Libin Zhang
- Based in
- Millbrae
- On San Francisco permits
- Jun 2014 to Jun 2022
- Last 24 months
- 0 permits filed
19 permits since 2000: 15 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
4 roof deck permits: 3 completed, 1 never finaled. Typically 370 days from filing to permit and 619 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 27, 2022 | Completed final sign-off Aug 2025 | 2762 Filbert St | level out rearyard with basement level. interior remodel on all floors. unit 1 to be on basement and ground floor. unit 2 to be on 2nd and 3rd floor. new roof deck. no horizontal or vertical expansion. update facede design.Details
level out rearyard with basement level. interior remodel on all floors. unit 1 to be on basement and ground floor. unit 2 to be on 2nd and 3rd floor. new roof deck. no horizontal or vertical expansion. update facede design. | $1,500,000 |
| Dec 16, 2021 | Never finaled filed Dec 2021, never issued | 1883 Greenwich St | horizontal and vertical addition, add state adu to ground level, add garage, add roof deck, landscaping, relocate entry to laguna street.Details
horizontal and vertical addition, add state adu to ground level, add garage, add roof deck, landscaping, relocate entry to laguna street. | $500,000 |
| Jan 20, 2016 | Completed final sign-off Sep 2017 | 2028 Leavenworth St | revision to pa#201410148857, adjust roof deck location per neighbor request, reconfigure skylights, remove approved bath from 1/f & relocate to basement. roof deck to be 4'8" from front property line.Details
revision to pa#201410148857, adjust roof deck location per neighbor request, reconfigure skylights, remove approved bath from 1/f & relocate to basement. roof deck to be 4'8" from front property line. | |
| Oct 14, 2014 | Completed final sign-off Sep 2017 | 2028 Leavenworth St | lwr living area:reloc unit 1.create addtl sq ft fr garage area.infill litewell.1/flr:new layout,new wndws except frt facade.2/fl:new int layout,new wndws except frt facade,partially raise fl leve.general:new elevator, remove stairs on deck, new sprinkler sys.new roof deck,replace frt wndws in kindDetails
lwr living area:reloc unit 1.create addtl sq ft fr garage area.infill litewell.1/flr:new layout,new wndws except frt facade.2/fl:new int layout,new wndws except frt facade,partially raise fl leve.general:new elevator, remove stairs on deck, new sprinkler sys.new roof deck,replace frt wndws in kind | $250,000 |