Block 2839, lot 041
51 Sotelo Ave
- City’s use
- Single Family Residential
- Built
- 1914
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 2,611 sq ft
- Lot
- 6,724 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 12, 2022 | Completed final sign-off Sep 2022 | 51 Sotelo Av | U S A Hauling Inc Dba Atlas U S A Concre | entry stair replair. demo (7) damaged risers and replace in-kind, less than 50% of existing work to be replaced.Details
entry stair replair. demo (7) damaged risers and replace in-kind, less than 50% of existing work to be replaced. | $2,500 |
| Jun 22, 2018 | Completed final sign-off Jul 2018 | 51 Sotelo Av | Master Roofing Systems Inc. | reroofingDetails
reroofing | $18,000 |
| Jun 14, 2018 | Never finaled issued Jun 2018, no final | 51 Sotelo Av | street spaceDetails
street space | ||
| Oct 4, 2016 | Completed final sign-off Dec 2016 | 51 Sotelo Av | Lee & Company Contractors Inc | install new bathroom finishes, all locations/fixtures to be replaced in kind.Details
install new bathroom finishes, all locations/fixtures to be replaced in kind. | $25,000 |
| May 14, 2014 | Completed final sign-off Oct 2014 | 51 Sotelo Av | Lee & Company Contractors Inc | remodel existing kitchen. remove and replace cabinetry, appliances, fixtures. remove and replace existing kitchen windows in kindDetails
remodel existing kitchen. remove and replace cabinetry, appliances, fixtures. remove and replace existing kitchen windows in kind | $100,000 |
| Apr 18, 2011 | Completed final sign-off Aug 2011 | 51 Sotelo Av | Moroso Construction Inc | demo/existing finishes, plumbing and electrical fixtures at master bathrm, replace elec and plumbing fixtures, drywall, tile, paint and vanity, site verification will be made at time of inspection regarding expired permit for rear addition work never started or doneDetails
demo/existing finishes, plumbing and electrical fixtures at master bathrm, replace elec and plumbing fixtures, drywall, tile, paint and vanity, site verification will be made at time of inspection regarding expired permit for rear addition work never started or done | $25,000 |
| Feb 18, 2010 | Never finaled issued Feb 2010, no final | 51 Sotelo Av | street space permitDetails
street space permit | ||
| Feb 10, 2010 | Never finaled issued Feb 2010, no final | 51 Sotelo Av | street space and sidewalkDetails
street space and sidewalk | ||
| Jul 27, 2009 | Completed final sign-off May 2010 | 51 Sotelo Av | Brinton Construction Inc | expand existing underground garage. no change to existing curb cut.Details
expand existing underground garage. no change to existing curb cut. | $49,000 |
| Mar 7, 2006 | Never finaled issued Mar 2006, no final | 51 Sotelo Av | sidewalkDetails
sidewalk |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Lee & Company Contractors Inc (2), Brinton Construction Inc, Master Roofing Systems Inc., Moroso Construction Inc, U S A Hauling Inc Dba Atlas U S A Concre
- Architects
- Paul Bessieres
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.