Back to bathroom remodel contractors
Lei's Construction Company
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Aug 2026
- Last 24 months
- 8 permits filed
372 permits since 2000: 310 completed, 4 in progress, 42 never finaled, 16 expired or cancelled.
Of the 42 never-finaled permits, 3 are 5 to 10 years old, 39 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
166 bathroom remodel permits: 141 completed, 2 in progress, 19 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 108 days from permit to final inspection.
Showing the 100 most recent of 166.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 6, 2026 | In progress issued Aug 2026 | 160 Santa Rosa Av | 2nd floor remodel bathroom and convert powder room to full bathroom per plan.Details
2nd floor remodel bathroom and convert powder room to full bathroom per plan. | $43,000 |
| May 14, 2026 | In progress issued May 2026 | 636 Teresita Bl | 2nd fl - remodel (1) bathroom, replaced bath tub to bath tub, toilet & vanity @ (e) location in-kindDetails
2nd fl - remodel (1) bathroom, replaced bath tub to bath tub, toilet & vanity @ (e) location in-kind | $23,000 |
| Feb 27, 2024 | Completed final sign-off Mar 2024 | 3855 California St | ref complaint 202315826: repair damaged interior doors, caulk tub, provide gfci at bathroom, install sink in-kind, install stove hood in-kind and repaint all rooms (items 2-7_ in unit 1.Details
ref complaint 202315826: repair damaged interior doors, caulk tub, provide gfci at bathroom, install sink in-kind, install stove hood in-kind and repaint all rooms (items 2-7_ in unit 1. | $7,000 |
| Dec 20, 2019 | Completed final sign-off Jan 2021 | 2267 42nd Av | add a full bathroom, relocate bedroom and full bathroom, remodel kitchen on 2nd fl. add a bedroom, full bathroom, enlarge foyer area on the 1st fl. replace water heater with tankless type.Details
add a full bathroom, relocate bedroom and full bathroom, remodel kitchen on 2nd fl. add a bedroom, full bathroom, enlarge foyer area on the 1st fl. replace water heater with tankless type. | $70,000 |
| Sep 5, 2019 | Completed final sign-off Feb 2021 | 145 Manor Dr | 1st flr - convert partial family rm to bedrm add one bedrm 2 & 1/2 bath. 2nd flr - relocated front entry, kitchen, dining, bedroom, 2 bath & interior stair. replaced window at front and add windows per plan. all windows to be aluminum wood clad.Details
1st flr - convert partial family rm to bedrm add one bedrm 2 & 1/2 bath. 2nd flr - relocated front entry, kitchen, dining, bedroom, 2 bath & interior stair. replaced window at front and add windows per plan. all windows to be aluminum wood clad. | $87,600 |
| Aug 27, 2019 | Completed final sign-off May 2020 | 1727 18th Av | remodel existing kitchen and two existing bathroom @ 2nd floor. remove and replace existing plaster and replace with new 5/8" type x gyp.Details
remodel existing kitchen and two existing bathroom @ 2nd floor. remove and replace existing plaster and replace with new 5/8" type x gyp. | $30,000 |
| Jul 30, 2019 | Completed final sign-off Feb 2020 | 1980 Silver Av | add a full bath on the 2nd flDetails
add a full bath on the 2nd fl | $10,000 |
| Jul 12, 2019 | Completed final sign-off Apr 2022 | 600 Miramar Av | 1) revision to pa# 2019-0211-2642. 2) add one bedroom & bath at grd flr. 3) remove & replace all stucco in-kind. 4) replace & add windows per plan, all windows to be aluminum wood clad.Details
1) revision to pa# 2019-0211-2642. 2) add one bedroom & bath at grd flr. 3) remove & replace all stucco in-kind. 4) replace & add windows per plan, all windows to be aluminum wood clad. | $120,000 |
| Jun 14, 2019 | Completed final sign-off Jul 2019 | 1924 Sloat Bl | remodel (e) 2nd floor bathroomDetails
remodel (e) 2nd floor bathroom | $8,000 |
| Feb 26, 2019 | Completed final sign-off Jul 2019 | 764 Rolph St | remodel (e) bathroom & kitchen and replace (e) pilaster walls w/ 5/8" gyp. bd w/ insulation of 2nd flr.Details
remodel (e) bathroom & kitchen and replace (e) pilaster walls w/ 5/8" gyp. bd w/ insulation of 2nd flr. | $48,000 |
| Sep 18, 2018 | Completed final sign-off Apr 2019 | 2527 39th Av | 1st floor: add 2 bedrooms, 2.5 baths and media room with wetbar. 2nd floor: relocate kitchen, add 1.5 baths, remodel 1 bath, new laundry. new deck at rear. new rear windows and sliding doors. - new stucco at the front. foundation repair(minor)Details
1st floor: add 2 bedrooms, 2.5 baths and media room with wetbar. 2nd floor: relocate kitchen, add 1.5 baths, remodel 1 bath, new laundry. new deck at rear. new rear windows and sliding doors. - new stucco at the front. foundation repair(minor) | $100,000 |
| Aug 13, 2018 | Completed final sign-off Jan 2019 | 35 Gabilan Wy | remodel (e) kitchen & two (e) bathrooms at upper floor, upgrade electrical system.Details
remodel (e) kitchen & two (e) bathrooms at upper floor, upgrade electrical system. | $20,000 |
| Aug 8, 2018 | Completed final sign-off Dec 2018 | 555 Campbell Av | rmodel (e) kitchen and two (e) bathrooms at 2nd floor, replace (e) plaster wall finish to 5/8" gyp board.Details
rmodel (e) kitchen and two (e) bathrooms at 2nd floor, replace (e) plaster wall finish to 5/8" gyp board. | $30,000 |
| Jul 12, 2018 | Completed final sign-off Sep 2018 | 441 09th Av | kitchen & bathroom remodelDetails
kitchen & bathroom remodel | $27,000 |
| Jun 21, 2018 | Completed final sign-off Mar 2019 | 242 Minerva St | 2nd fl - add 1 (n) bathroom, remodel 1 (e) bathroom & (e) kitchen; 1st fl - add 2(n) bathrooms, 2(n) bedrooms, 1 (n) home theater; exterior - replace 4 vinyl windows & 3 patio doors to (e) openings @ rear in-kind. build new deck & stair @ rear yardDetails
2nd fl - add 1 (n) bathroom, remodel 1 (e) bathroom & (e) kitchen; 1st fl - add 2(n) bathrooms, 2(n) bedrooms, 1 (n) home theater; exterior - replace 4 vinyl windows & 3 patio doors to (e) openings @ rear in-kind. build new deck & stair @ rear yard | $85,000 |
| May 17, 2018 | Completed final sign-off Jun 2019 | 147 Maynard St | remodel two bathrooms & one kitchen.Details
remodel two bathrooms & one kitchen. | $38,000 |
| Mar 13, 2018 | Completed final sign-off May 2018 | 169 Paris St | remodel (e) kitchen & 2 (e) bathrooms at 2nd floor.Details
remodel (e) kitchen & 2 (e) bathrooms at 2nd floor. | $30,000 |
| Feb 15, 2018 | Completed final sign-off May 2018 | 246 Orizaba Av | inresponse to nov #201834263. residential ground floor remodel for addition of habitable space. all work limited to within extg bldg envelope. new 1 bathroom, study, media area on ground floor.Details
inresponse to nov #201834263. residential ground floor remodel for addition of habitable space. all work limited to within extg bldg envelope. new 1 bathroom, study, media area on ground floor. | $50,000 |
| Jan 19, 2018 | Completed final sign-off May 2018 | 337 Bridgeview Dr | relocate kitchen, remodel (e) bathroom. construct 1 (n) bathroom & convert (e) kitchen space to bed room @ 2nd floor. construct new deck with staircase at rear of building (17'x8')Details
relocate kitchen, remodel (e) bathroom. construct 1 (n) bathroom & convert (e) kitchen space to bed room @ 2nd floor. construct new deck with staircase at rear of building (17'x8') | $50,000 |
| Aug 25, 2017 | Completed final sign-off Nov 2017 | 668 04th Av | unit #a: remodel existing bathroom on ground fl.Details
unit #a: remodel existing bathroom on ground fl. | $9,000 |
| Jul 21, 2017 | Completed final sign-off Nov 2017 | 367 Bright St | remodel on second floor. relocate exist. kitchen to front portion of house, remodel existing bathroom. non-struct. alteration.Details
remodel on second floor. relocate exist. kitchen to front portion of house, remodel existing bathroom. non-struct. alteration. | $15,000 |
| Jul 19, 2017 | Completed final sign-off Oct 2017 | 766 38th Av | remodel (e) kitchen & (e) bathroom on 2/fDetails
remodel (e) kitchen & (e) bathroom on 2/f | $22,000 |
| Jun 28, 2017 | Expired or cancelled expired Apr 2022 | 600 Miramar Av | to comply with nov#201627011/201648857/201756504/201757174; rev & addition work to pa#201610140334: restore 2 chimneys to match original look, restore (1) wood arch window in-kind at dining room, all trims shall match the (e) house. rmeodel bathroom at 2/f , r/r plaster wall & ceiling finishes withDetails
to comply with nov#201627011/201648857/201756504/201757174; rev & addition work to pa#201610140334: restore 2 chimneys to match original look, restore (1) wood arch window in-kind at dining room, all trims shall match the (e) house. rmeodel bathroom at 2/f , r/r plaster wall & ceiling finishes with | $85,000 |
| May 30, 2017 | Completed final sign-off Jun 2017 | 909 Franklin St | unit #10: remodel (e) kitchen and bath.Details
unit #10: remodel (e) kitchen and bath. | $8,000 |
| May 1, 2017 | Completed final sign-off Sep 2017 | 475 16th Av | remodel kitchen and 2 baths at 2nd and 3rd fl per planDetails
remodel kitchen and 2 baths at 2nd and 3rd fl per plan | $56,000 |
| Apr 18, 2017 | Completed final sign-off May 2017 | 1541 Clement St | remodel (e) kitchen and bathroom at 2nd floor dwelling unit.Details
remodel (e) kitchen and bathroom at 2nd floor dwelling unit. | $20,000 |
| Mar 30, 2017 | Completed final sign-off Oct 2017 | 218 Grafton Av | 1st floor: convert extg space to have 2 bedrooms, a full bath, a family room. 2nd floor remodel kitchen, bathroom, and add a bathroom.Details
1st floor: convert extg space to have 2 bedrooms, a full bath, a family room. 2nd floor remodel kitchen, bathroom, and add a bathroom. | $60,000 |
| Nov 10, 2016 | Completed final sign-off Jan 2017 | 1155 Folsom St | t.i. to remodel kitchen, add two accessible bathrooms and non-bearing partition walls per plan. no exterior workDetails
t.i. to remodel kitchen, add two accessible bathrooms and non-bearing partition walls per plan. no exterior work | $54,000 |
| Nov 1, 2016 | Completed final sign-off Apr 2017 | 2291 45th Av | 1st floor: add family room, 2 bedrooms, 2 baths, 1 media room, new patio (at rear), & 1 den. 2nd floor: reconfigure interior staircase.Details
1st floor: add family room, 2 bedrooms, 2 baths, 1 media room, new patio (at rear), & 1 den. 2nd floor: reconfigure interior staircase. | $85,000 |
| Oct 14, 2016 | Expired or cancelled expired Jun 2018 | 600 Miramar Av | to comply with complaint #201627011, remodel bath, kitchen, remove non-bearing partition wall at 2/f, replace interior finishes with 5/8" type 'x' gyp. bd.Details
to comply with complaint #201627011, remodel bath, kitchen, remove non-bearing partition wall at 2/f, replace interior finishes with 5/8" type 'x' gyp. bd. | $36,800 |
| Oct 11, 2016 | Completed final sign-off Jan 2017 | 301 Monterey Bl | unit 3 - remodel kitchen & bathroom; replace kitchen cabinets, countertop, fixture, bath tub, vanity & toilet; replace interior finishes w/ 5/*" type x gyp. bd.Details
unit 3 - remodel kitchen & bathroom; replace kitchen cabinets, countertop, fixture, bath tub, vanity & toilet; replace interior finishes w/ 5/*" type x gyp. bd. | $25,400 |
| Jul 25, 2016 | Completed final sign-off Dec 2016 | 1466 Jackson St | add 1 new bathroom, remodel (e) bathroom & kitchen. install 2 new skylights maher naDetails
add 1 new bathroom, remodel (e) bathroom & kitchen. install 2 new skylights maher na | $32,000 |
| Jun 30, 2016 | Completed final sign-off Mar 2017 | 2339 12th Av | remodel (e) bathroom & kitchen and add 1 new bathroom @ 2nd floor. relocated (e) stair to new location from 2nd floor to 1st floor. two new bedrooms, two bathroom, family room, study and laundry area to be constructed @ ground floor. extend (e) light well down to ground floor with landing. rearDetails
remodel (e) bathroom & kitchen and add 1 new bathroom @ 2nd floor. relocated (e) stair to new location from 2nd floor to 1st floor. two new bedrooms, two bathroom, family room, study and laundry area to be constructed @ ground floor. extend (e) light well down to ground floor with landing. rear | $95,000 |
| Jun 10, 2016 | Completed final sign-off Sep 2016 | 236 Russia Av | to comply with complaint #201621661; 2/f : remodel (e) 2 bathrooms & 1 kitchen.Details
to comply with complaint #201621661; 2/f : remodel (e) 2 bathrooms & 1 kitchen. | $30,000 |
| May 17, 2016 | Never finaled issued May 2016, no final | 1095 Rhode Island St | remodel kitchen & bath room; replace sink, cabinet, floor tile & replace wall finishes with 5/8" type "x" gyp. bd.Details
remodel kitchen & bath room; replace sink, cabinet, floor tile & replace wall finishes with 5/8" type "x" gyp. bd. | $35,000 |
| May 6, 2016 | Completed final sign-off Sep 2016 | 279 Tara St | add full bathroom in (e) g/f & convert (e) storage to office, remove non-structural walls & install (n) recess ceiling light in (e) g/f playroom, bedroom, bathroom & storage. demo (e) deck & build (n) deck in the rear yard.Details
add full bathroom in (e) g/f & convert (e) storage to office, remove non-structural walls & install (n) recess ceiling light in (e) g/f playroom, bedroom, bathroom & storage. demo (e) deck & build (n) deck in the rear yard. | $20,000 |
| May 3, 2016 | Completed final sign-off Oct 2016 | 2906 Yorba St | remodel (e) kitchen & 2 bathrooms.Details
remodel (e) kitchen & 2 bathrooms. | $32,000 |
| Mar 29, 2016 | Completed final sign-off Dec 2016 | 171 Kenwood Wy | lower level: add (3) bedrooms, two and half bath, laundry & entertainment room. 1st floor: add one and half bath, remodel one bath& bedroom. 2nd floor: add wet bar & skylight. replace stucco at rear & both sides.Details
lower level: add (3) bedrooms, two and half bath, laundry & entertainment room. 1st floor: add one and half bath, remodel one bath& bedroom. 2nd floor: add wet bar & skylight. replace stucco at rear & both sides. | $300,000 |
| Feb 24, 2016 | Never finaled issued Feb 2016, no final | 675 34th Av | add one full bath room at 3rd floor.Details
add one full bath room at 3rd floor. | $11,000 |
| Feb 1, 2016 | Completed final sign-off Nov 2016 | 322 Flood Av | 1/f: convert (e) space to family room, 2 bedrooms, 2 full baths, powder room and laundry area; 2nd floor - remodel (e) kitchen and bathroom, add full bath and powder room.Details
1/f: convert (e) space to family room, 2 bedrooms, 2 full baths, powder room and laundry area; 2nd floor - remodel (e) kitchen and bathroom, add full bath and powder room. | $80,000 |
| Jan 22, 2016 | Completed final sign-off Mar 2016 | 744 44th Av | legalize as built bathroom on 1st flDetails
legalize as built bathroom on 1st fl | $10,000 |
| Dec 22, 2015 | Never finaled issued Dec 2015, no final | 675 34th Av | remodel (e) bathroom on 3/f and one (e) bathroom on 2/f.Details
remodel (e) bathroom on 3/f and one (e) bathroom on 2/f. | $18,000 |
| Dec 15, 2015 | Never finaled issued Dec 2015, no final | 878 Washington St | barrier removal only -voluntary upgrade extg bathroom to handicap accessible.Details
barrier removal only -voluntary upgrade extg bathroom to handicap accessible. | $3,000 |
| Nov 10, 2015 | Completed final sign-off Jun 2016 | 400 Persia Av | remodel two bathrooms and one kitchen.Details
remodel two bathrooms and one kitchen. | $32,000 |
| Nov 6, 2015 | Completed final sign-off Sep 2016 | 1350 24th Av | remodel (e) kitchen and bathroom (tw0) on 2nd floor. replace 15 windows at lightwell and rear, not visible to street. no structural work. u=0.32Details
remodel (e) kitchen and bathroom (tw0) on 2nd floor. replace 15 windows at lightwell and rear, not visible to street. no structural work. u=0.32 | $50,000 |
| Oct 13, 2015 | Completed final sign-off Oct 2015 | 237 Fillmore St | replace wall tiles 5'-0" high at ada bathroom and painting interior of the space, replace light fixture (no rewiring)Details
replace wall tiles 5'-0" high at ada bathroom and painting interior of the space, replace light fixture (no rewiring) | $5,000 |
| Oct 8, 2015 | Completed final sign-off Aug 2016 | 1607 16th Av | interior kitchen remodel, cabinetry & replace appliances, interior bathroom remodel, remove/replace bath tubs, tiles to tiles, cabinetry in all (e) bathrooms, reaplce new window not visible from street, u factor = 0.32.Details
interior kitchen remodel, cabinetry & replace appliances, interior bathroom remodel, remove/replace bath tubs, tiles to tiles, cabinetry in all (e) bathrooms, reaplce new window not visible from street, u factor = 0.32. | $90,000 |
| Sep 24, 2015 | Completed final sign-off Jan 2016 | 35 Palos Pl | remodel kitchen and 2 bathrooms.Details
remodel kitchen and 2 bathrooms. | $20,000 |
| Jul 30, 2015 | Completed final sign-off Feb 2016 | 162 Concord St | add 1 study room, 1 family room, 1 storage and 1 full bath at gr fl. no structural under this permitDetails
add 1 study room, 1 family room, 1 storage and 1 full bath at gr fl. no structural under this permit | $40,000 |
| Jul 21, 2015 | Completed final sign-off Oct 2015 | 215 Argonaut Av | to comply with nov#201558081. remodel (e) 1 bathroom & (e) laundry @ g/f. remodel (e) 2 bathrooms & (e) kitchen @ 2/f. replace 2 windows @ rear wall on 2/f & 2 sliding doors on g/f rear wall. replacing siding in-kind @ rear wall 25x25ft high. no structural work.Details
to comply with nov#201558081. remodel (e) 1 bathroom & (e) laundry @ g/f. remodel (e) 2 bathrooms & (e) kitchen @ 2/f. replace 2 windows @ rear wall on 2/f & 2 sliding doors on g/f rear wall. replacing siding in-kind @ rear wall 25x25ft high. no structural work. | $55,000 |
| Jul 1, 2015 | Completed final sign-off Dec 2015 | 55 San Fernando Wy | replace kitchen cabinets, counter tops, plumbing & lighting fixtures. replace tile, vanity cabinets, plumbing & lighting fixtures for 3 baths, interior painting.Details
replace kitchen cabinets, counter tops, plumbing & lighting fixtures. replace tile, vanity cabinets, plumbing & lighting fixtures for 3 baths, interior painting. | $70,000 |
| Jun 8, 2015 | Completed final sign-off Oct 2019 | 508 Head St | convert (e) one bedroom into two bedrooms. legalize storage room, construct one new bathroom & relcoate one bathroom. all work at ground floor.Details
convert (e) one bedroom into two bedrooms. legalize storage room, construct one new bathroom & relcoate one bathroom. all work at ground floor. | $32,000 |
| May 8, 2015 | Completed final sign-off May 2015 | 652 Commercial St | g/f shop - rep;lace dry rotted gyp. bd in bath room with 5/*" type x .Details
g/f shop - rep;lace dry rotted gyp. bd in bath room with 5/*" type x . | $1,000 |
| Apr 13, 2015 | Completed final sign-off May 2015 | 181 Lucky St | remodel total 3 (e) bathrooms - one on 3rd floor, one on 2nd floor and one on ground floor. paint outside, replace water heaterDetails
remodel total 3 (e) bathrooms - one on 3rd floor, one on 2nd floor and one on ground floor. paint outside, replace water heater | $20,000 |
| Mar 11, 2015 | Completed final sign-off Dec 2016 | 171 Kenwood Wy | remodel (e) kitchen and 2 (e) bathrooms on 2/f. remove all plaster and replace 5/8" gyp. bd. for walls and ceiling on 2/fDetails
remodel (e) kitchen and 2 (e) bathrooms on 2/f. remove all plaster and replace 5/8" gyp. bd. for walls and ceiling on 2/f | $60,000 |
| Mar 5, 2015 | Completed final sign-off Dec 2015 | 18 Arago St | interior remodel, remodel two bathrooms, add new bedroom and laundry area. new exterior deck. h/a maher ord. # 155-13Details
interior remodel, remodel two bathrooms, add new bedroom and laundry area. new exterior deck. h/a maher ord. # 155-13 | $35,000 |
| Feb 13, 2015 | Never finaled issued Feb 2015, no final | 179 Ramsell St | legalize 2 bedrooms, 1 full bath, laundry at 1st flDetails
legalize 2 bedrooms, 1 full bath, laundry at 1st fl | $33,000 |
| Feb 4, 2015 | Completed final sign-off Sep 2015 | 1991 California St | apt. # 111 & apt. 112: remodel existing kitchen & one (e) bathroom at unit #111. no structural work.Details
apt. # 111 & apt. 112: remodel existing kitchen & one (e) bathroom at unit #111. no structural work. | |
| Jan 26, 2015 | Completed final sign-off Mar 2015 | 648 Taraval St | to comply with complaint # 291413181. remove (e) bathroom sink and cabinetry per plan.Details
to comply with complaint # 291413181. remove (e) bathroom sink and cabinetry per plan. | $3,000 |
| Jan 15, 2015 | Never finaled issued Jan 2015, no final | 1355 33rd Av | remodel ground floor bathroom (existing) no structural workDetails
remodel ground floor bathroom (existing) no structural work | $9,000 |
| Dec 24, 2014 | Never finaled issued Dec 2014, no final | 1 Margaret Av | remodel first floor (e) bathroom.Details
remodel first floor (e) bathroom. | $1,500 |
| Dec 16, 2014 | Completed final sign-off Sep 2015 | 252 Broad St | upgrade bathrooms to two unisex accessible bathrooms and add attic space per plan. attic space created by new ceiling--not to be used for storage or occupancy.Details
upgrade bathrooms to two unisex accessible bathrooms and add attic space per plan. attic space created by new ceiling--not to be used for storage or occupancy. | $120,000 |
| Dec 2, 2014 | Never finaled issued Dec 2014, no final | 815 Rolph St | remodel (e) kitchen & bathroom on 2nd floor., no structural work.Details
remodel (e) kitchen & bathroom on 2nd floor., no structural work. | $15,000 |
| Oct 31, 2014 | Completed final sign-off Feb 2015 | 61 Waverly Pl | to comply with complaint #201487481, add dining area to exising restaurant, upgrade uni-sex bath room to ada accessible.Details
to comply with complaint #201487481, add dining area to exising restaurant, upgrade uni-sex bath room to ada accessible. | $35,000 |
| Oct 29, 2014 | Completed final sign-off Jan 2015 | 3340 San Bruno Av | unit # 5: remodel one kitchen and three bathrooms on unit # 5. comply with complaint # 201402771Details
unit # 5: remodel one kitchen and three bathrooms on unit # 5. comply with complaint # 201402771 | $42,000 |
| Sep 26, 2014 | Expired or cancelled expired Oct 2021 | 76 Bruce Av | three story rear addition for new master bedroom, bedroom famly,bathroom,two story front addition for new living room and parking garage.Details
three story rear addition for new master bedroom, bedroom famly,bathroom,two story front addition for new living room and parking garage. | $49,000 |
| Sep 11, 2014 | Completed final sign-off Oct 2014 | 888 44th Av | remodel (e) kitchen & bathroom @ 3rd floor.Details
remodel (e) kitchen & bathroom @ 3rd floor. | $18,000 |
| Jul 14, 2014 | Completed final sign-off Jul 2014 | 4076 17th St | work in unit 508: replace bathroom tiles.Details
work in unit 508: replace bathroom tiles. | $1,100 |
| Jun 6, 2014 | Completed final sign-off Jul 2014 | 209 Dublin St | as built floor plans to approved application 200108025104 and 201306250446. closet changes, relocate bathroom and add storage room at gr flDetails
as built floor plans to approved application 200108025104 and 201306250446. closet changes, relocate bathroom and add storage room at gr fl | |
| May 20, 2014 | Never finaled issued May 2014, no final | 795 Foerster St | minor revision to approved app#201312164317 reconfig master bath room & replace window in kind at rear at existing opening on lower level.Details
minor revision to approved app#201312164317 reconfig master bath room & replace window in kind at rear at existing opening on lower level. | $1,650 |
| Mar 20, 2014 | Completed final sign-off Jul 2014 | 2094 Mission St | comply with nov 201459522 & 201459731 remodel (e0 bathroom and kitchen. replace (e) plaster walls with new 5/8 gmp, bd type for walls and ceiling at upper units, no change in layoutDetails
comply with nov 201459522 & 201459731 remodel (e0 bathroom and kitchen. replace (e) plaster walls with new 5/8 gmp, bd type for walls and ceiling at upper units, no change in layout | $40,000 |
| Mar 18, 2014 | Completed final sign-off Nov 2014 | 1322 Noriega St | convert extg retail space into facial plus and construct five rooms and h.c. bath room. (mep under separate permit)Details
convert extg retail space into facial plus and construct five rooms and h.c. bath room. (mep under separate permit) | $32,000 |
| Feb 18, 2014 | Completed final sign-off Sep 2014 | 2165 Revere Av | remodel kitchen, two & half bathrooms & replace interior finished with 5/8" typ. "x" gyp. bd. @ 2/f. no change on walls.Details
remodel kitchen, two & half bathrooms & replace interior finished with 5/8" typ. "x" gyp. bd. @ 2/f. no change on walls. | $39,700 |
| Jan 24, 2014 | Completed final sign-off Mar 2014 | 956 Goettingen St | comply with complaint #201446401 & 201264721: remodel kitchen & bathroom at 2nd floor. add storage & full bath at 1st floor.Details
comply with complaint #201446401 & 201264721: remodel kitchen & bathroom at 2nd floor. add storage & full bath at 1st floor. | $35,300 |
| Jan 17, 2014 | Completed final sign-off Jun 2014 | 2620 Kirkham St | remodel kitchen & 2 bathrooms at 2/f; to comply with cec150(k) 8 & 10Details
remodel kitchen & 2 bathrooms at 2/f; to comply with cec150(k) 8 & 10 | $31,000 |
| Dec 16, 2013 | Never finaled issued Feb 2014, no final | 795 Foerster St | revision to app#201305136760. reconfigured front stairs. relocate kitchen. add new skylight. add new bathroom on lower floor. replace windows at front facade.Details
revision to app#201305136760. reconfigured front stairs. relocate kitchen. add new skylight. add new bathroom on lower floor. replace windows at front facade. | $27,300 |
| Oct 11, 2013 | Completed final sign-off Jan 2014 | 174 Edinburgh St | remodel kitchen and bathroom in 2nd floor.Details
remodel kitchen and bathroom in 2nd floor. | $12,000 |
| Sep 19, 2013 | Completed final sign-off Sep 2014 | 207 Los Palmos Dr | revision tro appl #2008.05.06.1381: interior remodel, add (4) skylights, 2nd floor relocation of (e) window & (e) door at rear facade & add (n) full bathroom.Details
revision tro appl #2008.05.06.1381: interior remodel, add (4) skylights, 2nd floor relocation of (e) window & (e) door at rear facade & add (n) full bathroom. | |
| Sep 19, 2013 | Completed final sign-off Sep 2014 | 213 Los Palmos Dr | revision tro appl #2008.05.06.1387: interior remodel, add (n) skylights, 2nd floor relocation of (e) window & (e) door at rear facade & add (n) full bathroom.Details
revision tro appl #2008.05.06.1387: interior remodel, add (n) skylights, 2nd floor relocation of (e) window & (e) door at rear facade & add (n) full bathroom. | |
| Sep 19, 2013 | Completed final sign-off Sep 2014 | 203 Los Palmos Dr | revision to appl #2008.05.06.1388: interior remodel, add (n) skylights, 2nd floor add (n) window at left exterior facade & relocation of (e) window & (e) door at rear facade & add (n) full bathroom.Details
revision to appl #2008.05.06.1388: interior remodel, add (n) skylights, 2nd floor add (n) window at left exterior facade & relocation of (e) window & (e) door at rear facade & add (n) full bathroom. | |
| Sep 12, 2013 | Completed final sign-off Dec 2013 | 533 02nd Av | remodel (e) kitchen & (e) bathroom, no windows or doors on this permitDetails
remodel (e) kitchen & (e) bathroom, no windows or doors on this permit | $10,000 |
| Aug 29, 2013 | Completed final sign-off Oct 2013 | 1001 Pine St | unit #502: remodel kitchen and bathroom @ unit # 502.Details
unit #502: remodel kitchen and bathroom @ unit # 502. | $13,600 |
| Aug 27, 2013 | Completed final sign-off Jul 2014 | 2226 Taraval St | on extg vacant constuction. 8 new massage therapy and relaxation rooms with accessible bathroom, suana, steam room. excercise equipment area and offdice space. compliance with ordinance no. 155-13 not required. excavation<50 cu.yd.Details
on extg vacant constuction. 8 new massage therapy and relaxation rooms with accessible bathroom, suana, steam room. excercise equipment area and offdice space. compliance with ordinance no. 155-13 not required. excavation<50 cu.yd. | $85,000 |
| Jul 22, 2013 | Never finaled issued Jul 2013, no final | 1030 Capitol Av | add 2 bedrooms, a family room, 1 full bathroom on 1st floor for single family use onlyDetails
add 2 bedrooms, a family room, 1 full bathroom on 1st floor for single family use only | $48,000 |
| Jun 27, 2013 | Completed final sign-off Aug 2013 | 2265 33rd Av | to comply w/nov dated 6.14.13 #201306241 - legalize (e) family room, bathroom, storage room at ground floor per plan.Details
to comply w/nov dated 6.14.13 #201306241 - legalize (e) family room, bathroom, storage room at ground floor per plan. | $20,000 |
| Jun 12, 2013 | Completed final sign-off Jun 2013 | 667 Monterey Bl | to comply with nov #201307561, fix fire damage of work done in bathroom.Details
to comply with nov #201307561, fix fire damage of work done in bathroom. | $2,000 |
| Apr 26, 2013 | Completed final sign-off Aug 2013 | 9 Scotia Av | legalize 1 bedroom, storage, 1 full bathroom & laundry room at ground floorDetails
legalize 1 bedroom, storage, 1 full bathroom & laundry room at ground floor | $31,500 |
| Feb 8, 2013 | Expired or cancelled expired Jun 2022 | 189 Santa Ynez Av | 1)comply with complaint #201383621. 2)addition work to approved app#201212105774. remodel extg kitchen, bathroom, and add one full bath at 2nd floor. 3)restore light well to previous extg condition.Details
1)comply with complaint #201383621. 2)addition work to approved app#201212105774. remodel extg kitchen, bathroom, and add one full bath at 2nd floor. 3)restore light well to previous extg condition. | $26,800 |
| Jan 23, 2013 | Completed final sign-off Jan 2014 | 2570 21st Av | remodel (e) kitchen and one bathroom at 2nd floorDetails
remodel (e) kitchen and one bathroom at 2nd floor | $11,000 |
| Jan 22, 2013 | Completed final sign-off Aug 2013 | 26 Waldo Al | remodel (e) kitchen and one (e) bathroom. no structural work. repair (e) deck, less than 50%.Details
remodel (e) kitchen and one (e) bathroom. no structural work. repair (e) deck, less than 50%. | $11,000 |
| Jan 22, 2013 | Completed final sign-off Aug 2013 | 24 Waldo Al | remodel (e) kitchen and one (e) bathroom. no structural work. repair (e) deck, less than 50%.Details
remodel (e) kitchen and one (e) bathroom. no structural work. repair (e) deck, less than 50%. | $11,000 |
| Nov 13, 2012 | Completed final sign-off Feb 2013 | 2239 20th Av | legalize 2 bedrooms, 1 full bath, laundry room at ground floorDetails
legalize 2 bedrooms, 1 full bath, laundry room at ground floor | $32,600 |
| Oct 15, 2012 | Completed final sign-off Feb 2013 | 2239 20th Av | remodel kitchen & two bathrooms at 2nd floor. repair front stair in kind, less than 50&. replace 18 windows, (5 at front to be aluminum casement).Details
remodel kitchen & two bathrooms at 2nd floor. repair front stair in kind, less than 50&. replace 18 windows, (5 at front to be aluminum casement). | $30,800 |
| Oct 1, 2012 | Never finaled issued Oct 2012, no final | 2900 Jennings St | comply with complaint# 201206201-remodel bathroom at 2nd floor, replace fixtures in same location & re-tile floor & wall.Details
comply with complaint# 201206201-remodel bathroom at 2nd floor, replace fixtures in same location & re-tile floor & wall. | $9,000 |
| Sep 13, 2012 | Completed final sign-off Sep 2013 | 28 Meda Av | revision to pa# 2012-0813-7241-relocate 2 bathrooms at 3rd floor. add 4 new dormers & skylight, re-roofing. replace (e) window on 3rd floor at front in kind.Details
revision to pa# 2012-0813-7241-relocate 2 bathrooms at 3rd floor. add 4 new dormers & skylight, re-roofing. replace (e) window on 3rd floor at front in kind. | $23,600 |
| Sep 6, 2012 | Completed final sign-off Oct 2012 | 801 Capitol Av | remodel (e) kitchen and 2 (e) bathrooms @ 2/f, replace windows in kind, r=0.40 max, not visable from street, no structural work.Details
remodel (e) kitchen and 2 (e) bathrooms @ 2/f, replace windows in kind, r=0.40 max, not visable from street, no structural work. | $25,000 |
| Sep 5, 2012 | Completed final sign-off Jan 2015 | 772 47th Av | remodel kitchen & 3 bathrooms at 2/f, remove & replace interior finish with 1/2 gyp. board.Details
remodel kitchen & 3 bathrooms at 2/f, remove & replace interior finish with 1/2 gyp. board. | $39,800 |
| Aug 29, 2012 | Completed final sign-off Oct 2013 | 441 Yerba Buena Av | (e) driveway to be replace with (n) concrete. (e) concrete flooring in garage., storage room to be replaced (n) concrete flooring on basement. replace (n) garage door. remodel work in the playroom, bathroom on the basement floor include restoration 200s.f. of termite damage (rear wall).Details
(e) driveway to be replace with (n) concrete. (e) concrete flooring in garage., storage room to be replaced (n) concrete flooring on basement. replace (n) garage door. remodel work in the playroom, bathroom on the basement floor include restoration 200s.f. of termite damage (rear wall). | $20,000 |
| Aug 13, 2012 | Completed final sign-off Sep 2013 | 28 Meda Av | comply with complaint #201251821, 201254461 & 201255281. rev to app #201207134840. 1st fl: add 2 bedroom, 2 bathrooms & laundry. 2nd fl: relcate kitchen, bathroom, install (n) fireplace, add half bath & laundry closet. 3rd fl: add one & half bathroom.Details
comply with complaint #201251821, 201254461 & 201255281. rev to app #201207134840. 1st fl: add 2 bedroom, 2 bathrooms & laundry. 2nd fl: relcate kitchen, bathroom, install (n) fireplace, add half bath & laundry closet. 3rd fl: add one & half bathroom. | $68,000 |
| Jul 24, 2012 | Completed final sign-off Dec 2012 | 2466 27th Av | comply with complaint# 200684112, 201240922, 201240923 & 201240924- remove sink, countertop, unpermitted corrugated fiberglass roof & wall at rear yard. legalize bedroom, storage, laundry, bathroom at ground floorDetails
comply with complaint# 200684112, 201240922, 201240923 & 201240924- remove sink, countertop, unpermitted corrugated fiberglass roof & wall at rear yard. legalize bedroom, storage, laundry, bathroom at ground floor | $33,500 |