Liang General Construction Inc
- Based in
- Millbrae
- On San Francisco permits
- Dec 2009 to Jul 2026
- Last 24 months
- 17 permits filed
86 permits since 2000: 62 completed, 8 in progress, 11 never finaled, 5 expired or cancelled.
Of the 11 never-finaled permits, 2 are 3 to 5 years old, 7 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
11 stairs permits: 8 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 7 days from filing to permit and 126 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 21, 2026 | In progress issued Aug 2026 | 2510 Bryant St | fill (e) light well at 2nd floor at the entrance stair not viisble from street. remove full bathroom. revision to permit 202603036865.Details
fill (e) light well at 2nd floor at the entrance stair not viisble from street. remove full bathroom. revision to permit 202603036865. | $10,000 |
| May 11, 2023 | Completed final sign-off Jul 2023 | 1834 Eddy St | to comply with complain # 202304861. dry-rot repair on front stair.Details
to comply with complain # 202304861. dry-rot repair on front stair. | $3,000 |
| Mar 13, 2023 | Completed final sign-off Jul 2024 | 1654 Alabama St | upper level only: demo of some windows, floor partitions, bathroom, kitchen, and portion of (e) deck. new windows, new partition, bathroom remodel, new bathroom, kitchen remodel, legitimize (e) deck and remodel portions to meet planning code and relocation of deck stair. new electrical throughout.Details
upper level only: demo of some windows, floor partitions, bathroom, kitchen, and portion of (e) deck. new windows, new partition, bathroom remodel, new bathroom, kitchen remodel, legitimize (e) deck and remodel portions to meet planning code and relocation of deck stair. new electrical throughout. | $100,000 |
| Jan 31, 2022 | Never finaled issued Jan 2022, no final | 347 17th Av | replace dry rot on back building stair landing and rear roof overhang. all work in kind.Details
replace dry rot on back building stair landing and rear roof overhang. all work in kind. | $1,500 |
| Mar 26, 2021 | Completed final sign-off Apr 2023 | 2130 Rivera St | revision to no-plan pa# 201408153940. add (n) bedroom, family room & full bathroom. remodel (e) kitchen & remove (e) wall of kitchen. remove (e) stair to ground floor, add 1 full bath. infill (e) lightwell at front entrance.Details
revision to no-plan pa# 201408153940. add (n) bedroom, family room & full bathroom. remodel (e) kitchen & remove (e) wall of kitchen. remove (e) stair to ground floor, add 1 full bath. infill (e) lightwell at front entrance. | $80,000 |
| Feb 26, 2019 | Completed final sign-off Nov 2019 | 41 Cuvier St | interior remodel of 2 units incl new kitchens, remodel (e) baths, remove wall between living rooms & new kitchens, new elctr, mech & plumb, new windows at (e) openings. windows not visible from street. repair (e) deck & stairs in-kind total less than 50%Details
interior remodel of 2 units incl new kitchens, remodel (e) baths, remove wall between living rooms & new kitchens, new elctr, mech & plumb, new windows at (e) openings. windows not visible from street. repair (e) deck & stairs in-kind total less than 50% | $165,000 |
| Jun 7, 2018 | Expired or cancelled expired Feb 2025 | 525 42nd Av | provide spiral stair detail for 2nd floor to the ground floor rear yardDetails
provide spiral stair detail for 2nd floor to the ground floor rear yard | |
| May 18, 2017 | Completed final sign-off Dec 2017 | 3907 Balboa St | (e) unpermitted stair in rear yard to roof to be removed. guardrail at roof to be removed. new parapet infill. door to roof to be replaced w/window. (to be wood)Details
(e) unpermitted stair in rear yard to roof to be removed. guardrail at roof to be removed. new parapet infill. door to roof to be replaced w/window. (to be wood) | $3,000 |
| Jun 8, 2016 | Completed final sign-off Nov 2016 | 1325 30th Av | per correction notice dated 5/26/16. revision permit to repair side stairs. install fire rated hats or boxes over cans at top floor with 5' of p/l. estimated cost of $30,000Details
per correction notice dated 5/26/16. revision permit to repair side stairs. install fire rated hats or boxes over cans at top floor with 5' of p/l. estimated cost of $30,000 | $1,000 |
| Feb 19, 2013 | Completed final sign-off May 2013 | 2095 20th Av | repair e front entry stair and apply stucco finish to e brick wallDetails
repair e front entry stair and apply stucco finish to e brick wall | $7,000 |
| Feb 8, 2010 | Completed final sign-off May 2010 | 119 Huntington Dr | legalize (e) home office & construct (n) family rm. all work at ground floor. construct (n) staircase. connect to (e) deck at rear of house.Details
legalize (e) home office & construct (n) family rm. all work at ground floor. construct (n) staircase. connect to (e) deck at rear of house. | $16,000 |