Permit GraphShortlistSan Francisco building permits since 2000

Libin Zhang

Contractor license
987914
State license record
Based in
Millbrae
On San Francisco permits
Jun 2014 to Jun 2022
Last 24 months
0 permits filed

19 permits since 2000: 15 completed, 2 never finaled, 2 expired or cancelled.

Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is over 10 years old. 1 was filed but never issued.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllRoof deck 4Deck 1Stairs 2Kitchen remodel 2Bathroom remodel 4

4 bathroom remodel permits: 3 completed, 1 expired or cancelled. Typically 36 days from filing to permit and 549 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jul 19, 2021Completed
final sign-off Jan 2023
3937 Sacramento Stremodel of kitchen, bathrooms, painting and flooring. remodel in-kind. comply with cec 150.0(k)3 and 150.0(k)5
Details
Permit
202107194651
Status
complete
Filed
Jul 19, 2021
Permit issued
Jul 19, 2021
Final sign-off
Jan 19, 2023
Declared cost
$35,000
Address
3937 Sacramento St

remodel of kitchen, bathrooms, painting and flooring. remodel in-kind. comply with cec 150.0(k)3 and 150.0(k)5

Open the permit page

$35,000
Dec 21, 2016Completed
final sign-off Feb 2019
772 04th Avadd unit per ordinance no. 162-16. convert a detach garage into a unit. add shower, bathroom & kitchen in the unit, apply insulations. new opening for slinding door. drywall to all ceiling & walls . new light fixtures, flooring & painting. comply w/ nov #201612018
Details
Permit
201612215533
Status
complete
Filed
Dec 21, 2016
Permit issued
Dec 15, 2017
Final sign-off
Feb 27, 2019
Declared cost
$10,000
Address
772 04th Av

add unit per ordinance no. 162-16. convert a detach garage into a unit. add shower, bathroom & kitchen in the unit, apply insulations. new opening for slinding door. drywall to all ceiling & walls . new light fixtures, flooring & painting. comply w/ nov #201612018

Open the permit page

$10,000
Jan 20, 2016Completed
final sign-off Sep 2017
2028 Leavenworth Strevision to pa#201410148857, adjust roof deck location per neighbor request, reconfigure skylights, remove approved bath from 1/f & relocate to basement. roof deck to be 4'8" from front property line.
Details
Permit
201601207456
Status
complete
Filed
Jan 20, 2016
Permit issued
Feb 25, 2016
Final sign-off
Sep 25, 2017
Address
2028 Leavenworth St

revision to pa#201410148857, adjust roof deck location per neighbor request, reconfigure skylights, remove approved bath from 1/f & relocate to basement. roof deck to be 4'8" from front property line.

Open the permit page

Jun 19, 2014Expired or cancelled
withdrawn Mar 2018
770 04th Avrevision to 201308144354 s1 rearrangement of 2nd story interior. minor modifications to door and window sizes on all floors, addition of bathroom and skylights. all work in previously approved plans. replace windows in kind with wood windows.
Details
Permit
201406198903
Status
withdrawn
Filed
Jun 19, 2014
Declared cost
$50,000
Address
770 04th Av

revision to 201308144354 s1 rearrangement of 2nd story interior. minor modifications to door and window sizes on all floors, addition of bathroom and skylights. all work in previously approved plans. replace windows in kind with wood windows.

Open the permit page

$50,000