Back to bathroom remodel contractors
Lema Construction
- Based in
- San Leandro
- On San Francisco permits
- Dec 2009 to Mar 2026
- Last 24 months
- 1 permit filed
30 permits since 2000: 27 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 13 completed. Typically 5 days from filing to permit and 175 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 21, 2024 | Completed final sign-off Feb 2026 | 21 Collins St | convert existing storage space 303 sq ft in garage to office space. add a full bath. add new windows, sliding doors and landing in the rearDetails
convert existing storage space 303 sq ft in garage to office space. add a full bath. add new windows, sliding doors and landing in the rear | $50,000 |
| Nov 2, 2022 | Completed final sign-off Oct 2024 | 690 Spruce St | unit 102 - bathroom remodel with new shower on 2/f.Details
unit 102 - bathroom remodel with new shower on 2/f. | $8,000 |
| Jul 23, 2018 | Completed final sign-off Jan 2019 | 465 10th St | residential remodel-interior work including minor bath remodel, lighting, flooring, hvac replacement, minor kitchen remodel. no change in # of units. all work subject to interior improvement onlyDetails
residential remodel-interior work including minor bath remodel, lighting, flooring, hvac replacement, minor kitchen remodel. no change in # of units. all work subject to interior improvement only | $14,000 |
| Feb 2, 2017 | Completed final sign-off Jun 2017 | 1940 Sacramento St | revision to pa# 201611223333. switch unit from 1 to 6. upgrade electrical installation throughout unit, replace light fixtures w/led. dining room, remove closets on western wall, remove swinging door to kitchen, relocate atrium door to west wall, build opening to kitchen, full bath, vanity counterDetails
revision to pa# 201611223333. switch unit from 1 to 6. upgrade electrical installation throughout unit, replace light fixtures w/led. dining room, remove closets on western wall, remove swinging door to kitchen, relocate atrium door to west wall, build opening to kitchen, full bath, vanity counter | |
| Nov 22, 2016 | Completed final sign-off Jun 2017 | 1940 Sacramento St | #1 upgrade elec installation throughout unit, lighting fixtures w led. din rm remove closets on western wall, rmv swinging door to kitchen, relocate atrium door to west wall.opening to kitchen, full bath:vanity cntr w sink,remove tuv, master clst into shwr.atrium clst into bedrm access,remove accessDetails
#1 upgrade elec installation throughout unit, lighting fixtures w led. din rm remove closets on western wall, rmv swinging door to kitchen, relocate atrium door to west wall.opening to kitchen, full bath:vanity cntr w sink,remove tuv, master clst into shwr.atrium clst into bedrm access,remove access | $38,000 |
| Jul 13, 2016 | Completed final sign-off Dec 2016 | 575 Teresita Bl | remodel 2 (e) bathroom (1st and 2nd floor) and one kitchen on the 2nd floor. remove and replace (e) plumbing fixtures and cabinets. perform required plumbing and electrical upgrades to code. demolish 1 door and non-structural wall.Details
remodel 2 (e) bathroom (1st and 2nd floor) and one kitchen on the 2nd floor. remove and replace (e) plumbing fixtures and cabinets. perform required plumbing and electrical upgrades to code. demolish 1 door and non-structural wall. | $28,000 |
| Jul 30, 2015 | Completed final sign-off Feb 2016 | 784 Wisconsin St | front bldg: master and guest bath remodel. master: replace floor tile, replace tub with walk in shower, replace plmg fixtures and sinks, replace wall sconces, replace patio door. guest: replace floor tile, replace shower pan with walk in shower, replace plmg fixture and sink, replace sconce.Details
front bldg: master and guest bath remodel. master: replace floor tile, replace tub with walk in shower, replace plmg fixtures and sinks, replace wall sconces, replace patio door. guest: replace floor tile, replace shower pan with walk in shower, replace plmg fixture and sink, replace sconce. | $45,000 |
| May 7, 2015 | Completed final sign-off Nov 2015 | 46 Orben Pl | upper level unit 3: relocate bathroom from rear to front swing room, convert bathroom to closet at rear, remodel kitchen including replacing cabinets & appliances.Details
upper level unit 3: relocate bathroom from rear to front swing room, convert bathroom to closet at rear, remodel kitchen including replacing cabinets & appliances. | $36,000 |
| Sep 8, 2014 | Completed final sign-off Apr 2015 | 194 Laidley St | revision to pa #2014.08.25.4619: re-route gas line to (n) range, re-route gas line to fireplace & capped, (n) post added below (e) beam, (n) water line for refrigerator, (n) hot/cold water connections & elect outlet, (n) outlet,(n) exhaust fan/heater combo for bathroom, (n) wall extending kitchen.Details
revision to pa #2014.08.25.4619: re-route gas line to (n) range, re-route gas line to fireplace & capped, (n) post added below (e) beam, (n) water line for refrigerator, (n) hot/cold water connections & elect outlet, (n) outlet,(n) exhaust fan/heater combo for bathroom, (n) wall extending kitchen. | $3,000 |
| Apr 4, 2014 | Completed final sign-off Jul 2014 | 4021 19th St | remodel bathroom, build arch @ kitchen to family room hall.Details
remodel bathroom, build arch @ kitchen to family room hall. | $9,500 |
| Aug 23, 2013 | Completed final sign-off Nov 2013 | 175 Noe St | add bathroom in existing hallway alcove/closet; replace old window with new (same), not street facingDetails
add bathroom in existing hallway alcove/closet; replace old window with new (same), not street facing | $20,000 |
| Nov 23, 2011 | Completed final sign-off Dec 2011 | 238 Grand View Av | demo & replace floor and walls thiel. fill one door with wood burning, dry wall. repair light add 1 outlet, remove junction box. job involves removal and reinstall toilet, sink for 1 bathroom.Details
demo & replace floor and walls thiel. fill one door with wood burning, dry wall. repair light add 1 outlet, remove junction box. job involves removal and reinstall toilet, sink for 1 bathroom. | $5,000 |
| Jun 28, 2011 | Completed final sign-off Jun 2012 | 173 Noe St | add bathroom and property lined window per planDetails
add bathroom and property lined window per plan | $50,000 |