Back to kitchen remodel contractors
Lema Construction
- Based in
- San Leandro
- On San Francisco permits
- Dec 2009 to Mar 2026
- Last 24 months
- 1 permit filed
30 permits since 2000: 27 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 10 completed, 1 never finaled. Typically 2 days from filing to permit and 158 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 13, 2023 | Never finaled issued Feb 2023, no final | 1155 Indiana St | 15 tubbs - t.i. to an extg breakroom and storage space, inside a warehouse to include:new kitchen cabinet fixtures and appliance, new interior floor,wall and ceiling finishes, including new led lighting and new relocated outlets.Details
15 tubbs - t.i. to an extg breakroom and storage space, inside a warehouse to include:new kitchen cabinet fixtures and appliance, new interior floor,wall and ceiling finishes, including new led lighting and new relocated outlets. | $20,000 |
| Jul 23, 2018 | Completed final sign-off Jan 2019 | 465 10th St | residential remodel-interior work including minor bath remodel, lighting, flooring, hvac replacement, minor kitchen remodel. no change in # of units. all work subject to interior improvement onlyDetails
residential remodel-interior work including minor bath remodel, lighting, flooring, hvac replacement, minor kitchen remodel. no change in # of units. all work subject to interior improvement only | $14,000 |
| Feb 2, 2017 | Completed final sign-off Jun 2017 | 1940 Sacramento St | revision to pa# 201611223333. switch unit from 1 to 6. upgrade electrical installation throughout unit, replace light fixtures w/led. dining room, remove closets on western wall, remove swinging door to kitchen, relocate atrium door to west wall, build opening to kitchen, full bath, vanity counterDetails
revision to pa# 201611223333. switch unit from 1 to 6. upgrade electrical installation throughout unit, replace light fixtures w/led. dining room, remove closets on western wall, remove swinging door to kitchen, relocate atrium door to west wall, build opening to kitchen, full bath, vanity counter | |
| Nov 22, 2016 | Completed final sign-off Jun 2017 | 1940 Sacramento St | #1 upgrade elec installation throughout unit, lighting fixtures w led. din rm remove closets on western wall, rmv swinging door to kitchen, relocate atrium door to west wall.opening to kitchen, full bath:vanity cntr w sink,remove tuv, master clst into shwr.atrium clst into bedrm access,remove accessDetails
#1 upgrade elec installation throughout unit, lighting fixtures w led. din rm remove closets on western wall, rmv swinging door to kitchen, relocate atrium door to west wall.opening to kitchen, full bath:vanity cntr w sink,remove tuv, master clst into shwr.atrium clst into bedrm access,remove access | $38,000 |
| Jul 13, 2016 | Completed final sign-off Dec 2016 | 575 Teresita Bl | remodel 2 (e) bathroom (1st and 2nd floor) and one kitchen on the 2nd floor. remove and replace (e) plumbing fixtures and cabinets. perform required plumbing and electrical upgrades to code. demolish 1 door and non-structural wall.Details
remodel 2 (e) bathroom (1st and 2nd floor) and one kitchen on the 2nd floor. remove and replace (e) plumbing fixtures and cabinets. perform required plumbing and electrical upgrades to code. demolish 1 door and non-structural wall. | $28,000 |
| Mar 14, 2016 | Completed final sign-off Jul 2016 | 191 Kenwood Wy | kitchen remodel. new cabinetry ,hardwood flooring,appliances, plumb/elec upgrades. remaining non structural wall between kitchen and breakfast nook. replacing 2 windows same size and same locationDetails
kitchen remodel. new cabinetry ,hardwood flooring,appliances, plumb/elec upgrades. remaining non structural wall between kitchen and breakfast nook. replacing 2 windows same size and same location | $25,000 |
| May 7, 2015 | Completed final sign-off Nov 2015 | 46 Orben Pl | upper level unit 3: relocate bathroom from rear to front swing room, convert bathroom to closet at rear, remodel kitchen including replacing cabinets & appliances.Details
upper level unit 3: relocate bathroom from rear to front swing room, convert bathroom to closet at rear, remodel kitchen including replacing cabinets & appliances. | $36,000 |
| Sep 8, 2014 | Completed final sign-off Apr 2015 | 194 Laidley St | revision to pa #2014.08.25.4619: re-route gas line to (n) range, re-route gas line to fireplace & capped, (n) post added below (e) beam, (n) water line for refrigerator, (n) hot/cold water connections & elect outlet, (n) outlet,(n) exhaust fan/heater combo for bathroom, (n) wall extending kitchen.Details
revision to pa #2014.08.25.4619: re-route gas line to (n) range, re-route gas line to fireplace & capped, (n) post added below (e) beam, (n) water line for refrigerator, (n) hot/cold water connections & elect outlet, (n) outlet,(n) exhaust fan/heater combo for bathroom, (n) wall extending kitchen. | $3,000 |
| Aug 25, 2014 | Completed final sign-off Apr 2015 | 194 Laidley St | replace/reinforce subfloor & floor joists, re-route gas line to fireplace & cap for future insert, remove shelving, heater, wall to center fireplace, wall bet kitchen & living rm, cabients & fixtures,gas range. re-route gas line to new range location, install wood flooring, upgrade elect panel,patchDetails
replace/reinforce subfloor & floor joists, re-route gas line to fireplace & cap for future insert, remove shelving, heater, wall to center fireplace, wall bet kitchen & living rm, cabients & fixtures,gas range. re-route gas line to new range location, install wood flooring, upgrade elect panel,patch | $10,000 |
| Apr 4, 2014 | Completed final sign-off Jul 2014 | 4021 19th St | remodel bathroom, build arch @ kitchen to family room hall.Details
remodel bathroom, build arch @ kitchen to family room hall. | $9,500 |
| Feb 9, 2012 | Completed final sign-off May 2012 | 1865 California St | kitchen remodel: replace cabinets & counters, update lighting to title 14, all fixtures and appliances to remain at the existing location, no structural changes & no wall relocation. a minimum of 50% of the total rated wattage of permanently installed lighting shall be high efficacy - cec 150(k)8.Details
kitchen remodel: replace cabinets & counters, update lighting to title 14, all fixtures and appliances to remain at the existing location, no structural changes & no wall relocation. a minimum of 50% of the total rated wattage of permanently installed lighting shall be high efficacy - cec 150(k)8. | $21,000 |