Back to bathroom remodel contractors
Lee & Company Contractors Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2010 to Nov 2025
- Last 24 months
- 1 permit filed
146 permits since 2000: 130 completed, 9 never finaled, 7 expired or cancelled.
Of the 9 never-finaled permits, 3 are 5 to 10 years old, 6 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
55 bathroom remodel permits: 51 completed, 4 never finaled. Typically 1 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 8, 2023 | Completed final sign-off Mar 2024 | 988 Guerrero St | in-kind kitchen remodel, laundry room, powder room, bathroom/bar remodel. all interior. 3rd floor remodel.Details
in-kind kitchen remodel, laundry room, powder room, bathroom/bar remodel. all interior. 3rd floor remodel. | $200,000 |
| Jan 28, 2022 | Completed final sign-off Nov 2022 | 155 Clipper St | remodel of existing primary bathroom, new finishes and addition of tub in kids bathroom; relocation of washer/dryer, primary clost expansion into primary bedroom; new dining room cabinetryDetails
remodel of existing primary bathroom, new finishes and addition of tub in kids bathroom; relocation of washer/dryer, primary clost expansion into primary bedroom; new dining room cabinetry | $120,000 |
| Aug 19, 2021 | Completed final sign-off Dec 2021 | 289 29th Av | remodel of e bath. demo of 1 non load bearing wall. infill 1 door. no exterior workDetails
remodel of e bath. demo of 1 non load bearing wall. infill 1 door. no exterior work | $75,000 |
| Oct 30, 2019 | Completed final sign-off Mar 2020 | 973 14th St | remodel (2) existing bathrooms - replace (e) fixtures and finisher, replace (e) decorative loght fixtures, new cabinetry in master bedroom, new tiles at entry way, new interior paint. master bath, 30sq ft; guest bath,30 sq ftDetails
remodel (2) existing bathrooms - replace (e) fixtures and finisher, replace (e) decorative loght fixtures, new cabinetry in master bedroom, new tiles at entry way, new interior paint. master bath, 30sq ft; guest bath,30 sq ft | $80,000 |
| Jun 21, 2019 | Completed final sign-off Jun 2021 | 289 29th Av | interior remodel of basement. new lowered foundation. additional new conditioned space. new full bath. renovated laundry room. new driveway at rearDetails
interior remodel of basement. new lowered foundation. additional new conditioned space. new full bath. renovated laundry room. new driveway at rear | $400,000 |
| Oct 5, 2018 | Completed final sign-off May 2019 | 729 27th Av | removal of interior finishes in kitchen and powder bath, new appliances, cabinetry, recessed lighting throughout main level, relocation of interior wall to include new structural beams, renovation of power bath to include new plumbing fixtures, aeras of work in main level include entry hall,Details
removal of interior finishes in kitchen and powder bath, new appliances, cabinetry, recessed lighting throughout main level, relocation of interior wall to include new structural beams, renovation of power bath to include new plumbing fixtures, aeras of work in main level include entry hall, | $400,000 |
| Jul 25, 2018 | Never finaled issued Aug 2018, no final | 116 Beaumont Av | renovation of existing bath, addition of half bath, misc electrical and millworkDetails
renovation of existing bath, addition of half bath, misc electrical and millwork | $150,000 |
| May 25, 2018 | Completed final sign-off Aug 2018 | 1000 03rd St | #1507: install new cabinetry in kitchen , bedrooms, office & baths. relocate outlets to fit new configurations. new paint throughout. bathroom base cabinets to be removable type per housing authority requirement.Details
#1507: install new cabinetry in kitchen , bedrooms, office & baths. relocate outlets to fit new configurations. new paint throughout. bathroom base cabinets to be removable type per housing authority requirement. | $60,000 |
| Jun 8, 2017 | Completed final sign-off Oct 2017 | 2629 Pierce St | removal and replacement of plumbing fixtures and tiles, in kind in 3rd level guest bathroom.Details
removal and replacement of plumbing fixtures and tiles, in kind in 3rd level guest bathroom. | $20,000 |
| May 23, 2017 | Completed final sign-off Oct 2017 | 1261 Noe St | kitchen remodel, rear window replacement, expand e 1/2 bath to include new shower, convert e closet to laundryDetails
kitchen remodel, rear window replacement, expand e 1/2 bath to include new shower, convert e closet to laundry | $75,000 |
| Apr 24, 2017 | Completed final sign-off May 2018 | 2842 Pierce St | remodel existing unit 2842 - modify existing walls, add new bathroom, add new bedroom, relocate kitchen & laundry roomsDetails
remodel existing unit 2842 - modify existing walls, add new bathroom, add new bedroom, relocate kitchen & laundry rooms | $30,000 |
| Feb 3, 2017 | Completed final sign-off Aug 2017 | 1626 Vallejo St | apt g- remove/replace int incl demo non-struct walls, install new recessed lighting thru-out, install new kitchen appliances, new casework, renovate (e) bath incl remove/replace plbg fixtures in kind. add new powder room (toilet and sink),add new washer/dryer closet, painting & hall closet.Details
apt g- remove/replace int incl demo non-struct walls, install new recessed lighting thru-out, install new kitchen appliances, new casework, renovate (e) bath incl remove/replace plbg fixtures in kind. add new powder room (toilet and sink),add new washer/dryer closet, painting & hall closet. | $75,000 |
| Oct 4, 2016 | Completed final sign-off Dec 2016 | 51 Sotelo Av | install new bathroom finishes, all locations/fixtures to be replaced in kind.Details
install new bathroom finishes, all locations/fixtures to be replaced in kind. | $25,000 |
| Sep 23, 2016 | Completed final sign-off Sep 2017 | 1985 15th St | revision to 201509106603r2: reconfigure bathroom on 3rd. revise window operation on 3rd. new fireplace at 3rd flr.Details
revision to 201509106603r2: reconfigure bathroom on 3rd. revise window operation on 3rd. new fireplace at 3rd flr. | $5,000 |
| Jul 29, 2016 | Completed final sign-off Feb 2017 | 1342 Filbert St | renovation of (e) kitchen including removal of wall & new appliances & casework. conversion of (e) powder room into new master bath including addition of shower & replacement of toilet in (e) location. new lighting in areas of alteration - no exterior workDetails
renovation of (e) kitchen including removal of wall & new appliances & casework. conversion of (e) powder room into new master bath including addition of shower & replacement of toilet in (e) location. new lighting in areas of alteration - no exterior work | $100,000 |
| Mar 29, 2016 | Completed final sign-off Oct 2016 | 280 Sussex St | remodel (e) bedroom & bathroom & add new family room, add new cabientry for storage, add new lighting fixtures.new family room on ground floor.Details
remodel (e) bedroom & bathroom & add new family room, add new cabientry for storage, add new lighting fixtures.new family room on ground floor. | $80,000 |
| Jan 6, 2016 | Completed final sign-off Nov 2016 | 109 Gates St | rev. to pa#201310038400, & new skylight on 3/f, not visable from street -new skylight at roof, new rear window at 2nd. exclude proposed rear deck at 1st flr. new structural angle brace at exisitng rear deck. new master bedroom and bathroom at 3rd floorDetails
rev. to pa#201310038400, & new skylight on 3/f, not visable from street -new skylight at roof, new rear window at 2nd. exclude proposed rear deck at 1st flr. new structural angle brace at exisitng rear deck. new master bedroom and bathroom at 3rd floor | $20,000 |
| Sep 18, 2015 | Never finaled issued Jun 2016, no final | 4433 17th St | interior remodel to an existing s.f. residence. work includes reconfiguration of existing bath & addition of new bth. replacement of existing french doors. updating interior finsihes.Details
interior remodel to an existing s.f. residence. work includes reconfiguration of existing bath & addition of new bth. replacement of existing french doors. updating interior finsihes. | $100,000 |
| Sep 10, 2015 | Completed final sign-off Sep 2017 | 1985 15th St | convert (e) attic to habitable space. (n)habitable space to contain two bedrooms and one bathroom. (n) code compliant stair to attic. (n) dormer over stair and (n) dormer in master bedroomDetails
convert (e) attic to habitable space. (n)habitable space to contain two bedrooms and one bathroom. (n) code compliant stair to attic. (n) dormer over stair and (n) dormer in master bedroom | $100,000 |
| Jul 13, 2015 | Completed final sign-off Oct 2015 | 549 Anderson St | rev to 201504294890 - existing window opening to be kept, ie. not to be blocked up, in bathroom of level 2.Details
rev to 201504294890 - existing window opening to be kept, ie. not to be blocked up, in bathroom of level 2. | |
| Jun 4, 2015 | Completed final sign-off Jun 2015 | 555 Dolores St | adding of plumbing and cabinet replacement in bathroom to permit # 201411192025. update plumbing fixtures only per plumbing permit #pw20150518410Details
adding of plumbing and cabinet replacement in bathroom to permit # 201411192025. update plumbing fixtures only per plumbing permit #pw20150518410 | $2,000 |
| May 28, 2015 | Completed final sign-off Jul 2015 | 3326 Cabrillo St | remodel one bath. installnew finishes (tile, cabinetry, flooring) in (e) 2nd fl bathroom. no change in walls & openings layout. lighting change sall be high efficacy or controlled by manual on sensor & with one main light with high efficacy.Details
remodel one bath. installnew finishes (tile, cabinetry, flooring) in (e) 2nd fl bathroom. no change in walls & openings layout. lighting change sall be high efficacy or controlled by manual on sensor & with one main light with high efficacy. | $20,000 |
| Apr 29, 2015 | Completed final sign-off Oct 2015 | 549 Anderson St | construct new interior stairway and build 2 bedrooms. 1 bathroom on 1st floor. fill in lightwell. convert (e) bedroom into ofc.Details
construct new interior stairway and build 2 bedrooms. 1 bathroom on 1st floor. fill in lightwell. convert (e) bedroom into ofc. | $75,000 |
| Mar 26, 2015 | Completed final sign-off Jun 2015 | 1425 Golden Gate Av | add new bathroom to upper floor per planDetails
add new bathroom to upper floor per plan | $18,000 |
| Jan 6, 2015 | Completed final sign-off Aug 2015 | 1425 Golden Gate Av | remodel existing bathroom. new plumbing and elec fixtures in existing places,new tile paintDetails
remodel existing bathroom. new plumbing and elec fixtures in existing places,new tile paint | $18,000 |
| Dec 1, 2014 | Completed final sign-off Apr 2015 | 155 Terrace Dr | replace existing cabinetry in kind at pantry, kitchen and bathrooms; add recessed can light at pantry, install sconces over outlets in dining area, add outlet in master bath and sconces. replace plumbing fixture in kind in upstairs bathrooms.Details
replace existing cabinetry in kind at pantry, kitchen and bathrooms; add recessed can light at pantry, install sconces over outlets in dining area, add outlet in master bath and sconces. replace plumbing fixture in kind in upstairs bathrooms. | $5,000 |
| Nov 18, 2014 | Completed final sign-off Dec 2014 | 1650 Jackson St | #301 - remodel existing bthroom in-kind. replace shower fixtures, install new vanity toilet, & new tile throughout. install two new recessed can lights, two wall sconces & 1 new bathroom fan.Details
#301 - remodel existing bthroom in-kind. replace shower fixtures, install new vanity toilet, & new tile throughout. install two new recessed can lights, two wall sconces & 1 new bathroom fan. | $10,000 |
| Nov 7, 2014 | Completed final sign-off Sep 2016 | 49 Everson St | kitchen remodel and powder room remodel on top floor. new skylights above kitchen. 2 full bath remodels on 1st flDetails
kitchen remodel and powder room remodel on top floor. new skylights above kitchen. 2 full bath remodels on 1st fl | $50,000 |
| Nov 6, 2014 | Completed final sign-off May 2015 | 1954 15th St | the project consists of the renovation of the upper unit. the work includes kitchen & bath remodel, new casework in the living room, & new electrical & lighting in specific locations.Details
the project consists of the renovation of the upper unit. the work includes kitchen & bath remodel, new casework in the living room, & new electrical & lighting in specific locations. | $105,000 |
| Aug 5, 2014 | Completed final sign-off Dec 2014 | 3101 Washington St | remodel three (e) bathrooms, replace (e) fixtures, finishes, cabinetry, etc., install cabinet end wall to cpature approximately 36" of cabinet edges in master bedroom.Details
remodel three (e) bathrooms, replace (e) fixtures, finishes, cabinetry, etc., install cabinet end wall to cpature approximately 36" of cabinet edges in master bedroom. | $75,000 |
| Mar 25, 2014 | Completed final sign-off Jan 2017 | 1682 44th Av | rear 1-story addition: master bedroom & bathDetails
rear 1-story addition: master bedroom & bath | $35,000 |
| Mar 4, 2014 | Never finaled issued Mar 2014, no final | 171 Devonshire Wy | remodle ktichen,dining room, living room, bath #1, master bedroom, m. bath. replace existing winodw sashes. add (3) new ksylights, rebuild (1) existing skylight. legalize (e) guestroom & bath #2 on ground floor.ref #2014.0114.6276.Details
remodle ktichen,dining room, living room, bath #1, master bedroom, m. bath. replace existing winodw sashes. add (3) new ksylights, rebuild (1) existing skylight. legalize (e) guestroom & bath #2 on ground floor.ref #2014.0114.6276. | $150,000 |
| Jan 24, 2014 | Completed final sign-off Apr 2014 | 126 Belvedere St | remodel (e) bathroom, replacing (e) plumbing and lighting fixtures to comply with cec 150(k). no change to doors and windowsDetails
remodel (e) bathroom, replacing (e) plumbing and lighting fixtures to comply with cec 150(k). no change to doors and windows | $20,000 |
| Jan 14, 2014 | Never finaled issued Jan 2014, no final | 171 Devonshire Wy | remodel 2 bathrooms and one kitchen, repair existing cabinetry lighting and flooring/tile. install new flooring throughout, no change to existing layout no walls moved removed or added.Details
remodel 2 bathrooms and one kitchen, repair existing cabinetry lighting and flooring/tile. install new flooring throughout, no change to existing layout no walls moved removed or added. | $60,000 |
| Dec 23, 2013 | Completed final sign-off Mar 2014 | 1301 Clay St | unit 3: remodel (e) bathroom. install new plumbing fixtures, tile & flooring. install new cabinetry in dining room & refinish floor.Details
unit 3: remodel (e) bathroom. install new plumbing fixtures, tile & flooring. install new cabinetry in dining room & refinish floor. | $70,000 |
| Sep 9, 2013 | Completed final sign-off Dec 2014 | 527 Alvarado St | replace existing kitchen/dining room windows & doors. add 4'-6" addition at lower level. create two bedrooms, two bathrooms & playroom in place of former master bedroom, add 11'-0" deck, stair to yard & spiral stair to main level.Details
replace existing kitchen/dining room windows & doors. add 4'-6" addition at lower level. create two bedrooms, two bathrooms & playroom in place of former master bedroom, add 11'-0" deck, stair to yard & spiral stair to main level. | $85,000 |
| Sep 6, 2013 | Completed final sign-off Aug 2014 | 730 Oak St | remodel existing kitchen with new cabinetry, electrical and floors. remodel master bathroom with new fixtures in existing location.Details
remodel existing kitchen with new cabinetry, electrical and floors. remodel master bathroom with new fixtures in existing location. | $30,000 |
| Jun 19, 2013 | Completed final sign-off Oct 2013 | 2170 Pacific Av | bathroom remodel - remove non-load bearing partitions, relcoate fixtures, relocate elec panel. remove window & replace with smaller unit.Details
bathroom remodel - remove non-load bearing partitions, relcoate fixtures, relocate elec panel. remove window & replace with smaller unit. | $40,000 |
| May 23, 2013 | Completed final sign-off Aug 2013 | 553 Clipper St | add 1 full bathroom, add furnace replacement, window replacementDetails
add 1 full bathroom, add furnace replacement, window replacement | $50,000 |
| May 7, 2013 | Completed final sign-off May 2013 | 540 Hill St | unit #1: install bath fan in first floor bathroomDetails
unit #1: install bath fan in first floor bathroom | $1,000 |
| Apr 30, 2013 | Completed final sign-off Apr 2014 | 45 San Leandro Wy | remodel two bathrooms, update fixtuers, relocate existing interior doors, and add closet space in bedroom. bath lighting will be high efficacy or occupancy sensors. existing bath fan to remainDetails
remodel two bathrooms, update fixtuers, relocate existing interior doors, and add closet space in bedroom. bath lighting will be high efficacy or occupancy sensors. existing bath fan to remain | $50,000 |
| Feb 11, 2013 | Completed final sign-off Apr 2013 | 308 Laurel St | bathroom remodelDetails
bathroom remodel | $43,000 |
| Feb 1, 2013 | Completed final sign-off Mar 2013 | 278 Upper Tr | install new counter tops in existing kitchen with new plumbing fixtures, install new recessed can lighting in kitchen, paint walls & ceiling in kitchen. install new shower surround in bathroom, tile floor and walls, install new shower valves, shower head & toilet. paint walls & ceiling in bathroom.Details
install new counter tops in existing kitchen with new plumbing fixtures, install new recessed can lighting in kitchen, paint walls & ceiling in kitchen. install new shower surround in bathroom, tile floor and walls, install new shower valves, shower head & toilet. paint walls & ceiling in bathroom. | $15,000 |
| Jan 29, 2013 | Completed final sign-off Sep 2013 | 1545 Beach St | revision to 201210011016. revise the layout of bathroom on the first floor and change the master bath on second floor, relocateion of windows and doors per plan. reduction of structural work; 3rd flr is being removedDetails
revision to 201210011016. revise the layout of bathroom on the first floor and change the master bath on second floor, relocateion of windows and doors per plan. reduction of structural work; 3rd flr is being removed | |
| Oct 19, 2012 | Completed final sign-off Mar 2013 | 2221 Baker St | build new cabinetry in 1/f living room, i nstall (n) hardwood floor @ master bedroom & 3/f, replace fixtures in 3/f bathroom, no change of walls, tile, fixture to be replaced. (n) vanity & shower. lighting must comply with cec150(k)Details
build new cabinetry in 1/f living room, i nstall (n) hardwood floor @ master bedroom & 3/f, replace fixtures in 3/f bathroom, no change of walls, tile, fixture to be replaced. (n) vanity & shower. lighting must comply with cec150(k) | $40,000 |
| Sep 10, 2012 | Completed final sign-off Feb 2013 | 80 Terrace Dr | interior remodel of (e) bathroom and closets at 2nd floor to create two bathroom and several closets. divide 2nd floor bedroom to create 4th bedroom, remodel 1st floor bathroom, replace various doors.Details
interior remodel of (e) bathroom and closets at 2nd floor to create two bathroom and several closets. divide 2nd floor bedroom to create 4th bedroom, remodel 1st floor bathroom, replace various doors. | $45,000 |
| Apr 23, 2012 | Completed final sign-off Aug 2012 | 527 Alvarado St | remodel extg master bathroom: replace and relocate tub, toilet & sinks. install new lights and fan within the extg space.Details
remodel extg master bathroom: replace and relocate tub, toilet & sinks. install new lights and fan within the extg space. | $15,000 |
| Apr 13, 2012 | Completed final sign-off Jun 2012 | 998 Chenery St | revision to pa# 201203216512. replace additional window at property rear in bathroom in kind. max u factor 0.40.Details
revision to pa# 201203216512. replace additional window at property rear in bathroom in kind. max u factor 0.40. | $500 |
| Apr 13, 2012 | Completed final sign-off Mar 2013 | 1674 Golden Gate Av | replace finishes & cabinetry in upstairs & downstairs bathroom and install new cabinetry, plumbing, electrical at the kitchen. install one new bay window to replace (e) two window in the ktichen and relocate one bay window of guest bedroom at property rear on level ii. lighting to comply with cecDetails
replace finishes & cabinetry in upstairs & downstairs bathroom and install new cabinetry, plumbing, electrical at the kitchen. install one new bay window to replace (e) two window in the ktichen and relocate one bay window of guest bedroom at property rear on level ii. lighting to comply with cec | $120,000 |
| Feb 21, 2012 | Completed final sign-off Apr 2012 | 201 Gates St | remodel existing bathroom on the first floor. upgrade plumbing. replace bath tub, sink, toilet & tile. bathroom on middle level. permanetly installed lights in bathroom shall be high efficency unless they are controlled by manual on occupancy sensor.Details
remodel existing bathroom on the first floor. upgrade plumbing. replace bath tub, sink, toilet & tile. bathroom on middle level. permanetly installed lights in bathroom shall be high efficency unless they are controlled by manual on occupancy sensor. | $10,000 |
| Jan 6, 2012 | Completed final sign-off Mar 2012 | 221 Gates St | kitchen remodel, remove old cabinets and replace with new. bathroom update, replace existing fixtures, tile and replace with new. no change on walls and openings.Details
kitchen remodel, remove old cabinets and replace with new. bathroom update, replace existing fixtures, tile and replace with new. no change on walls and openings. | $15,000 |
| Dec 20, 2011 | Completed final sign-off Jul 2012 | 178 Douglass St | remodel kitchen & bathroom, creation of new bathroom in (e) closet, modification of closet, window replacement. new windows at bathrooms. no changes to building footprint. no habitable space at ground levelDetails
remodel kitchen & bathroom, creation of new bathroom in (e) closet, modification of closet, window replacement. new windows at bathrooms. no changes to building footprint. no habitable space at ground level | $75,000 |
| Nov 23, 2011 | Completed final sign-off Feb 2012 | 300 03rd St | install kitchen cabinets in (e) locations. upgrade electrical in kitchen. lower sink vent pipe to allow for bathroom bar.Details
install kitchen cabinets in (e) locations. upgrade electrical in kitchen. lower sink vent pipe to allow for bathroom bar. | $10,000 |
| Aug 5, 2011 | Completed final sign-off Jul 2012 | 311 Waller St | renovate (e) kitchen & bath; add four dormers to attic & build new mezzanine above reconfigured living dining room. new doors and windows at rear of unit, create new roof deck above (e) kitchen and add new balcony off kitchenDetails
renovate (e) kitchen & bath; add four dormers to attic & build new mezzanine above reconfigured living dining room. new doors and windows at rear of unit, create new roof deck above (e) kitchen and add new balcony off kitchen | $110,000 |
| May 9, 2011 | Completed final sign-off Aug 2011 | 204 Ellsworth St | replace (e) 1 bathroom finshes - new tile, shower and sink. remove and replace (e) 1 kitchen cabinets. kitchen flooring to remain & electric lighting to remain existing. no change to windows, walls, doors.Details
replace (e) 1 bathroom finshes - new tile, shower and sink. remove and replace (e) 1 kitchen cabinets. kitchen flooring to remain & electric lighting to remain existing. no change to windows, walls, doors. | $12,000 |