Level 10 Construction Lp
- Based in
- Sunnyvale
- On San Francisco permits
- Apr 2012 to Dec 2025
- Last 24 months
- 4 permits filed
245 permits since 2000: 206 completed, 4 in progress, 13 never finaled, 22 expired or cancelled.
Of the 13 never-finaled permits, 1 is 3 to 5 years old, 11 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
26 stairs permits: 25 completed, 1 expired or cancelled. Typically 45 days from filing to permit and 1087 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 8, 2022 | Completed final sign-off Mar 2023 | 1 Beach St | revision to pa# 202011128788. incorporate structural field changes including expansion of ground floor slab replacement in stairway between lines 3 to 4 and removal of structural styrofoam in topping slab. add grade bm.Details
revision to pa# 202011128788. incorporate structural field changes including expansion of ground floor slab replacement in stairway between lines 3 to 4 and removal of structural styrofoam in topping slab. add grade bm. | |
| Oct 14, 2021 | Completed final sign-off Mar 2023 | 1 Beach St | revision to 2020 1217 1243 including abandannont of previously proposed infull new stair and accociated mepDetails
revision to 2020 1217 1243 including abandannont of previously proposed infull new stair and accociated mep | |
| Dec 17, 2020 | Completed final sign-off Mar 2023 | 1 Beach St | interior core & shell improvements. remodel grnd flr main lobby, (n) cut-out. infill of 2nd flr openings. cosmetic upgrade of (e) egress stairs, (n) restrooms on level 01-03. no change of use; no new office useDetails
interior core & shell improvements. remodel grnd flr main lobby, (n) cut-out. infill of 2nd flr openings. cosmetic upgrade of (e) egress stairs, (n) restrooms on level 01-03. no change of use; no new office use | $300,000 |
| Sep 23, 2019 | Completed final sign-off Mar 2023 | 1 Beach St | remodel of interior ground floor entrance lobby to 2 floor hgh space & addition of new roof deck. extension of elevator stop to roof & extension of stair to roof. seismic upgrade. ** maher: n/a **Details
remodel of interior ground floor entrance lobby to 2 floor hgh space & addition of new roof deck. extension of elevator stop to roof & extension of stair to roof. seismic upgrade. ** maher: n/a ** | $1,200,000 |
| Sep 19, 2019 | Completed final sign-off Sep 2021 | 1 Market St | new interconnecting convenience stair connecting floors 6 with floor 9. demo of (e) slabs to create (n) opening. (n) steel for stair, architectural stair includes guard and handrail details. also includes (n) rated enclosure on 2 floors around stair and lightingDetails
new interconnecting convenience stair connecting floors 6 with floor 9. demo of (e) slabs to create (n) opening. (n) steel for stair, architectural stair includes guard and handrail details. also includes (n) rated enclosure on 2 floors around stair and lighting | $750,000 |
| Oct 2, 2018 | Completed final sign-off May 2021 | 181 Fremont St | 20th fl: construction of new non structural partitions, acoustical grid and tile & 649, board ceilings, millwork, finishes, mech, elec, and plumbing. conv. stairs, fire alarm, sprinklers, under seperate permitDetails
20th fl: construction of new non structural partitions, acoustical grid and tile & 649, board ceilings, millwork, finishes, mech, elec, and plumbing. conv. stairs, fire alarm, sprinklers, under seperate permit | $1,365,000 |
| Oct 1, 2018 | Completed final sign-off May 2021 | 181 Fremont St | 19th fl: construction of new non-structural partitions, acoustical grid & tile & gyp board ceilings, light fixtures, millwork, finishes, mechanical work, electrical, plumbing. connecting stairs, fire alarm, sprinklers under sep permit. maher naDetails
19th fl: construction of new non-structural partitions, acoustical grid & tile & gyp board ceilings, light fixtures, millwork, finishes, mechanical work, electrical, plumbing. connecting stairs, fire alarm, sprinklers under sep permit. maher na | $1,365,000 |
| Oct 1, 2018 | Completed final sign-off May 2021 | 181 Fremont St | 21st fl: construction of non-structural partitions, acoustical grid & tile & gyp. board ceilings, millwork, finishes, mech, electrical & plumbing. connecting stairs, fire alarm, sprinklers under sep permit. maher naDetails
21st fl: construction of non-structural partitions, acoustical grid & tile & gyp. board ceilings, millwork, finishes, mech, electrical & plumbing. connecting stairs, fire alarm, sprinklers under sep permit. maher na | $1,365,000 |
| Sep 17, 2018 | Completed final sign-off May 2021 | 181 Fremont St | 16th floor - construction of new non-structural partitions, acoustical grid & tile and gyp board ceilings, light fixtures, millwork and finishes. mep included - sprinklers & f/a under separate permit. convenience stair under separate permitDetails
16th floor - construction of new non-structural partitions, acoustical grid & tile and gyp board ceilings, light fixtures, millwork and finishes. mep included - sprinklers & f/a under separate permit. convenience stair under separate permit | $1,365,000 |
| May 23, 2018 | Completed final sign-off May 2021 | 181 Fremont St | convenience stairs connecting levels 19 - 21 n/a for maherDetails
convenience stairs connecting levels 19 - 21 n/a for maher | $250,000 |
| May 23, 2018 | Completed final sign-off May 2021 | 181 Fremont St | convenience stairs connecting levels 16 - 18. n/a for maherDetails
convenience stairs connecting levels 16 - 18. n/a for maher | $250,000 |
| May 7, 2018 | Completed final sign-off Jun 2021 | 181 Fremont St | installation of 4 levels of convenience stairs floor 35 thru 38. two hour enclosure at level 35Details
installation of 4 levels of convenience stairs floor 35 thru 38. two hour enclosure at level 35 | $3,788,000 |
| Apr 19, 2018 | Completed final sign-off May 2021 | 181 Fremont St | installation of convincence stairs from level 13 to level 15Details
installation of convincence stairs from level 13 to level 15 | $475,000 |
| Apr 16, 2018 | Completed final sign-off May 2021 | 181 Fremont St | ti revision to pa 2017-1201-5329 updated smoke control enlarged pre app meeting minutes, updated green bldg checklist, move drinking fountains, revised minor changes in room layout, add 2 hour rated enclosure in stair vestibule, approve assembly occupancy loadDetails
ti revision to pa 2017-1201-5329 updated smoke control enlarged pre app meeting minutes, updated green bldg checklist, move drinking fountains, revised minor changes in room layout, add 2 hour rated enclosure in stair vestibule, approve assembly occupancy load | $10,000 |
| Mar 26, 2018 | Completed final sign-off May 2021 | 181 Fremont St | new 4 level convenience stair from 5th-8th floor. t.i. work under separate permits. n/a for maherDetails
new 4 level convenience stair from 5th-8th floor. t.i. work under separate permits. n/a for maher | $200,000 |
| Mar 14, 2018 | Completed final sign-off May 2021 | 181 Fremont St | stairs interconnecting levels 9-12Details
stairs interconnecting levels 9-12 | $200,000 |
| Feb 13, 2018 | Completed final sign-off May 2021 | 181 Fremont St | construction of convience stairs for levels 22-24; n/a maherDetails
construction of convience stairs for levels 22-24; n/a maher | $40,000 |
| Feb 13, 2018 | Completed final sign-off Jun 2021 | 181 Fremont St | construction of convience stairs for levels 32-34; n/a maherDetails
construction of convience stairs for levels 32-34; n/a maher | $40,000 |
| Jan 31, 2018 | Completed final sign-off May 2021 | 181 Fremont St | 30th floor: full floor tenent with non-structural partitions, new ceilings, millwork, finishes. convenience stairs, fire alarm sprinklers on separate permit. n/a for maherDetails
30th floor: full floor tenent with non-structural partitions, new ceilings, millwork, finishes. convenience stairs, fire alarm sprinklers on separate permit. n/a for maher | $3,100,000 |
| Jan 31, 2018 | Completed final sign-off May 2021 | 181 Fremont St | 29th floor: full floor tenent with non-structural partitions, new ceilings, millwork, finishes. convenience stairs, fire alarm sprinklers on separate permit. n/a for maherDetails
29th floor: full floor tenent with non-structural partitions, new ceilings, millwork, finishes. convenience stairs, fire alarm sprinklers on separate permit. n/a for maher | $2,700,000 |
| Jan 31, 2018 | Completed final sign-off May 2021 | 181 Fremont St | 31st floor: full floor tenent with non-structural partitions, new ceilings, millwork, finishes. convenience stairs, fire alarm sprinklers on separate permit. n/a for maherDetails
31st floor: full floor tenent with non-structural partitions, new ceilings, millwork, finishes. convenience stairs, fire alarm sprinklers on separate permit. n/a for maher | $2,800,000 |
| Dec 28, 2017 | Completed final sign-off May 2021 | 181 Fremont St | 29th & 30th & 31st flrs.- new 3 level convinience stairs. maher naDetails
29th & 30th & 31st flrs.- new 3 level convinience stairs. maher na | $150,000 |
| Dec 6, 2017 | Completed final sign-off May 2021 | 181 Fremont St | 4th flr: ti- construction of 705 sq office space - new non structural partitions. light fixtures and finishes, no change in exit stairs, egress path, elevator, restrooms & showers. construction of grease interceptor rooms & security control room.Details
4th flr: ti- construction of 705 sq office space - new non structural partitions. light fixtures and finishes, no change in exit stairs, egress path, elevator, restrooms & showers. construction of grease interceptor rooms & security control room. | $100,000 |
| Nov 7, 2017 | Completed final sign-off May 2021 | 181 Fremont St | 25th floor - construction of non-structural partitions, ceiling,light fixtures, finishes. construction of new convinence stairs from 25th to 26th floor. construction of new ktichen & servery. n/a maher ordinanceDetails
25th floor - construction of non-structural partitions, ceiling,light fixtures, finishes. construction of new convinence stairs from 25th to 26th floor. construction of new ktichen & servery. n/a maher ordinance | $2,100,000 |
| Oct 10, 2017 | Completed final sign-off May 2021 | 181 Fremont St | convenience stair installation between floor 26 to 28. maher naDetails
convenience stair installation between floor 26 to 28. maher na | $435,000 |
| Mar 16, 2016 | Expired or cancelled expired Jan 2021 | 2901 Broadway | new interior stair (steel construction) deferred submittal for bpa# 2014-0701-0243 & bpa# 2013-0610-9080. structural only.n/a for maherDetails
new interior stair (steel construction) deferred submittal for bpa# 2014-0701-0243 & bpa# 2013-0610-9080. structural only.n/a for maher | $450,000 |