Back to kitchen remodel contractors
Leonard Schendel Const.Co
- Based in
- San Mateo
- On San Francisco permits
- Feb 2010 to Aug 2026
- Last 24 months
- 7 permits filed
10 permits since 2000: 3 completed, 7 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 1 completed, 2 in progress. Typically 150 days from filing to permit and 511 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 14, 2026 | In progress issued May 2026 | 350 Kansas St | interior soft demolition on first floor per plan. removal of (e) non-structural partitions and kitchen equipment and plumbing. no exterior changes.Details
interior soft demolition on first floor per plan. removal of (e) non-structural partitions and kitchen equipment and plumbing. no exterior changes. | $2,500 |
| Jan 9, 2026 | In progress issued Jun 2026 | 350 Kansas St | change of occupancy from a-2, m, b, s-1 to only b (tile showroom). tenant improvement permit of (e) two buildings on one lot for a (n) tile showroom as one building. scope of work includes demolition of existing kitchens, restrooms, per plans. new tile display area raised partial floor...Details
change of occupancy from a-2, m, b, s-1 to only b (tile showroom). tenant improvement permit of (e) two buildings on one lot for a (n) tile showroom as one building. scope of work includes demolition of existing kitchens, restrooms, per plans. new tile display area raised partial floor... | $1,500,000 |
| Feb 8, 2010 | Completed final sign-off Dec 2011 | 607 02nd Av | comply w/nov# 200927862.renovate(e)2 stories over garage.each a sep unit.reconf kitchen,bath&living/storage space.at lower unit,add a add'l fl area&deck w/stair to grade.at upper unit,add add'l level w/int stair.new bedrm,bath,living&storage areas to top fl.add sprk sys to whl bldg under sep appl.Details
comply w/nov# 200927862.renovate(e)2 stories over garage.each a sep unit.reconf kitchen,bath&living/storage space.at lower unit,add a add'l fl area&deck w/stair to grade.at upper unit,add add'l level w/int stair.new bedrm,bath,living&storage areas to top fl.add sprk sys to whl bldg under sep appl. | $110,000 |