Back to kitchen remodel contractors
Lei's Construction Company
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Aug 2026
- Last 24 months
- 8 permits filed
372 permits since 2000: 310 completed, 4 in progress, 42 never finaled, 16 expired or cancelled.
Of the 42 never-finaled permits, 3 are 5 to 10 years old, 39 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
125 kitchen remodel permits: 110 completed, 13 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 106 days from permit to final inspection.
Showing the 100 most recent of 125.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 31, 2025 | Completed final sign-off Jun 2025 | 22 Madison St | 1/f: convert (e) 120 sf storage to bedroom and convert family room to kitchenette per plan.Details
1/f: convert (e) 120 sf storage to bedroom and convert family room to kitchenette per plan. | $15,000 |
| Sep 5, 2024 | Completed final sign-off May 2025 | 2300 28th Av | 2/f: convert (2) e tubs to shower with showr pan in-kind in same location. 2/f: refinish kitchen, 3/f convert tub to showr in same location.Details
2/f: convert (2) e tubs to shower with showr pan in-kind in same location. 2/f: refinish kitchen, 3/f convert tub to showr in same location. | $25,000 |
| Dec 20, 2019 | Completed final sign-off Jan 2021 | 2267 42nd Av | add a full bathroom, relocate bedroom and full bathroom, remodel kitchen on 2nd fl. add a bedroom, full bathroom, enlarge foyer area on the 1st fl. replace water heater with tankless type.Details
add a full bathroom, relocate bedroom and full bathroom, remodel kitchen on 2nd fl. add a bedroom, full bathroom, enlarge foyer area on the 1st fl. replace water heater with tankless type. | $70,000 |
| Sep 5, 2019 | Completed final sign-off Feb 2021 | 145 Manor Dr | 1st flr - convert partial family rm to bedrm add one bedrm 2 & 1/2 bath. 2nd flr - relocated front entry, kitchen, dining, bedroom, 2 bath & interior stair. replaced window at front and add windows per plan. all windows to be aluminum wood clad.Details
1st flr - convert partial family rm to bedrm add one bedrm 2 & 1/2 bath. 2nd flr - relocated front entry, kitchen, dining, bedroom, 2 bath & interior stair. replaced window at front and add windows per plan. all windows to be aluminum wood clad. | $87,600 |
| Aug 27, 2019 | Completed final sign-off May 2020 | 1727 18th Av | remodel existing kitchen and two existing bathroom @ 2nd floor. remove and replace existing plaster and replace with new 5/8" type x gyp.Details
remodel existing kitchen and two existing bathroom @ 2nd floor. remove and replace existing plaster and replace with new 5/8" type x gyp. | $30,000 |
| Apr 30, 2019 | Completed final sign-off Aug 2019 | 2201 29th Av | remodel (e) kitchen and two (e) bathroms at 2nd floorDetails
remodel (e) kitchen and two (e) bathroms at 2nd floor | $18,000 |
| Feb 26, 2019 | Completed final sign-off Jul 2019 | 764 Rolph St | remodel (e) bathroom & kitchen and replace (e) pilaster walls w/ 5/8" gyp. bd w/ insulation of 2nd flr.Details
remodel (e) bathroom & kitchen and replace (e) pilaster walls w/ 5/8" gyp. bd w/ insulation of 2nd flr. | $48,000 |
| Sep 18, 2018 | Completed final sign-off Apr 2019 | 2527 39th Av | 1st floor: add 2 bedrooms, 2.5 baths and media room with wetbar. 2nd floor: relocate kitchen, add 1.5 baths, remodel 1 bath, new laundry. new deck at rear. new rear windows and sliding doors. - new stucco at the front. foundation repair(minor)Details
1st floor: add 2 bedrooms, 2.5 baths and media room with wetbar. 2nd floor: relocate kitchen, add 1.5 baths, remodel 1 bath, new laundry. new deck at rear. new rear windows and sliding doors. - new stucco at the front. foundation repair(minor) | $100,000 |
| Aug 13, 2018 | Completed final sign-off Jan 2019 | 35 Gabilan Wy | remodel (e) kitchen & two (e) bathrooms at upper floor, upgrade electrical system.Details
remodel (e) kitchen & two (e) bathrooms at upper floor, upgrade electrical system. | $20,000 |
| Aug 8, 2018 | Completed final sign-off Dec 2018 | 555 Campbell Av | rmodel (e) kitchen and two (e) bathrooms at 2nd floor, replace (e) plaster wall finish to 5/8" gyp board.Details
rmodel (e) kitchen and two (e) bathrooms at 2nd floor, replace (e) plaster wall finish to 5/8" gyp board. | $30,000 |
| Jul 12, 2018 | Completed final sign-off Sep 2018 | 441 09th Av | kitchen & bathroom remodelDetails
kitchen & bathroom remodel | $27,000 |
| Jun 21, 2018 | Completed final sign-off Mar 2019 | 242 Minerva St | 2nd fl - add 1 (n) bathroom, remodel 1 (e) bathroom & (e) kitchen; 1st fl - add 2(n) bathrooms, 2(n) bedrooms, 1 (n) home theater; exterior - replace 4 vinyl windows & 3 patio doors to (e) openings @ rear in-kind. build new deck & stair @ rear yardDetails
2nd fl - add 1 (n) bathroom, remodel 1 (e) bathroom & (e) kitchen; 1st fl - add 2(n) bathrooms, 2(n) bedrooms, 1 (n) home theater; exterior - replace 4 vinyl windows & 3 patio doors to (e) openings @ rear in-kind. build new deck & stair @ rear yard | $85,000 |
| Jun 20, 2018 | Completed final sign-off Aug 2018 | 74 Williams Av | remodel existing kitchen and replace cabinetsDetails
remodel existing kitchen and replace cabinets | $11,000 |
| May 17, 2018 | Completed final sign-off Jun 2019 | 147 Maynard St | remodel two bathrooms & one kitchen.Details
remodel two bathrooms & one kitchen. | $38,000 |
| Mar 13, 2018 | Completed final sign-off May 2018 | 169 Paris St | remodel (e) kitchen & 2 (e) bathrooms at 2nd floor.Details
remodel (e) kitchen & 2 (e) bathrooms at 2nd floor. | $30,000 |
| Jan 19, 2018 | Completed final sign-off May 2018 | 337 Bridgeview Dr | relocate kitchen, remodel (e) bathroom. construct 1 (n) bathroom & convert (e) kitchen space to bed room @ 2nd floor. construct new deck with staircase at rear of building (17'x8')Details
relocate kitchen, remodel (e) bathroom. construct 1 (n) bathroom & convert (e) kitchen space to bed room @ 2nd floor. construct new deck with staircase at rear of building (17'x8') | $50,000 |
| Jan 4, 2018 | Never finaled issued Jan 2018, no final | 244 Granada Av | remodel existing kitchen @ 2nd floorDetails
remodel existing kitchen @ 2nd floor | $12,000 |
| Dec 22, 2017 | Completed final sign-off Feb 2018 | 1338 25th Av | to comply with complaint 201723941 & 201723943: remodel kitchen & sink; remodel 2 bathrrooms, replace tub, toiklet, vanity, floor tiles & wall tiles.Details
to comply with complaint 201723941 & 201723943: remodel kitchen & sink; remodel 2 bathrrooms, replace tub, toiklet, vanity, floor tiles & wall tiles. | $35,000 |
| Dec 21, 2017 | Completed final sign-off Apr 2018 | 1455 Oakdale Av | remodel (e) kitchen & replace (e) rear windows at 2nd fl.Details
remodel (e) kitchen & replace (e) rear windows at 2nd fl. | $15,000 |
| Jul 21, 2017 | Completed final sign-off Nov 2017 | 367 Bright St | remodel on second floor. relocate exist. kitchen to front portion of house, remodel existing bathroom. non-struct. alteration.Details
remodel on second floor. relocate exist. kitchen to front portion of house, remodel existing bathroom. non-struct. alteration. | $15,000 |
| Jul 19, 2017 | Completed final sign-off Oct 2017 | 766 38th Av | remodel (e) kitchen & (e) bathroom on 2/fDetails
remodel (e) kitchen & (e) bathroom on 2/f | $22,000 |
| May 30, 2017 | Completed final sign-off Jun 2017 | 909 Franklin St | unit #10: remodel (e) kitchen and bath.Details
unit #10: remodel (e) kitchen and bath. | $8,000 |
| May 1, 2017 | Completed final sign-off Sep 2017 | 475 16th Av | remodel kitchen and 2 baths at 2nd and 3rd fl per planDetails
remodel kitchen and 2 baths at 2nd and 3rd fl per plan | $56,000 |
| Apr 18, 2017 | Completed final sign-off May 2017 | 1541 Clement St | remodel (e) kitchen and bathroom at 2nd floor dwelling unit.Details
remodel (e) kitchen and bathroom at 2nd floor dwelling unit. | $20,000 |
| Mar 30, 2017 | Completed final sign-off Oct 2017 | 218 Grafton Av | 1st floor: convert extg space to have 2 bedrooms, a full bath, a family room. 2nd floor remodel kitchen, bathroom, and add a bathroom.Details
1st floor: convert extg space to have 2 bedrooms, a full bath, a family room. 2nd floor remodel kitchen, bathroom, and add a bathroom. | $60,000 |
| Dec 2, 2016 | Completed final sign-off Apr 2017 | 1387 18th Av | remodel (e) kitchen.Details
remodel (e) kitchen. | $16,000 |
| Nov 10, 2016 | Completed final sign-off Jan 2017 | 1155 Folsom St | t.i. to remodel kitchen, add two accessible bathrooms and non-bearing partition walls per plan. no exterior workDetails
t.i. to remodel kitchen, add two accessible bathrooms and non-bearing partition walls per plan. no exterior work | $54,000 |
| Oct 14, 2016 | Expired or cancelled expired Jun 2018 | 600 Miramar Av | to comply with complaint #201627011, remodel bath, kitchen, remove non-bearing partition wall at 2/f, replace interior finishes with 5/8" type 'x' gyp. bd.Details
to comply with complaint #201627011, remodel bath, kitchen, remove non-bearing partition wall at 2/f, replace interior finishes with 5/8" type 'x' gyp. bd. | $36,800 |
| Oct 11, 2016 | Completed final sign-off Jan 2017 | 301 Monterey Bl | unit 3 - remodel kitchen & bathroom; replace kitchen cabinets, countertop, fixture, bath tub, vanity & toilet; replace interior finishes w/ 5/*" type x gyp. bd.Details
unit 3 - remodel kitchen & bathroom; replace kitchen cabinets, countertop, fixture, bath tub, vanity & toilet; replace interior finishes w/ 5/*" type x gyp. bd. | $25,400 |
| Aug 25, 2016 | Completed final sign-off Jun 2019 | 55 Dichiera Ct | to comply with nov#201631381. remodel existing kitchen, replace counter top & cabinets.Details
to comply with nov#201631381. remodel existing kitchen, replace counter top & cabinets. | $11,000 |
| Aug 25, 2016 | Completed final sign-off Nov 2016 | 1591 33rd Av | remodel existing kitchen; replace counter top & cabinets, upgrade living room & dining room electricity. to comply with nov# 201632561 & nov #201697241Details
remodel existing kitchen; replace counter top & cabinets, upgrade living room & dining room electricity. to comply with nov# 201632561 & nov #201697241 | $11,000 |
| Jul 25, 2016 | Completed final sign-off Dec 2016 | 1466 Jackson St | add 1 new bathroom, remodel (e) bathroom & kitchen. install 2 new skylights maher naDetails
add 1 new bathroom, remodel (e) bathroom & kitchen. install 2 new skylights maher na | $32,000 |
| Jul 18, 2016 | Never finaled issued Jul 2016, no final | 933 Clement St | install 3 floor sinks @ (e) kitchen.Details
install 3 floor sinks @ (e) kitchen. | $4,000 |
| Jun 30, 2016 | Completed final sign-off Mar 2017 | 2339 12th Av | remodel (e) bathroom & kitchen and add 1 new bathroom @ 2nd floor. relocated (e) stair to new location from 2nd floor to 1st floor. two new bedrooms, two bathroom, family room, study and laundry area to be constructed @ ground floor. extend (e) light well down to ground floor with landing. rearDetails
remodel (e) bathroom & kitchen and add 1 new bathroom @ 2nd floor. relocated (e) stair to new location from 2nd floor to 1st floor. two new bedrooms, two bathroom, family room, study and laundry area to be constructed @ ground floor. extend (e) light well down to ground floor with landing. rear | $95,000 |
| Jun 10, 2016 | Completed final sign-off Sep 2016 | 236 Russia Av | to comply with complaint #201621661; 2/f : remodel (e) 2 bathrooms & 1 kitchen.Details
to comply with complaint #201621661; 2/f : remodel (e) 2 bathrooms & 1 kitchen. | $30,000 |
| May 17, 2016 | Never finaled issued May 2016, no final | 1095 Rhode Island St | remodel kitchen & bath room; replace sink, cabinet, floor tile & replace wall finishes with 5/8" type "x" gyp. bd.Details
remodel kitchen & bath room; replace sink, cabinet, floor tile & replace wall finishes with 5/8" type "x" gyp. bd. | $35,000 |
| May 3, 2016 | Completed final sign-off Oct 2016 | 2906 Yorba St | remodel (e) kitchen & 2 bathrooms.Details
remodel (e) kitchen & 2 bathrooms. | $32,000 |
| Feb 1, 2016 | Completed final sign-off Nov 2016 | 322 Flood Av | 1/f: convert (e) space to family room, 2 bedrooms, 2 full baths, powder room and laundry area; 2nd floor - remodel (e) kitchen and bathroom, add full bath and powder room.Details
1/f: convert (e) space to family room, 2 bedrooms, 2 full baths, powder room and laundry area; 2nd floor - remodel (e) kitchen and bathroom, add full bath and powder room. | $80,000 |
| Nov 10, 2015 | Completed final sign-off Jun 2016 | 400 Persia Av | remodel two bathrooms and one kitchen.Details
remodel two bathrooms and one kitchen. | $32,000 |
| Nov 6, 2015 | Never finaled issued Nov 2015, no final | 53 Wabash Tr | kitchen remodel - replace floor tiles, cabinets & sink.Details
kitchen remodel - replace floor tiles, cabinets & sink. | $6,500 |
| Nov 6, 2015 | Completed final sign-off Sep 2016 | 1350 24th Av | remodel (e) kitchen and bathroom (tw0) on 2nd floor. replace 15 windows at lightwell and rear, not visible to street. no structural work. u=0.32Details
remodel (e) kitchen and bathroom (tw0) on 2nd floor. replace 15 windows at lightwell and rear, not visible to street. no structural work. u=0.32 | $50,000 |
| Oct 16, 2015 | Completed final sign-off Apr 2016 | 2840 San Bruno Av | remodel e kitchen and change e dining to be bedroom in unit #1 and #3 at 2nd fl per planDetails
remodel e kitchen and change e dining to be bedroom in unit #1 and #3 at 2nd fl per plan | $20,000 |
| Oct 8, 2015 | Completed final sign-off Aug 2016 | 1607 16th Av | interior kitchen remodel, cabinetry & replace appliances, interior bathroom remodel, remove/replace bath tubs, tiles to tiles, cabinetry in all (e) bathrooms, reaplce new window not visible from street, u factor = 0.32.Details
interior kitchen remodel, cabinetry & replace appliances, interior bathroom remodel, remove/replace bath tubs, tiles to tiles, cabinetry in all (e) bathrooms, reaplce new window not visible from street, u factor = 0.32. | $90,000 |
| Sep 24, 2015 | Completed final sign-off Jan 2016 | 35 Palos Pl | remodel kitchen and 2 bathrooms.Details
remodel kitchen and 2 bathrooms. | $20,000 |
| Jul 21, 2015 | Completed final sign-off Oct 2015 | 215 Argonaut Av | to comply with nov#201558081. remodel (e) 1 bathroom & (e) laundry @ g/f. remodel (e) 2 bathrooms & (e) kitchen @ 2/f. replace 2 windows @ rear wall on 2/f & 2 sliding doors on g/f rear wall. replacing siding in-kind @ rear wall 25x25ft high. no structural work.Details
to comply with nov#201558081. remodel (e) 1 bathroom & (e) laundry @ g/f. remodel (e) 2 bathrooms & (e) kitchen @ 2/f. replace 2 windows @ rear wall on 2/f & 2 sliding doors on g/f rear wall. replacing siding in-kind @ rear wall 25x25ft high. no structural work. | $55,000 |
| Jul 1, 2015 | Completed final sign-off Dec 2015 | 55 San Fernando Wy | replace kitchen cabinets, counter tops, plumbing & lighting fixtures. replace tile, vanity cabinets, plumbing & lighting fixtures for 3 baths, interior painting.Details
replace kitchen cabinets, counter tops, plumbing & lighting fixtures. replace tile, vanity cabinets, plumbing & lighting fixtures for 3 baths, interior painting. | $70,000 |
| Jun 9, 2015 | Completed final sign-off Mar 2016 | 2030 Thomas Av | remodel (e) kitchen at 2nd floor, replace 400 sq. ft. siding at rear side, replace 4 windows (not visible from street)Details
remodel (e) kitchen at 2nd floor, replace 400 sq. ft. siding at rear side, replace 4 windows (not visible from street) | $12,000 |
| Mar 18, 2015 | Completed final sign-off Aug 2015 | 3222 18th St | remodel kitchen and bathrom at unit at 3222a. no wall to be removed.Details
remodel kitchen and bathrom at unit at 3222a. no wall to be removed. | $30,000 |
| Mar 11, 2015 | Completed final sign-off Dec 2016 | 171 Kenwood Wy | remodel (e) kitchen and 2 (e) bathrooms on 2/f. remove all plaster and replace 5/8" gyp. bd. for walls and ceiling on 2/fDetails
remodel (e) kitchen and 2 (e) bathrooms on 2/f. remove all plaster and replace 5/8" gyp. bd. for walls and ceiling on 2/f | $60,000 |
| Feb 20, 2015 | Completed final sign-off May 2015 | 4226 Fulton St | remodel (e) kitchen @ 2/fDetails
remodel (e) kitchen @ 2/f | $9,239 |
| Feb 4, 2015 | Completed final sign-off Sep 2015 | 1991 California St | apt. # 111 & apt. 112: remodel existing kitchen & one (e) bathroom at unit #111. no structural work.Details
apt. # 111 & apt. 112: remodel existing kitchen & one (e) bathroom at unit #111. no structural work. | |
| Dec 2, 2014 | Never finaled issued Dec 2014, no final | 815 Rolph St | remodel (e) kitchen & bathroom on 2nd floor., no structural work.Details
remodel (e) kitchen & bathroom on 2nd floor., no structural work. | $15,000 |
| Oct 29, 2014 | Completed final sign-off Jan 2015 | 3340 San Bruno Av | unit # 5: remodel one kitchen and three bathrooms on unit # 5. comply with complaint # 201402771Details
unit # 5: remodel one kitchen and three bathrooms on unit # 5. comply with complaint # 201402771 | $42,000 |
| Sep 22, 2014 | Completed final sign-off Nov 2014 | 1542 33rd Av | remodel (e) kitchen at 2nd floor.Details
remodel (e) kitchen at 2nd floor. | $12,000 |
| Sep 11, 2014 | Completed final sign-off Oct 2014 | 888 44th Av | remodel (e) kitchen & bathroom @ 3rd floor.Details
remodel (e) kitchen & bathroom @ 3rd floor. | $18,000 |
| Aug 8, 2014 | Completed final sign-off Oct 2014 | 5125 Mission St | replace floor tile in kitchen & new paint through out.Details
replace floor tile in kitchen & new paint through out. | $6,000 |
| Jul 23, 2014 | Completed final sign-off Sep 2015 | 795 Foerster St | design revision to app. 201405206282; redesign entrance stair, add (n) sink & wine fridge to kitchen island; (n) small entry closet; relocate laundry counter & sink, no structural work, no change to building envelope comply with complaint# 201448651.Details
design revision to app. 201405206282; redesign entrance stair, add (n) sink & wine fridge to kitchen island; (n) small entry closet; relocate laundry counter & sink, no structural work, no change to building envelope comply with complaint# 201448651. | $1,000 |
| Jun 19, 2014 | Completed final sign-off May 2015 | 288 Williams Av | remodel kitchen, replace counter & cabinets.Details
remodel kitchen, replace counter & cabinets. | $9,500 |
| Mar 21, 2014 | Never finaled issued Mar 2014, no final | 2007 Pacific Av | unit 1: remodel (e) kitchen, no structural work. no windows, no doors on this permit.Details
unit 1: remodel (e) kitchen, no structural work. no windows, no doors on this permit. | $9,000 |
| Mar 20, 2014 | Completed final sign-off Jul 2014 | 2094 Mission St | comply with nov 201459522 & 201459731 remodel (e0 bathroom and kitchen. replace (e) plaster walls with new 5/8 gmp, bd type for walls and ceiling at upper units, no change in layoutDetails
comply with nov 201459522 & 201459731 remodel (e0 bathroom and kitchen. replace (e) plaster walls with new 5/8 gmp, bd type for walls and ceiling at upper units, no change in layout | $40,000 |
| Feb 18, 2014 | Completed final sign-off Sep 2014 | 2165 Revere Av | remodel kitchen, two & half bathrooms & replace interior finished with 5/8" typ. "x" gyp. bd. @ 2/f. no change on walls.Details
remodel kitchen, two & half bathrooms & replace interior finished with 5/8" typ. "x" gyp. bd. @ 2/f. no change on walls. | $39,700 |
| Jan 24, 2014 | Completed final sign-off Mar 2014 | 956 Goettingen St | comply with complaint #201446401 & 201264721: remodel kitchen & bathroom at 2nd floor. add storage & full bath at 1st floor.Details
comply with complaint #201446401 & 201264721: remodel kitchen & bathroom at 2nd floor. add storage & full bath at 1st floor. | $35,300 |
| Jan 17, 2014 | Completed final sign-off Jun 2014 | 2620 Kirkham St | remodel kitchen & 2 bathrooms at 2/f; to comply with cec150(k) 8 & 10Details
remodel kitchen & 2 bathrooms at 2/f; to comply with cec150(k) 8 & 10 | $31,000 |
| Dec 31, 2013 | Completed final sign-off Apr 2014 | 78 John St | remodel (e) kitchen at 2nd floorDetails
remodel (e) kitchen at 2nd floor | $9,000 |
| Dec 16, 2013 | Never finaled issued Feb 2014, no final | 795 Foerster St | revision to app#201305136760. reconfigured front stairs. relocate kitchen. add new skylight. add new bathroom on lower floor. replace windows at front facade.Details
revision to app#201305136760. reconfigured front stairs. relocate kitchen. add new skylight. add new bathroom on lower floor. replace windows at front facade. | $27,300 |
| Oct 11, 2013 | Completed final sign-off Jan 2014 | 174 Edinburgh St | remodel kitchen and bathroom in 2nd floor.Details
remodel kitchen and bathroom in 2nd floor. | $12,000 |
| Sep 12, 2013 | Completed final sign-off Dec 2013 | 533 02nd Av | remodel (e) kitchen & (e) bathroom, no windows or doors on this permitDetails
remodel (e) kitchen & (e) bathroom, no windows or doors on this permit | $10,000 |
| Sep 12, 2013 | Completed final sign-off Dec 2013 | 531 02nd Av | remodel (e) kitchen, no windows or doors on this permitDetails
remodel (e) kitchen, no windows or doors on this permit | $10,000 |
| Aug 29, 2013 | Completed final sign-off Oct 2013 | 1001 Pine St | unit #502: remodel kitchen and bathroom @ unit # 502.Details
unit #502: remodel kitchen and bathroom @ unit # 502. | $13,600 |
| May 10, 2013 | Completed final sign-off Jun 2013 | 2659 Leavenworth St | comply with complaint #201399801 - remove illegal kitchen at ground floor.Details
comply with complaint #201399801 - remove illegal kitchen at ground floor. | $3,000 |
| Apr 8, 2013 | Completed final sign-off Aug 2013 | 1222 Noriega St | t.i. to restaurant new tenant: repair extg floor tile. new kitchen equipment and appliances or replace or refurbish extg kitchen equipment, upgrade extg restroom for accessiblity.Details
t.i. to restaurant new tenant: repair extg floor tile. new kitchen equipment and appliances or replace or refurbish extg kitchen equipment, upgrade extg restroom for accessiblity. | $33,000 |
| Feb 8, 2013 | Completed final sign-off May 2013 | 333 Trumbull St | relocate kitchen and add 2 bedrooms at 2nd flrDetails
relocate kitchen and add 2 bedrooms at 2nd flr | $23,600 |
| Feb 8, 2013 | Expired or cancelled expired Jun 2022 | 189 Santa Ynez Av | 1)comply with complaint #201383621. 2)addition work to approved app#201212105774. remodel extg kitchen, bathroom, and add one full bath at 2nd floor. 3)restore light well to previous extg condition.Details
1)comply with complaint #201383621. 2)addition work to approved app#201212105774. remodel extg kitchen, bathroom, and add one full bath at 2nd floor. 3)restore light well to previous extg condition. | $26,800 |
| Jan 23, 2013 | Completed final sign-off Jan 2014 | 2570 21st Av | remodel (e) kitchen and one bathroom at 2nd floorDetails
remodel (e) kitchen and one bathroom at 2nd floor | $11,000 |
| Jan 22, 2013 | Completed final sign-off Aug 2013 | 26 Waldo Al | remodel (e) kitchen and one (e) bathroom. no structural work. repair (e) deck, less than 50%.Details
remodel (e) kitchen and one (e) bathroom. no structural work. repair (e) deck, less than 50%. | $11,000 |
| Jan 22, 2013 | Completed final sign-off Aug 2013 | 24 Waldo Al | remodel (e) kitchen and one (e) bathroom. no structural work. repair (e) deck, less than 50%.Details
remodel (e) kitchen and one (e) bathroom. no structural work. repair (e) deck, less than 50%. | $11,000 |
| Oct 24, 2012 | Never finaled issued Oct 2012, no final | 3410 San Bruno Av | to remodel existing kitchen, no walls to be removed or addedDetails
to remodel existing kitchen, no walls to be removed or added | $11,000 |
| Oct 15, 2012 | Completed final sign-off Feb 2013 | 2239 20th Av | remodel kitchen & two bathrooms at 2nd floor. repair front stair in kind, less than 50&. replace 18 windows, (5 at front to be aluminum casement).Details
remodel kitchen & two bathrooms at 2nd floor. repair front stair in kind, less than 50&. replace 18 windows, (5 at front to be aluminum casement). | $30,800 |
| Sep 6, 2012 | Completed final sign-off Oct 2012 | 801 Capitol Av | remodel (e) kitchen and 2 (e) bathrooms @ 2/f, replace windows in kind, r=0.40 max, not visable from street, no structural work.Details
remodel (e) kitchen and 2 (e) bathrooms @ 2/f, replace windows in kind, r=0.40 max, not visable from street, no structural work. | $25,000 |
| Sep 5, 2012 | Completed final sign-off Jan 2015 | 772 47th Av | remodel kitchen & 3 bathrooms at 2/f, remove & replace interior finish with 1/2 gyp. board.Details
remodel kitchen & 3 bathrooms at 2/f, remove & replace interior finish with 1/2 gyp. board. | $39,800 |
| Aug 13, 2012 | Completed final sign-off Sep 2013 | 28 Meda Av | comply with complaint #201251821, 201254461 & 201255281. rev to app #201207134840. 1st fl: add 2 bedroom, 2 bathrooms & laundry. 2nd fl: relcate kitchen, bathroom, install (n) fireplace, add half bath & laundry closet. 3rd fl: add one & half bathroom.Details
comply with complaint #201251821, 201254461 & 201255281. rev to app #201207134840. 1st fl: add 2 bedroom, 2 bathrooms & laundry. 2nd fl: relcate kitchen, bathroom, install (n) fireplace, add half bath & laundry closet. 3rd fl: add one & half bathroom. | $68,000 |
| Jul 20, 2012 | Completed final sign-off Oct 2013 | 441 Yerba Buena Av | remove plaster throughout interior of house. kitchen and bathroom remodelDetails
remove plaster throughout interior of house. kitchen and bathroom remodel | $40,000 |
| Jul 13, 2012 | Completed final sign-off Sep 2013 | 28 Meda Av | remodel kitchen & 2 bathrooms at 2nd floor. remove and replace interior finish with 1/2 gyp board.Details
remodel kitchen & 2 bathrooms at 2nd floor. remove and replace interior finish with 1/2 gyp board. | $28,000 |
| Jul 13, 2012 | Never finaled issued Jul 2012, no final | 1554 39th Av | remodel kitchen and one bathroom on 2nd floor.Details
remodel kitchen and one bathroom on 2nd floor. | $13,000 |
| Jun 7, 2012 | Completed final sign-off Aug 2012 | 77 Seminole Av | comply with complaint #201164273-remove illegal kitchen at ground floor, legalize (e) bathroom, bedroom & laundry at ground floorDetails
comply with complaint #201164273-remove illegal kitchen at ground floor, legalize (e) bathroom, bedroom & laundry at ground floor | $25,600 |
| May 21, 2012 | Never finaled issued Jun 2012, no final | 1700 Post St | to comply w/complaint #200670983 - remodel existing restrooms, build bar & ceiling above the bar, install bbw grills & hoods, replace kitchen equipment, install light fixtures.Details
to comply w/complaint #200670983 - remodel existing restrooms, build bar & ceiling above the bar, install bbw grills & hoods, replace kitchen equipment, install light fixtures. | $75,000 |
| May 11, 2012 | Completed final sign-off Dec 2012 | 26 Liberty St | remodel kitchen, no structural work, new lighting, comply with cec 150(k)Details
remodel kitchen, no structural work, new lighting, comply with cec 150(k) | $9,500 |
| Apr 11, 2012 | Completed final sign-off Jul 2012 | 163 Bright St | remodel kitchen & bathroom @ 2/f to comply with nov #201214401Details
remodel kitchen & bathroom @ 2/f to comply with nov #201214401 | $12,000 |
| Apr 2, 2012 | Completed final sign-off May 2012 | 303 Greenwich St | remodel kitchen and bathroom. replace water heater and washer and dryer. no structural work. new lighting comply with cec 150(k)Details
remodel kitchen and bathroom. replace water heater and washer and dryer. no structural work. new lighting comply with cec 150(k) | $18,000 |
| Mar 22, 2012 | Completed final sign-off Jun 2012 | 607 23rd Av | revision to pa#201203085612 & 201202244789 to remove existing plaster walls with new 5/8" gyp. board at 2 bedrooms, living room, family room, kitchen & 2 bathrooms @ 2/f.Details
revision to pa#201203085612 & 201202244789 to remove existing plaster walls with new 5/8" gyp. board at 2 bedrooms, living room, family room, kitchen & 2 bathrooms @ 2/f. | $5,000 |
| Mar 15, 2012 | Completed final sign-off Jul 2012 | 607 34th Av | comply with nov's# 201201581, 201201584 & 201203228-remove illegal kitchen's in garage, laundry area at ground floor & convert it back to original use. legalize 1 bathroom at ground floorDetails
comply with nov's# 201201581, 201201584 & 201203228-remove illegal kitchen's in garage, laundry area at ground floor & convert it back to original use. legalize 1 bathroom at ground floor | $15,000 |
| Mar 6, 2012 | Completed final sign-off Jun 2012 | 1830 Silliman St | remodel (e) kitchen & bathroom @ 2/f. no structural work, new lighting.Details
remodel (e) kitchen & bathroom @ 2/f. no structural work, new lighting. | $18,000 |
| Feb 13, 2012 | Completed final sign-off Jul 2012 | 44 Langton St | #a - remodel (e) kitchen & bathroom, no structural work, (n) lighting comply with cec150(k)Details
#a - remodel (e) kitchen & bathroom, no structural work, (n) lighting comply with cec150(k) | $13,000 |
| Jan 25, 2012 | Completed final sign-off Feb 2012 | 765 Anderson St | comply with complaint #201279554 - revision to pa #2011.11.16.9016: reconfig layout at ground floor. remodel kitchen, two bathrooms, laundry & bedrooms at 2nd floor. replace stairs at rear yard.Details
comply with complaint #201279554 - revision to pa #2011.11.16.9016: reconfig layout at ground floor. remodel kitchen, two bathrooms, laundry & bedrooms at 2nd floor. replace stairs at rear yard. | $39,000 |
| Dec 28, 2011 | Completed final sign-off Jul 2012 | 44 Langton St | repair rear deck less than 50% for dry rotted repair. remodel three kitchens at each units. no structural work. new lighting comply w/ cec 150 (k). one at unit 44, 46 & 46a. retile bathrooms at each unit floor & walls.Details
repair rear deck less than 50% for dry rotted repair. remodel three kitchens at each units. no structural work. new lighting comply w/ cec 150 (k). one at unit 44, 46 & 46a. retile bathrooms at each unit floor & walls. | $38,000 |
| Dec 13, 2011 | Completed final sign-off Jan 2012 | 489 Chenery St | replace tiles on kitchen and bathroom floor @ rear unit, repaint inside and outside of the houseDetails
replace tiles on kitchen and bathroom floor @ rear unit, repaint inside and outside of the house | $6,000 |
| Nov 14, 2011 | Completed final sign-off Apr 2012 | 367 Edinburgh St | remodel kitchen & 2 bathrooms on 2/f. no structural work, (n) lighting comply with cec150(k)Details
remodel kitchen & 2 bathrooms on 2/f. no structural work, (n) lighting comply with cec150(k) | $21,000 |
| Oct 14, 2011 | Completed final sign-off Dec 2011 | 2341 Market St | comply with nov #201159967. remodel kitchen & bathroom at unit #3.Details
comply with nov #201159967. remodel kitchen & bathroom at unit #3. | $7,000 |
| Aug 16, 2011 | Completed final sign-off Aug 2011 | 347 Seneca Av | 1) comply with complaint #200999224. 2) remove illigal kitchen at ground floor.Details
1) comply with complaint #200999224. 2) remove illigal kitchen at ground floor. | $2,000 |
| Jul 27, 2011 | Completed final sign-off Oct 2012 | 3548 Divisadero St | basement remodel, kitchen remodel, window replacement,install 2 new bathroom upper floors. replace foundation.Details
basement remodel, kitchen remodel, window replacement,install 2 new bathroom upper floors. replace foundation. | $80,000 |