Block 4097, lot 054
784 Wisconsin St
- City’s use
- Single Family Residential
- Built
- 1991
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 1,782 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 21, 2021 | Completed final sign-off Mar 2021 | 784 Wisconsin St | Mr. Roofing, Inc. | re-roofing.Details
re-roofing. | $16,000 |
| Nov 19, 2015 | Completed final sign-off Feb 2016 | 784 Wisconsin St | Lema Construction | cedar siding over existing siding on surrounding patio walls. non structural work only.Details
cedar siding over existing siding on surrounding patio walls. non structural work only. | $1,500 |
| Sep 16, 2015 | Completed final sign-off Feb 2016 | 784 Wisconsin St | Lema Construction | revision to pa 2015 0730 2959: replacing window not visible, adding til, drain, glass railing and bench to (e) patio - not visible from streetDetails
revision to pa 2015 0730 2959: replacing window not visible, adding til, drain, glass railing and bench to (e) patio - not visible from street | $3,000 |
| Jul 30, 2015 | Completed final sign-off Feb 2016 | 784 Wisconsin St | Lema Construction | front bldg: master and guest bath remodel. master: replace floor tile, replace tub with walk in shower, replace plmg fixtures and sinks, replace wall sconces, replace patio door. guest: replace floor tile, replace shower pan with walk in shower, replace plmg fixture and sink, replace sconce.Details
front bldg: master and guest bath remodel. master: replace floor tile, replace tub with walk in shower, replace plmg fixtures and sinks, replace wall sconces, replace patio door. guest: replace floor tile, replace shower pan with walk in shower, replace plmg fixture and sink, replace sconce. | $45,000 |
| Jul 14, 2008 | Completed final sign-off Dec 2008 | 784 Wisconsin St | Branko Kruslin Painting | install sheetrock over exposed lumber in ceiling in level 3 master bedroom, level 2 living area. 3rd fl remove walk in closet in master bedroom, replace with closet cabinets. 2nd fl, open walls at pantry around kit entrance,replace cabinets. install recessed lighing on 2nd fl and clg fan on 3rd fl.Details
install sheetrock over exposed lumber in ceiling in level 3 master bedroom, level 2 living area. 3rd fl remove walk in closet in master bedroom, replace with closet cabinets. 2nd fl, open walls at pantry around kit entrance,replace cabinets. install recessed lighing on 2nd fl and clg fan on 3rd fl. | $17,800 |
| Mar 22, 2000 | Expired or cancelled expired Jul 2000 | 784 Wisconsin St | reroofingDetails
reroofing |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.