet and sinks. | $30,000 |